Find

  • All tenders
All tenders: Ireland/Medite Europe DAC/Tender for the Design, Supply and Installation of a Water Treatment System at Medite Europe DAC ‘26

Tender for the Design, Supply and Installation of a Water Treatment System at Medite Europe DAC ‘26

Expired

The competition has expired without a winner being announced.

Deadline
Feb 10,Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€450Kover 1 month

Brief

Medite Europe DAC needs a water treatment system designed, supplied, and installed at their MDF facility in Ireland, with a maximum total value of 450,000 EUR. The project duration is 1 month. The system must deliver 30m3/hr of water for a new energy plant and steam generator, and 15m3/hr for an existing energy plant, meeting specified water quality. It should be modular, fully automated with local and remote SCADA, and incorporate existing multi-media filters and pumps. The scope includes compliance with EU Machinery Directives, HAZOP recommendations, and provision of safety file information. The supplier must also provide details on annual operational running costs, a recommended spare parts package, and a 5-year after-sales service package including planned preventative maintenance, chemical and salt supply, regular testing, reporting, and training. The supplier is expected to advise Medite on suitable equipment/systems and provide option pricing for any unfulfilled requirements.

Kjemikalier og vannbehandling

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Medite Europe DAC

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • MEDITE Europe DAC has plans to modernize their MDF facility with an investment in new plan and equipment collectively called Project Shine. Project Shine involves the installation of the following: • Wet fuel handling system. • Dry Fuel handling system. • 56MW Biomass Energy. • MDF dryers. • Services + utilities to the above, mainly: o Compressed air o Water treatment systems o Fire detection + suppression o Natural Gas o Steam o Storm and foul water o Bunds where necessary Project Shine is shortly commencing the construction phase of the project and proposals are sought for the supply of Water Treatment System to supply process water at the correct specification to all consumers. Current Setup MEDITE’S current water distribution process flow diagram can be seen in Appendix 3. Water is drawn from the adjacent Anner River into the onsite settling ponds. These ponds serve both as site fire water and process water requirements. This water is then fed through a 7 cartridge 50-micron filter media. From the filter bank it passes through two parallel plate heat exchangers and then fed to various processes one of these being a water tank. From the water storage tank it is then pumped through a typical De-Alk and softener process and then feeds the existing Line 1 boilers and Line 2 energy plant. Scope of work The condition and age of the existing system presents challenges for future requirements in relation to Project Shine. The main areas of concern with the current system are: • Valve and pneumatic manifold obsolescence. • Instrumentation and automation obsolescence. • Maintainability. The scope of work for the water treatment system are as follows (relevant information can be found in Appendix 3): • Design + installation of a water treatment system to: • Deliver 30m3/hr of water, to the required specification, for the new energy plant + steam generator. • Deliver 15m3/hr of water, to the required specification, for the existing energy plant. • Be modular in design with capability of addition capacity. • Fully automated with local and remote-control functionality. • Remote + local SCADA ability. • Design to incorporate existing multi media filter and associated pumps. • Proposed location of skid unit shown in appendices. • Design + installation complies with the EU Machinery Directives. • Ensure if any HAZOP recommendations are identified are implemented. • Provide all necessary Safety File information to the PSDP. • Comply with the PSCS. • Ensure all contractors conform to Medite Policies where applicable i.e. no smoking, LOTO, Hot Works, Work at Heights. • Provide details of annual operational running cost in terms of; • Chemical usage if any. • Salt usage if any. • Typical wastewater quantities + constituents from backwash. • Typical energy costs. • Compressed air consumption. • Recommended Spare Parts Package. • 5 year After Sales Service Package to include: • Planned Preventative Maintenance Program. • Chemical supply, storage and offloading. • Salt supply if required. • Regular testing + adjusting to ensure required water quality + quantity is maintained. • Necessary reports. • Training. Medite have attempted to interpret the system requirements. Since the Supplier is an expert in the field of water treatment, the Supplier is asked to advise Medite of suitable equipment/systems and its requirements that are not fulfilled and to provide an option price for same. ** Please see the attached Tender Document for the full and complete scope of works and drawings **

  • Contact

    John.Browne@mdfosb.com
  • Type
    Competition
  • Location
    South-East
  • Main code
    Water-treatment plant construction work
    45252120
  • 39370000Water installations44161200Water mains45220000Engineering works and construction works45232151Water-main refurbishment construction work45232430Water-treatment work45252127Wastewater treatment plant construction work71300000Engineering services71340000Integrated engineering services

Similar active competitions

  • Water Services Corporation

    Kjemikalier og vannbehandling

    WSC/T/092/2026 - WORKS - DESIGN, BUILD, TEST AND COMMISSION AN UPGRADE OF THE GOZO WASTEWATER TREATMENT PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION

    Water Services Corporation needs the design, construction, testing and commissioning of an environmentally friendly upgrade to the Gozo Wastewater Treatment Plant, with a maximum total contract value of €25,795,000. The works will provide process and hydraulic resilience and ensure effective treatment of wastewater through at least 2040, upgrading capacity to treat an average of 14,000 cubic metres per day. The contract also includes designing, installing, testing and commissioning a new water reclamation plant to produce an additional 4,000 cubic metres of “New Water” per day. The project will be delivered in two phases under FIDIC conditions in Malta.

    Competition
    Feb 26, 2027(92 days)
    €25,795,000
  • CHU de Martinique

    Anleggsmaskiner og utstyr

    La fourniture, la livraison, l'installation, la mise en service, la qualification, la formation et la maintenance d'un système de traitement d'eau destiné au laboratoire de biologie médicale du CHU de Martinique

    Le CHU de Martinique souhaite acquérir un système de traitement d’eau pour son laboratoire de biologie médicale, dans le cadre d’un accord-cadre de 4 ans d’une valeur maximale totale de 205 000 euros. La prestation comprend la fourniture et la livraison du système produisant de l’eau pure de type 2 et de l’eau ultrapure de type 1, ainsi que son installation, sa mise en service, sa qualification, la formation des utilisateurs et sa maintenance en Martinique.

    Framework agreement
    Dec 29, 2026(33 days)
    €205,000
  • Lereti Spa

    Anleggsmaskiner og utstyr

    Fornitura di filtri a colonna con relativa posa ed attività necessarie per interventi di rinnovamento e ricondizionamento impianti di trattamento acque ad utilizzo idropotabile

    Lereti Spa intende affidare una fornitura del valore massimo complessivo di 1,12 milioni di euro per filtri a colonna, inclusa la posa e le attività necessarie al rinnovamento e al ricondizionamento degli impianti di trattamento delle acque destinate al consumo umano. Gli interventi si svolgeranno a Varese; la valutazione prevede il criterio del prezzo e la documentazione di riferimento per forniture analoghe è indicata negli atti di gara.

    Competition
    Nov 30, 2026(4 days)
    €1,120,000