    Tender for a 100 MVA transformer HAV 34 / 35

    FJERNVARME FYN PRODUKTION A/S

    Tender for a 100 MVA transformer HAV 34 / 35

    1. Competition notice published

      Dec 18, 2023 10:00 AMDecember 18, 2023 10:00 AM
    2. Qualification deadline

      Not stated
    3. Tender submission deadline

      Jan 8, 2024 11:00 AMJanuary 8, 2024 11:00 AM
    4. Invitation to submit tender

      Jan 11, 2024 11:00 PMJanuary 11, 2024 11:00 PM
    5. Tender validity period

      May 8, 2024 10:00 AMMay 8, 2024 10:00 AM
    6. Contract start date

      May 24, 2024 12:00 AMMay 24, 2024 12:00 AM
    7. Contract end date

      Dec 31, 12:00 AMDecember 31, 2026 12:00 AM

    Brief

    Denmark: Tenders/FJERNVARME FYN PRODUKTION A/S/Tender for a 100 MVA transformer HAV 34 / 35

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Qualification deadline
    Jan 8, 2024Expired
    Award
    Pris 35% and 2 more
    Procedure
    With negotiationTwo stages
    Agreement
    Buying goodsuntil Dec 2026

    Brief

    The Scope of Supply shall comprise a complete 3-winding transformer 165/10.5/10.5kV with rated power of 100/50/50MVA. The Supply must be engineered, delivered at foundation, installed, cleaned, tested and documented in accordance with the limits specified and be ready for commercial operation. When completed, the supply must be fit for the purposes for which the supply is intended as defined in the Tender Material.

    Elektrisk infrastruktur og veibelysning

    Register interest

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      The equity must be positive in the latest annual report available as per the deadline of submission of application.

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Information concerning references of similar deliveries including information of transformer size, delivery time and location, cf. the Contract notice section 5.1.9. Similar deliveries are to be understood as: i) 3-winding transformer 165/10.5/10.5kV with rated power of 100/50/50MVA, including engineering, delivery at foundation, installation, cleaning, test and documentation. ii) Delivered / commissioned after the 8’th of January 2021. The references should include a description of the transformer (including included services, MVA etc.) and contact details of the customer referenced (name, mail and phone number). The references should also include date of delivery/commissioning. References which are older than 3 years as per the date of submission of application will not be taken into consideration.

      Documentation Requirement

      The applicants may submit up to 5 references and these may be stated either in the ESPD or in the attached reference sheet, cf. Annex G.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      If more than 4 applicants submit an application, Fjernvarme Fyn will prequalify the 4 applicants who submits the most relevant and similar references considering the scope of supply of this contract (complete 3-winding transformer 165/10.5/10.5kV with rated power of 100/50/50MVA, including engineering, delivery at foundation, installation, cleaning, test and documentation). In this context the similarity of the scope of supply is of higher importance than the number of references and consequently an application including few very similar references will be evaluated better than an application which include 5 only partially relevant references.

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      Technical solution

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Pris

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Delivery date

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      HSE

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at FJERNVARME FYN PRODUKTION A/S

    From the notice

    • The Scope of Supply shall comprise a complete 3-winding transformer 165/10.5/10.5kV with rated power of 100/50/50MVA. The Supply must be engineered, delivered at foundation, installed, cleaned, tested and documented in accordance with the limits specified and be ready for commercial operation. When completed, the supply must be fit for the purposes for which the supply is intended as defined in the Tender Material.

    • Contact

      Laura Meyer Hansenlmh@fjernvarmefyn.dk
    • Type
      Competition · Prequalification
    • Main code
      Transformers
      31170000
    • 31100000Electric motors, generators and transformers31171000Liquid dielectric transformers

    Similar active competitions

    • N1 A/S

      Elektrisk utstyr og belysning

      Qualification system for power transformers

      N1 A/S trenger kvalifikasjonssystem for krafttransformatorer som en del av en leveranseavtale. Anskaffelsen omfatter elektrisk maskineri, apparater, utstyr og forbruksvarer, med fokus på belysning. Det er krav om at leverandøren har positiv egenkapital og en soliditetsgrad på 20% i de siste to reviderte regnskapsårene. I tillegg må leverandøren dokumentere teknisk og profesjonell evne ved å gi referanser som inkluderer mottaker av leveransen, beskrivelse av leveransen, leveringssted, spesifikasjon av produktet, og om leveransen ble utført i henhold til en rammeavtale eller individuell levering.

      Qualification system
      Jun 6, 2028(100+ days)
    • Banedanmark

      Elektrisk infrastruktur og veibelysning

      Procurement of two traction transformers for Kassø substation

      Banedanmark needs two traction transformers of 23 MVA, 165/27.5 kV, designed for two-phase connection within a three-phase system, for Energinet’s 150 kV substation at Kassø in Sydjylland, Denmark. The contract, valued at a maximum of 25 million DKK over 20 months, includes the supplier's design, dimensioning, manufacture, factory testing, transport, unloading, installation, connection, site testing, and commissioning, along with associated services, documentation, spare parts, special tools, and training. The award criteria are Price (40%) and Time Schedule (60%). Qualification requirements include an average annual turnover of at least 15 million DKK over the last three financial years and the submission of up to five comparable references for the supply of traction transformers designed for two-phase connection or other power transformers designed for two-phase connection within the last ten years.

      Competition with qualification
      Nov 12, 2026(13 days)
      DKK 25,000,000
    • Netze BW GmbH

      Leistungstransformatoren 15-100 MVA

      The present qualification system serves as the prequalification for the supply of three-phase power transformers ranging from 15 MVA to 100 MVA. Companies with the capability to deliver power transformers in the above mentioned power range are invited to submit their requests for participation. This qualification system contains critical electrical data and implementation guidelines to ensure performance, safety and compatibility with our existing infrastructure.

      Qualification system
      Nov 7, 2027(100+ days)