TII501 - Luas Class 402 Mid Life Refresh

Planned

The competition has not been announced yet.

Deadline
Mar 2,Expired
Agreement
Buying services
Estimated value
€0

Brief

Transport Infrastructure Ireland (TII) is planning the procurement of services for the mid-life refresh of 26 Luas Class 402 trams, which involves minor corrosion repair, interior improvements, exterior lighting upgrades, component replacement, and exterior bodywork. Suppliers are invited to participate in a pre-tender market consultation exercise to provide feedback and help inform the proposed procurement and contracting strategy.

Flyvedlikehold og flytjenester

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Transport Infrastructure Ireland (TII)

From the notice

  • This Prior Information Notice (PIN) is to advise prospective suppliers of the upcoming market engagement for the possible mid-life refresh of 26 trams owned by Transport Infrastructure Ireland and to invite them to participate in a pre-tender market consultation exercise. The aim of the exercise is to provide early information and gain feedback to help inform the proposed procurement and contracting strategy. Transport Infrastructure Ireland, herein referred to as TII, is the owner of the Luas tram system. Luas operates over two main lines: The Green Line, which began operating on 30th June 2004, and now serves a 24.5 kilometre route from Broombridge via Sandyford to Bride's Glen. The Red Line, which opened on 26th September 2004, and now operates from The Point or Connolly, to Saggart or Tallaght, each route is approximately 20.7 kilometres long. The Green Line has seen several extensions since its original opening in 2004, from the original service from Sandyford to St Stephen's Green, to the Green Line route of today, which opened in 2017. The system operates on a 750V DC overhead power supply and uses the international standard track gauge of 1,435mm. The Green Line is served by 26 Citadis 402 trams, which entered service in 2009, seven Citadis 502 variants, which were procured for use on the St. Stephen's Green to Broombridge line, entering service in 2018, and eight further 502 units, which entered service in 2020. Between 2019 and 2021, all 26 Citadis 402 trams were lengthened to match the Citadis 502 formation, resulting in a tram length of 55 metres. Each tram comprises 9 cars and 5 bogies. The trams are low floor throughout. Owing to the strong reliability performance of these vehicles, TII intends to operate the fleet until at least 2040. To support this objective, and to ensure a consistent and high-quality customer experience across the network, TII intends to commission a mid-life refresh of 26 Citadis 402 vehicles to address wear and tear and adopt minor equipment upgrades. TII anticipates that development and validation (1 x LRV for process development and 1 x LRV for process validation) work will be undertaken at a suitable facility away from Luas, due to lack of suitable space in Luas facilities. The work on the remainder of the fleet can then be undertaken at a Luas owned facility where space will have become available, unless the supplier can demonstrate value to TII in continuing the works at the supplier’s facility. The mid-life refresh works will comprise: Minor Corrosion Repair: This is mostly around the headstocks, gangways and jacking points, with the expected scope of work to include removal of corrosion, anti-corrosion treatment, and recoating rather than heavy material replacement. Interior Improvements: Including the replacement or repair of grab poles and grab rails, upholstery, floor covering, and some interior painting. Exterior Lighting Upgrade: New headlights and fog lights and replacement of the associated wiring. Component Replacement: Including gangway bearings, roof fairing mudflap brackets, air-conditioning ducts, and bellows. Exterior Bodywork: Exterior repainting to remove scuffs and damage below the window line. In relation to the estimated value, TII will use this market engagement to ascertain the potential value of the services.

  • Contact

    Paul FarrellyPaul.Farrelly@tii.ie
  • Type
    Planning
  • Location
    Dublin
  • Main code
    Repair and maintenance services of rolling stock
    50222000
  • 34200000Vehicle bodies, trailers or semi-trailers50113000Repair and maintenance services of buses50114000Repair and maintenance services of trucks50224000Reconditioning services of rolling stock

Similar active competitions

  • Transport Infrastructure Ireland (TII)

    Grunnarbeid og anleggsvirksomhet

    TII499 Luas Finglas Main Infrastructure Design and Construction Works

    Transport Infrastructure Ireland (TII) needs a contractor to design and build the Luas Finglas main infrastructure works in Dublin under a 54-month NEC4 Engineering and Construction Contract, Option C, with a maximum total value of €250 million. The project will extend the Luas Green Line by 4 km, including four new stops, track and rail systems, a 350-space Park and Ride facility, bridges, stabling works, utility diversions, road and junction changes, walking and cycling facilities, and upgrades to the urban realm. The contractor will also manage systems integration, coordinate with other work packages and stakeholders, and carry out testing and commissioning. Works include delivery in live traffic conditions on busy Dublin radial routes.

    Competition with qualification
    Dec 14, 2026(37 days)
    €250,000,000
  • Transport Infrastructure Ireland (TII)

    Bedriftsrådgivning

    Market Engagement for Dispute Avoidance Board (DAB) services for MetroLink Dublin

    Transport Infrastructure Ireland (TII) is planning the procurement of Dispute Avoidance Board (DAB) services for the MetroLink Dublin programme, primarily to manage disputes referred to it by the parties of the contracts during the MetroLink project. TII seeks to engage with experienced DAB Board specialists to explore market capacity and capability, particularly for the Irish market, and suppliers can give feedback by participating in early market engagement. The estimated maximum total contract value is 5,760,000 EUR.

    Planning€5,760,000
  • Dublin Bus / Bus Atha Cliath

    Bil- og motorvognstjenester

    SG Refurb 2027

    Dublin Bus / Bus Átha Cliath needs fleet refurbishment services under a 12-month framework agreement, with a maximum total value of €1.6 million. The work covers refurbishment of vehicle components including engine-bay hoses, suspension, steering, brakes, road wheels, interior and exterior finishes, and some glass elements, with services delivered in Dublin. IRISH COMMERCIALS_5556 holds the previous SG Refurb contract.

    Framework agreement
    Dec 4, 2026(27 days)