Germany: Tenders/Trianel BESS 1 GmbH & Co. KG/TBESS EPC

TBESS EPC

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Dec 8, 2025Expired
Award
quality award criteria, weight 40
Procedure
With negotiationTwo stages
Agreement
Construction workover 3 years

Brief

The subject matter of the contract is the engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 80 MW of active power consumption and feed-in and a usable storage capacity of at least 160 MWh at the time of commissioning. It also within the allocated land plot. includes the inverters and transformer stations since there is 33 kV voltage at the grid connection point, as well as the electrical connection 33kV switching station up to the connection point at the point of connection of the transformer stations to the grid connection point and all ancillary equipment and infrastructure necessary for proper and safe operation. Construction will take place on the site of Trianel Batteriepark Waltrop GmbH & Co. KG (TBW) in 45731 Waltrop, Germany. For further information please see tender documents.

Drivstoff og brensel

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Trianel BESS 1 GmbH & Co. KG

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Qualification requirements

  • Description

    Company needs to be registered in a country that is member of the European union.

    Documentation Requirement

    Provision of excerpt from the trade register or a register which is similar if applicable (entities which do not have to be registered are not required to provide an excerpt).

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Company presentation including ownership structure, scope of services, manning level (separated in blue- / white-collar employees).

    Documentation Requirement

    Provision of a company presentation including ownership structure, scope of services, manning level (separated in blue- / white-collar employees).

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Signed declaration about the non-fulfilment of competition exclusion reasons in order to §§ 123 (1) and (4), 124 of the Act against Restraints on Competition (GWB).

    Documentation Requirement

    Provision of the signed declaration about the non-fulfilment of competition exclusion reasons in order to §§ 123 (1) and (4), 124 of the Act against Restraints on Competition (GWB) - a template was made available to the bidders.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Signed declaration for EU sanctions against Russia.

    Documentation Requirement

    Provision of the signed declaration for EU sanctions against Russia - a template was made available to the bidders.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Signed declaration on the Code of conduct.

    Documentation Requirement

    Provision of the signed declaration on the Code of conduct - a template was made available to the bidders.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Mention the regulatory proceedings, if applicable.

    Documentation Requirement

    Please mention the regulatory proceedings, if applicable.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Mention project failures with details regarding the possible reason in an annex, if applicable.

    Documentation Requirement

    Are there any project failures? Please mention them with details regarding the possible reason in an annex, if applicable.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Filled-out KYC questionnaire.

    Documentation Requirement

    Provision of the filled-out KYC questionnaire - a template was made available to the bidders.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Filled-out / signed beneficial owner form.

    Documentation Requirement

    Provision of the filled-out / signed beneficial owner form - a template was made available to the bidders.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    A valid certification is required according to: DIN EN ISO 9001 Quality management systems - Requirements or equivalent.

    Documentation Requirement

    A valid certification is required according to: DIN EN ISO 9001 Quality management systems - Requirements or equivalent.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    A valid certification is required according to: DIN EN ISO 14001 Environmental management systems - Requirements with guidance for use or equivalent.

    Documentation Requirement

    A valid certification is required according to: DIN EN ISO 14001 Environmental management systems - Requirements with guidance for use or equivalent.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    A valid certification is required according to: DIN ISO 45001 - 2023-06 Occupational health and safety management systems - Requirements with guidance for use or equivalent.

    Documentation Requirement

    A valid certification is required according to: DIN ISO 45001 DIN ISO 45001 - 2023-06 Occupational health and safety management systems - Requirements with guidance for use or equivalent.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Valid certification appropriate to the scope is required. ISO/IEC 27001:2022 [Information Security, Cybersecurity and Privacy Protection - Information Security Management Systems - Requirements] or comparable information security certification.

    Documentation Requirement

    Valid certification appropriate to the scope is required. ISO/IEC 27001:2022 [Information Security, Cybersecurity and Privacy Protection - Information Security Management Systems - Requirements] or comparable information security certification.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    At least one reference of operational battery storage or battery storage under construction in EU or UK with 30MW+ as EPC-Contractor or comparable projects as EPC-Contractor in the energy sector.

    Documentation Requirement

    At least one reference of operational battery storage or battery storage under construction in EU or UK with 30MW+ as EPC-Contractor or comparable projects as EPC-Contractor in the energy sector.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    At least one reference of contract conclusion of battery storage in Germany with 10MW+ as EPC-Contractor or a converter-based energy project that is subject to comparable permitting requirements in Germany.

    Documentation Requirement

    At least one reference of contract conclusion of battery storage in Germany with 10MW+ as EPC-Contractor or a converter-based energy project that is subject to comparable permitting requirements in Germany.

    Source

    No source found in the documents. Check the requirement against the tender documents.

  • Description

    Contractor is either the manufacturer or should have an existing framework agreement with suppliers of main components (Lithium Ion or Natrium Ion Battery and Inverter) or comparable agreements with sufficient production or supplier capacities. Annual production or supplier capacities exceed the procurement volume in terms of power (Inverter) or energy (Battery) by factor 3.

    Documentation Requirement

    Contractor is either the manufacturer or should have an existing framework agreement with suppliers of main components (Lithium Ion or Natrium Ion Battery and Inverter) or comparable agreements with sufficient production or supplier capacities. Annual production or supplier capacities exceed the procurement volume in terms of power (Inverter) or energy (Battery) by factor 3.

    Source

    No source found in the documents. Check the requirement against the tender documents.

Award Criteria

  • Description

    see tender documents

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    see tender documents

    Source

    No source found in the documents. Check the weight against the tender documents.

From the notice

  • The subject matter of the contract is the engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 80 MW of active power consumption and feed-in and a usable storage capacity of at least 160 MWh at the time of commissioning. It also within the allocated land plot. includes the inverters and transformer stations since there is 33 kV voltage at the grid connection point, as well as the electrical connection 33kV switching station up to the connection point at the point of connection of the transformer stations to the grid connection point and all ancillary equipment and infrastructure necessary for proper and safe operation. Construction will take place on the site of Trianel Batteriepark Waltrop GmbH & Co. KG (TBW) in 45731 Waltrop, Germany. For further information please see tender documents.

  • Contact

    b.marten@trianel.com
  • Type
    Competition · Prequalification
  • Location
    Recklinghausen
  • Main code
    Construction work
    45000000
  • 09000000Petroleum products, fuel, electricity and other sources of energy

Similar active competitions

  • Energiespeicher Soltau I GmbH

    Batterisystemer og energilagring

    Schlüsselfertige Errichtung (EPC) eines netzgekoppelten Batteriespeichersystems

    Energiespeicher Soltau I GmbH benötigt die schlüsselfertige Projektierung, Lieferung, Errichtung und Inbetriebnahme eines netzgekoppelten Batteriespeichersystems mit 10–12,5 MW einschließlich Übergabe-Trafostation im Heidekreis. Die Projektlaufzeit beträgt 18 Monate. Für die Eignung sind mindestens zwei realisierte BESS-Referenzen mit jeweils mindestens 5 MW in Europa erforderlich, davon mindestens eine mit Präqualifikation für Regelreserve; Referenzen von Nachunternehmern oder des Batterielieferanten können über Eignungsleihe eingebracht werden. Bewertet werden der normierte Gesamtpreis mit 60 Prozent sowie Wirkungsgrad und Kapazitätserhalt mit jeweils 20 Prozent.

    Competition
    Dec 14, 2026(22 days)
  • Slovenské elektrárne, a.s.

    Batterisystemer og energilagring

    Implementation of Battery Energy Storage System at Čierny Váh

    Slovenské elektrárne, a.s. seeks an EPC contractor to design, permit, supply, install, commission and put into operation a battery energy storage system at Čierny Váh in the Žilinský Region, over approximately 1,234 days. The BESS must provide at least 480 MWh of usable capacity and 120 MW of rated power, connect to the 400 kV substation through a new 400 kV bay, and support frequency reserves, electricity-market services, frequency-response functions and island operation to maintain the pumped-storage plant’s auxiliary supply during loss of its 22 kV connection. The scope includes civil, electrical and mechanical works; battery containers, conversion and control systems, transformers, switchgear and related equipment; integration with existing plant systems; protection, monitoring, communications, fire safety and security; and testing, performance verification, operational training and documentation needed for safe, reliable operation. The contract will be awarded solely on the lowest total price excluding VAT.

    Competition with qualification
    Nov 30, 2026(8 days)
  • Stadtwerke München GmbH

    Elektrisk infrastruktur og veibelysning

    SV-KWE-261023-002 - TW - Batteriespeicher Zengermoos - Errichtung Batteriespeicher Zengermoos

    Die Stadtwerke München GmbH benötigt die schlüsselfertige Errichtung eines Batteriespeichers (BESS) in Zengermoos im Raum München. Für die Teilnahme ist mindestens eine in den letzten drei Jahren fertiggestellte BESS-EPC-Referenzanlage mit mindestens 5 MW Leistung und 10 MWh Kapazität sowie eine Referenz für die Vollwartung von BESS-Anlagen nachzuweisen; außerdem werden Angaben zur qualifizierten Personalstärke verlangt.

    Competition with qualification
    Nov 26, 2026(4 days)