Tender for the Tunnel Electrical and Mechanical contract for the Fehmarnbelt Fixed Link
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- May 29, 2022Expired
- Award
- Execution and logistics 15% and 2 more
Brief
The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 19 km distance across the Fehmarnbelt (*transportation infrastructure) between Rødbyhavn on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. The Tunnel Electrical and Mechanical ('TEM') contract covers the mechanical, electrical, instrumentation, control and automation (MEICA) systems for the tunnel. The purpose of the MEICA systems is to enable Femern A/S to efficiently control the operation, maintenance, safety and security of the tunnel through an integrated set of systems. Femern A/S requires MEICA systems that deliver a high level of reliability, availability, maintainability and safety.
Elektrisk infrastruktur og veibelysning
Result
- COBRA INSTALACIONES Y SERVICIOS S.A.Winner
- MONCOBRA S.A.Winner
- SICE Tecnología Y Sistemas S.A.Winner
- Sociedad Ibérica de Construccines Eléctricas S.A.Winner
- 3Number of bids
- €750,000,000Contract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Price
Source
No source found in the documents. Check the weight against the tender documents.
Description
Execution and logistics
Source
No source found in the documents. Check the weight against the tender documents.
Description
Key Persons and organization
Source
No source found in the documents. Check the weight against the tender documents.
Description
Technology
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Femern Bælt A/S
From the notice
The Fehmarnbelt Fixed Link Project is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriageways and a twin-track railway traversing the 19 km distance across the Fehmarnbelt (*transportation infrastructure) between Rødbyhavn on the island of Lolland in Denmark and Puttgarden on the island of Fehmarn in northern Germany. The Tunnel Electrical and Mechanical ('TEM') contract covers the mechanical, electrical, instrumentation, control and automation (MEICA) systems for the tunnel. The purpose of the MEICA systems is to enable Femern A/S to efficiently control the operation, maintenance, safety and security of the tunnel through an integrated set of systems. Femern A/S requires MEICA systems that deliver a high level of reliability, availability, maintainability and safety.
Contact
Jonathan Jacobsoninfo@femern.dk- Result · PrequalificationType
- 45310000Main codeElectrical installation work
- 31682210Instrumentation and control equipment31682510Emergency power systems34993100Tunnel lighting34996000Control, safety or signalling equipment for roads35110000Firefighting, rescue and safety equipment35111500Fire suppression system35113300Safety installations42500000Cooling and ventilation equipment42520000Ventilation equipment42961200Scada or equivalent system45223100Assembly of metal structures45233292Installation of safety equipment45311000Electrical wiring and fitting work45312300Antenna installation work45315300Electricity supply installations45331200Ventilation and air-conditioning installation work45350000Mechanical installations48000000Software package and information systems50000000Repair and maintenance services71541000Construction project management services