Technical Consultancy Service Frameworks for Greenways and Active Travel, with Local Authorities and Transport Infrastructure Ireland acting as Client
Awarded
The competition has ended and a winner has been selected.
- Deadline
- May 20,Expired
- Award
- Price 30%
Brief
Transport Infrastructure Ireland (TII) has entered into a multi-party framework agreement with Aecom Ireland Ltd, Ove Arup & Partners Ireland Ltd t/a Arup, WSP Ireland Consulting Limited, RPS Consulting Engineers Ltd, McAdam Design Ltd, Mott MacDonald Ireland Ltd, Roughan & O’Donovan Ltd, Sweco Ireland Limited, Fehily Timoney and Company Ltd, SYSTRA Ltd, Amey OW Ireland Limited, RP Tradeco Ltd t/a Roadplan Consulting, WS Atkins Ireland Limited (t/a AtkinsRéalis), Clandillon Civil Consulting Ltd, and JB Barry Transportation Limited, trading as Barry Transportation, for the provision of technical consultancy services for Greenway and Active Travel projects. The services are divided into two lots based on estimated construction value and complexity, covering projects across Ireland. The estimated maximum total value of the contract is 78.83 million EUR. 19 bids were received for this contract.
Rådgivende ingeniørtjenester for bygg og anlegg
Result
- Aecom Ireland LtdWinner
- Amey OW Ireland LimitedWinner
- Clandillon Civil Consulting LtdWinner
- Fehily Timoney and Company LtdWinner
- JB Barry Transportation Limited, trading as Barry TransportationWinner
- 19Number of bids
- Not statedContract value
- Maximum framework agreement valueUp to €78,830,000
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Quality @70%
Source
No source found in the documents. Check the weight against the tender documents.
Description
Price @30%
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Transport Infrastructure Ireland (TII)
From the notice
Transport Infrastructure Ireland (the "Contracting Authority") has a requirement acting as a central purchasing body for 2.no multi-party framework agreements (each a “Framework Agreement”) for the provision of technical consultancy services for the delivery of Greenway and Active Travel projects, together with any ancillary services which may be inferred therefrom, or be necessary to carry out the services (the “Services”). • Lot 1 – Schemes with an Estimated Construction Value of greater than € 10 Million and/or Complex Schemes of Value less than €10 Million – PMG Phases 0 to 7 inclusive • Lot 2 – Schemes with an Estimated Construction Value of less than or equal to € 10 Million – PMG Phases 0 to 7 inclusive A portfolio of over 70 potential projects has been collated at this point and TII have identified a need for significant Technical Advisor Resources to take these projects through the various Phases of the TII Project Management Guidelines (PMGs) and Project Appraisal Guidelines (PAGs). There is considerable variance in the scale, nature, and complexity of these projects, with some envisaged as greenfield schemes, while others are likely to take advantage of existing road, canal, and rail corridors. In more urban areas the projects tend to be Active Travel projects rather than Greenways, that is the delivery of specific purpose walking/cycling infrastructure, as opposed to recreational greenways.
Contact
micheal.oconnor@tii.ie- Result · Framework agreementType
- DublinLocation
- 71300000Main codeEngineering services
- 71311200Transport systems consultancy services71311300Infrastructure works consultancy services71322500Engineering-design services for traffic installations