The Establishment of TUS Multi-Operator Framework Agreements for Electrical Works Contractors
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Jun 2,Expired
- Procedure
- With prequalificationTwo stages
Brief
Technological University of the Shannon: Midlands Midwest (TUSMM) has entered into a multi-operator framework agreement with HandF Electrical Contractors Ltd., Tim Kelly Group, Kenneth Keane Electrical Ltd, Sensori Facilities Management Limited, John Fletcher Ltd, Tiernan Engineering Ltd., and King and Moffatt Group for the delivery of electrical works contractors in TUS Midlands and TUS Midwest, Ireland. The agreement has a duration of 4 years and a maximum total value of 12 million EUR. The services are divided into two lots, each with an estimated value between 200,000 EUR and 2 million EUR. Technical capability criteria, including qualifications of managerial and personnel, a list of previous works carried out, average annual number of persons employed, and health and safety, were required. 11 bids were received.
Elektrisk infrastruktur og veibelysning
Result
- HandF Electrical Contractors Ltd.Winner
- John Fletcher LtdWinner
- Kenneth Keane Electrical LtdWinner
- King and Moffatt GroupWinner
- Sensori Facilities Management LimitedWinner
- 11Number of bids
- Not statedContract value
- Maximum framework agreement valueUp to €12,000,000
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Qualifications Managerial and Personnel, List of previous works carried out, Average Annual Number of persons employed, Health and Safety.
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Technological University of the Shannon: Midlands Midwest (TUSMM)
From the notice
TUS is seeking to establish two Multi-Operator Framework Agreements (MOFAs) with suitable electrical works contractors. The procurement process is structured in two Lots. Each Lot is a standalone competition where up to 6 single applicants will be selected and appointed. The purpose of these multi-operator framework agreements is to establish a structured and efficient mechanism through which TUS can procure and deliver a range of General electrical Works projects/ contracts over a four-year period from the commencement date of each framework. Lot 1 - Multi Operator Framework Agreements of Electrical Works Contractors for Electrical Works in TUS Midlands €200,000 – €2 million. Lot 2 - Multi Operator Framework Agreements of Electrical Works Contractors for Electrical Works in TUS Midwest €200,000 – €2 million.
Contact
barry.coleman@tus.ie- Result · Framework agreement · PrequalificationType
- Mid-WestLocation
- 45310000Main codeElectrical installation work
- 44111530Electrical insulating fittings45311000Electrical wiring and fitting work45311200Electrical fitting work45315000Electrical installation work of heating and other electrical building-equipment45315100Electrical engineering installation works45317000Other electrical installation work45317100Electrical installation work of pumping equipment45317200Electrical installation work of transformers45317300Electrical installation work of electrical distribution apparatus45317400Electrical installation work of filtration equipment50710000Repair and maintenance services of electrical and mechanical building installations65320000Operation of electrical installations