The MaresConnect 750MW HVDC Interconnector System
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Oct 31,Expired
- Award
- Økonomisk mest fordelaktige tilbud
Brief
MaresConnect Limited (MCL) needs engineering, procurement, and construction (EPC) services for two HVDC Converter Stations as part of the MaresConnect 750MW HVDC Interconnector System, linking Denbighshire, Wales, and North County Dublin, Ireland. The project involves a 750 MW, 320 kV High Voltage Direct Current (HVDC) electricity interconnector, utilizing Voltage Source Converter (VSC) technology with a symmetrical monopole configuration and a rated DC voltage of +/-320 kV. The link will be bi-directional and have a rated power of 750 MW. The contract model will be amended FIDIC Conditions of Contract for EPC/Turnkey Projects (Silver Book). The maximum total contract value for this lot is 1,000,000,000 EUR. The award criteria will be based on the most economically advantageous tender, considering criteria stated in the procurement documents.
Grunnarbeid og utleie av anleggsmaskiner
Previous winners
Who are you up against?
The suppliers who have won similar contracts at MaresConnect Limited (MCL)
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
Pris er ikke det eneste tildelingskriteriet, og alle kriterier er angitt i anskaffelsesdokumentene.
Source
No source found in the documents. Check the weight against the tender documents.
Description
Det økonomisk mest fordelaktige tilbudet i henhold til kriteriene angitt i spesifikasjonene, i invitasjonen til å levere tilbud eller forhandle, eller i det beskrivende dokumentet.
Source
No source found in the documents. Check the weight against the tender documents.
From the notice
The MaresConnect Project is a proposed 750 MW, 320 kV High Voltage Direct Current (HVDC) electricity interconnector linking Denbighshire, Wales and North County Dublin, Ireland. Developed by MaresConnect Limited, a joint venture between Foresight Group Holdings Ltd and Etchea Energy Nominees Ltd, the project will transmit electricity via approximately 240 km of subsea and underground cables between new converter stations on each side. It aims to enhance security of supply, market integration, and renewable energy utilisation between the Irish and GB grids. MaresConnect shall utilise Voltage Source Converter (VSC) technology and the configuration shall be a Symmetrical Monopole. The rated DC voltage shall be +/-320 kV. The link shall be bi-directional and shall have a rated power (receiving end) of 750 MW. The project is being procured as separate EPC (Turnkey) contracts, divided into four lots: LOT 1A: EPC for two HVDC Converter Stations; LOT 1B: EPC for one Irish 400kV AC Tail Substation; LOT 2A: EPC for the HVDC subsea and underground cable system, and for the HVAC underground cable system in Wales (Bodelwyddan); LOT 2B: EPC for the supply and installation of HVAC cable system in Ireland (Dublin). The contract model for the lots will be amended FIDIC Conditions of Contract for EPC/Turnkey Projects (Silver Book). MaresConnect has conducted Preliminary Market Engagement prior to publication of this Contract Notice and encourages further collaboration between OEMs and Construction Contractors to establish bidding arrangements in time for the next step of the Procurement Process (notably the Pre-Qualification Questionnaire).
Contact
Joseph Moneleyprocurement@maresconnect.ie- Competition · PrequalificationType
- DublinLocation
- 45231400Main codeConstruction work for electricity power lines
- 31170000Transformers31214000Switchgear31320000Power distribution cables31682540Substation equipment45232220Substation construction work45232221Transformer substation45251110Nuclear-power station construction work45314310Installation of cable laying