TII400 Luas Operations and Maintenance Contract
Awarded
The competition has ended and a winner has been selected.
- Procedure
- With negotiationTwo stages
- Agreement
- Buying services
- Estimated value
- €1.8Bover 14 years
Brief
Transport Infrastructure Ireland (TII) has entered into an agreement with Keolis (UK) Limited for the Luas Operations and Maintenance Contract. This contract involves the delivery of services for Dublin's light rail system, Luas, which includes the operation of public passenger services, rolling stock maintenance, infrastructure maintenance (depots, track, etc.), management and operation of Luas Park and Ride sites, and maintenance of the automatic fare collection system. The services will be delivered in Dublin, Ireland. The contract is anticipated to commence operations in Q2 or Q3 2026 for a period of seven years, with an option to extend by up to a further five to seven years, making the total potential duration 14 years. The final contract value is 718,979,302 EUR. Three bids were received for this contract.
Togtjenester og togdrift
Result
- Keolis (UK) LimitedWinner
- 3Number of bids
- €718,979,302Contract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
Se IMPQQ for kvalifikasjonskrav
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Kvalifikasjonskriterier basert på økonomisk operatørs tekniske og kvalifikasjonsmessige kapasitet.
Source
No source found in the documents. Check the requirement against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Transport Infrastructure Ireland (TII)
From the notice
National Transport Authority and Transport Infrastructure Ireland Luas is Dublin's light rail system and consists of two separate lines, the Red Line and the Green Line. The system comprises 42.5 kilometers of track, three maintenance depots, 67 stops and a fleet of 81 light rail vehicles. Luas carried 48.2 million passenger journeys in 2023. Further expansion of the system is anticipated. A more detailed description of the Luas system is given in Appendix A of the IMPQQ Document. It is anticipated that the Luas Operations and Maintenance Contract will commence operations in Quarter 2 or 3, 2026 for a period of seven years from full operational commencement, with an option to extend by up to a further five to seven years. There will be a mobilisation/transition period from the date of contract signing until the operating commencement date. The scope of the Luas Operations and Maintenance Contract will include operation of public passenger services, rolling stock maintenance, infrastructure maintenance (depots, track, etc.) and management and operation of Luas Park and Ride sites. Maintenance of the automatic fare collection system (AFCS) will also be within the scope of the Operations and Maintenance Contract. It is envisaged that revenue risk will be borne by NTA/TII but that some fare evasion risk will be borne by the Operator. The passenger services to be provided by the Operator will be defined by a service specification. There will be a performance monitoring system in place based on a number of key performance indicators. A more detailed description of the scope of the Luas Operations and Maintenance Contract is given in Appendices B, C, D and E of the IMPQQ Document.
Contact
Paul.Farrelly@tii.ie- Result · PrequalificationType
- DublinLocation
- 60200000Main codeRailway transport services
- 34621000Railway maintenance or service vehicles, and railway freight wagons34631000Parts of locomotives or rolling stock50220000Repair, maintenance and associated services related to railways and other equipment50324100System maintenance services60210000Public transport services by railways