Search

  • Search


    TenneT Qualification System for Protection and Control Systems

    TenneT TSO GmbH

    TenneT Qualification System for Protection and Control Systems

    1. Competition notice published

      May 13, 9:49 AMMay 13, 2026 9:49 AM
    2. Change in competition

      Jun 3, 11:45 AMJune 3, 2026 11:45 AM
    3. Tender submission deadline

      Jun 3, 1:45 PMJune 3, 2026 1:45 PM

    Brief

    Tender search/TenneT TSO GmbH/TenneT Qualification System for Protection and Control Systems
    Brief

    Elektrisk utstyr og belysning

    TenneT TSO GmbH, based in Germany, is establishing a qualification system for the supply of Intelligent Electronic Devices (IEDs) used in protection and substation control technology within extra high-voltage and high-voltage substations. These devices are critical for the safe, reliable, and efficient operation of the transmission grid, and must adhere to internationally recognized substation communication protocols, primarily IEC 61850, with consideration for IEC 60870 5 103 and IEC 60870 5 104 where applicable. The qualification process seeks Economic Operators with proven expertise in the planning, production, implementation, and integration of such devices according to technical and regulatory requirements.

    About the bid

      TenneT TSO GmbH (hereinafter referred as TenneT) is the largest Transmission System Operator (TSO) in Germany (based on circuit length, installed capacity and size of operating zone as of 31 Decem-ber 2025). The company operates critical infrastructure that secures access to a reliable, sustainable and affordable electricity supply. TenneT is one of the largest investors in electricity grids on land and at sea in Germany. Located at the Northwest European energy crossroads, TenneT connects: North and South. Offshore and Onshore. Germany and Europe. With its approximately 5,000 employees the company builds, maintains and operates Germany's largest transmission grid with a length over 14,000 km connect-ing more than a third of the European Union’s total offshore wind capacity. Its growth is driven by a rapidly evolving electricity demand that requires a flexible and growing grid architecture. The scope of this prequalification procedure covers the supply of Intelligent Electronic Devices (IEDs) used in the areas of protection and substation control technology within extra high-voltage and high-voltage substations. These devices constitute key components of the secondary technology and are essential for ensuring the safe, reliable and efficient operation of the transmission grid. The technical requirements are based on internationally recognized substation communication protocols commonly applied in the automation and operation of electrical power systems. The primary focus of the TQS is on IEC 61850, while other relevant protocols, such as IEC 60870 5 103 and IEC 60870 5 104, are also considered where applicable. This prequalification process aims to identify Economic Operators with proven expertise in the planning, production, implementation and integration of such devices in accordance with applicable technical and regulatory requirements. Candidates receive qualification status for each of their own production sites and each technical lot. The successful completion of the qualification process depends on various factors beyond TenneT’s control. TenneT can only commit to the processing time for the individual gates. The time required to complete the questionnaires and provide the necessary documentation is the sole responsibility of the participating Economic Operators.

      Contact name
      Daniel Simon
      Contact phone
      +49921507406421
      Contact email
      daniel.Simon@tennet.eu
      Address
      Bernecker Straße 70, 95448 Bayreuth

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    TenneT TSO GmbH
    Title
    TenneT Qualification System for Protection and Control Systems
    Type
    Competition
    Main code
    31210000Electrical apparatus for switching or protecting electrical circuits
    Supplemental codes
    31682540Substation equipment48921000Automation system

    Active similar competitions

    • TenneT TSO GmbH

      Elektrisk utstyr og belysning

      TenneT Qualification System for Protection and Control Systems

      TenneT TSO GmbH, based in Germany, is establishing a qualification system for the supply of Intelligent Electronic Devices (IEDs) for protection and substation control technology within extra high-voltage and high-voltage substations. These devices are critical for the safe, reliable, and efficient operation of the transmission grid, and the technical requirements are based on internationally recognized substation communication protocols, primarily IEC 61850, with consideration for IEC 60870-5-103 and IEC 60870-5-104. The qualification process seeks Economic Operators with proven expertise in the planning, production, implementation, and integration of such devices according to applicable technical and regulatory requirements.

      Qualification systemJun 9, 2026
      Jul 7, 2029(100+ days)
    • TenneT TSO GmbH

      TenneT Qualification System (TQS) Gas-insulated switchgear (GIS)

      This qualification system is being introduced in order to be able to tender for several (project or framework) agreements for gas-insulated metal-enclosed switchgear (GIS) for 145 kV and 420 KV for TenneT TSO GmbH in Germany over the next few years. TenneT values the confidentiality of all provided information and documents in this qualification system. For this matter TenneT requires from a Candidate a signed version of the attached NDA. The Candidate is requested to forward the signed version to the contact person of TenneT as stated in the most recent TED-Notice: dennis.halbauer@tennet.eu

      Qualification systemJun 27, 2025
      Jul 25, 2028(100+ days)
    • TenneT TSO B.V.

      Elektrisk infrastruktur og veibelysning

      Qualification System EU-403 Substations

      TenneT TSO B.V. needs multidisciplinary work relating to new and existing substations of 110 kV and above. This qualification system aims to compile a list of suitable contractors for carrying out these works.

      Qualification systemJul 16, 2026
      Aug 13, 2029(100+ days)
    • TenneT TSO GmbH

      TenneT Qualification System (TQS) Reactive Power Systems (former Negometrix 159654)

      This qualification system is introduced to be able to tender for several (framework) agreements in the next years for both organizations TenneT TSO B.V. in The Netherlands and/or TenneT TSO GmbH in Germany. This qualification system is the replacement of former Negometrix TQS (159654). This replacement is necessary due to the mandatory switch-over former Negometrix to Mercell. TenneT values the confidentiality of all provided information and documents in this qualification system. For this matter TenneT requires from a candidate a signed version of the attached NDA. Candidate is requested to forward the signed version to the contactperson of TenneT as stated in the most recent TED-Notice:  markus.vogel@tennet.eu rogier.wessels@tennet.eu  For more details see the manual in the survey.

      Qualification systemFeb 16, 2024
      Mar 16, 2027(100+ days)
    • TenneT TSO B.V.

      Elektrisk utstyr og belysning

      EU-490 TenneT Qualification System (TQS) Gas-Insulated Switchgear (GIS) and Gas-Insulated Line (GIL) - NL

      TenneT TSO B.V. needs Gas-Insulated Switchgear (GIS) and Gas-Insulated Line (GIL) for 72.5 kV, 145 kV, 170 kV, 245 kV, and 420 kV in the Netherlands. This is a qualification system for future tenders for project and/or framework agreements. Suppliers must sign a Non-Disclosure Agreement (NDA) to access the TenneT Qualification System.

      Qualification systemJul 10, 2026
      Aug 7, 2029(100+ days)