Ireland: Tenders/Transport Infrastructure Ireland (TII)/TII424: OCS Works Framework Agreement
  1. Competition notice published

    Aug 27, 2024 2:28 PMAugust 27, 2024 2:28 PM
  2. Change in competition

    Sep 13, 2024 12:09 PMSeptember 13, 2024 12:09 PM
  3. Contract start date

    Jul 23, 12:00 AMJuly 23, 2026 12:00 AM
  4. Supplier selection

    Jul 23, 12:00 AMJuly 23, 2026 12:00 AM
  5. Contract signed

    Jul 23, 12:00 AMJuly 23, 2026 12:00 AM
  6. Result notice published

    Aug 24, 2:13 PMAugust 24, 2026 2:13 PM
  7. Contract end date

    Jul 22, 2030 12:00 AMJuly 22, 2030 12:00 AM

Brief

TII424: OCS Works Framework Agreement

Awarded

The competition has ended and a winner has been selected.

Procedure
With prequalificationTwo stages
Agreement
Framework agreement
Estimated value
€90Muntil Jul 2030

Brief

Transport Infrastructure Ireland (TII) has entered into a framework agreement with Amey Rail Limited for the delivery of Overhead Contact System (OCS) renewals on the Luas light rail system in Dublin. The services include design, supply, installation, testing, and commissioning of OCS asset renewals, upgrades, or new works, including developing detailed construction designs, work programmes, methodologies, and traffic management designs. The contract also covers the supply of materials such as contact wire and overhead system components, and carrying out duties of PSDP and PSCS for all Call-Off Contracts. The maximum total estimated value of the contract is 90,000,000 EUR. Three bids were received for this contract.

Grunnarbeid og anleggsvirksomhet

Result

TED
  • Amey Rail Limited
    Winner
  • Number of bids
    3
  • Contract value
    Not stated
  • Maximum framework agreement valueUp to €90,000,000

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Transport Infrastructure Ireland (TII)

From the notice

  • TII intends to enter into a Single Party Framework Agreement for renewals (Overhead Contact System) on the Luas light rail system. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis. The Call-Off Contracts, when issued, will typically be for the purposes of carrying out the following activities:1. Design, supply, installation, testing and commissioning of any Overhead Contact System asset renewals, upgrades or new works. It shall include developing a detailed construction design associated with the various work elements of the Overhead Contact System installations on Luas 2. Developing the specific programme of works, 3. Developing the specific methodology – location based, 4. Developing the Traffic Management design – to be approved by the relevant Local Authority, TII and the Luas Operator, 5. Interface with Luas Operator and Maintainer as required, 6. Carrying out all the necessary works as specified for the Overhead Contact System and/or associated equipment and installations on Luas. Those works will include all preparatory works and all closing out works to make good the affected assets, 7. Production of the Safety File, 8. Supply of materials including contact wire and overhead system components and tooling e.g. Section insulators, cabling, fixings, poles, track interfacing equipment, sealants/grouts and materials used for works on or near the Luas system, and 9. Any other associated works required by the Client; including work on overhead contact system and traction power related equipment such as overhead contact system elements, cabling including traction cables, earthing and bonding systems (e.g. VLDs etc), installation, purchase, interventions of similar equipment, work on on-track-plant, supply of and interventions on tooling, interventions on overhead contact systems such as replacing contact wire, adjusting overhead support systems, work on supporting systems and additional items on surrounding building such as poles and building supports and all works on or near Luas OHLE (Overhead line equipment) asset group, 10. Provide a handover file and as-built drawings in accordance with TII requirements . 11. Carrying out the duties of PSDP and PSCS for all Call off Contracts. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Pre-qualification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarations made in the response to the ESPD/IMPQQ.

  • Contact

    Paul.Farrelly@tii.ie
  • Type
    Result · Framework agreement · Prequalification
  • Location
    Dublin
  • Main code
    Railway construction works
    45234100
  • 45234127Tramway depot construction work45234128Tramway platforms construction work45234129Urban railway track construction works

Similar active competitions

  • Transport Infrastructure Ireland (TII)

    Grunnarbeid og anleggsvirksomhet

    TII499 Luas Finglas Main Infrastructure Design and Construction Works

    Transport Infrastructure Ireland (TII) needs a contractor to design and build the Luas Finglas main infrastructure works in Dublin under a 54-month NEC4 Engineering and Construction Contract, Option C, with a maximum total value of €250 million. The project will extend the Luas Green Line by 4 km, including four new stops, track and rail systems, a 350-space Park and Ride facility, bridges, stabling works, utility diversions, road and junction changes, walking and cycling facilities, and upgrades to the urban realm. The contractor will also manage systems integration, coordinate with other work packages and stakeholders, and carry out testing and commissioning. Works include delivery in live traffic conditions on busy Dublin radial routes.

    Competition with qualification
    Dec 14, 2026(37 days)
    €250,000,000
  • Transport Infrastructure Ireland (TII)

    Eiendomsmegling

    Real Estate Consultancy Services Frameworks for Public Transport, Roads, Greenways and Active Travel Projects

    Transport Infrastructure Ireland (TII) seeks to establish four-year, multi-supplier real estate consultancy services frameworks, with a maximum combined value of €27.75 million. Lot 1, estimated at €12.5 million–€15.75 million, covers public transport and corporate property needs, including acquisition, leasing, valuation, compensation, compulsory purchase support, negotiations, estate management, development, facilities management and expert advice; the framework will also be available to the statutory body delivering MetroLink. Lot 2, estimated at €9.1 million–€12 million, supports roads, greenways and active-travel projects nationwide for TII and local authorities, covering land valuation and acquisition, compensation, agricultural advice, rights of way, stakeholder negotiations, cost and risk assessment, claims management, arbitration, mapping and land-transfer reporting. Services are required across Ireland, with Dublin listed as the project location.

    Framework agreement
    Dec 7, 2026(30 days)
    €27,750,000
  • Dublin City Council

    Anleggs- og infrastrukturbygging

    DCC - Multi-Party Framework Agreement for carrying out Roadworks in a City and Suburban Environment for Contracts greater than €1.0m and less than €8.0m

    Dublin City Council needs roadworks, public realm improvement works, cycle track works, and other engineering works in a live city and sub-urban environment in Dublin, Ireland, through a multi-party framework agreement over 4 years, with a maximum total value of 150,000,000 EUR. The contracts under the framework will be for values greater than 1,000,000 EUR and less than 8,000,000 EUR.

    Framework agreement with qualification
    Nov 25, 2026(18 days)
    €150,000,000