Find

  • All tenders
Ireland: Tenders/Transport Infrastructure Ireland (TII)/TII522 Electrical Renewals Luas Works (Low Voltage) IMPQQ

TII522 Electrical Renewals Luas Works (Low Voltage) IMPQQ

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Oct 5,Expired
Procedure
With prequalificationTwo stages
Agreement
Framework agreement
Estimated value
€30Mover 7 years

Brief

Transport Infrastructure Ireland (TII) needs electrical renewals and upgrade works (Low Voltage) for the Luas Light Rail System in Dublin, through a multi-party framework agreement with a maximum total value of 30,000,000 EUR over 7 years. The works involve the design, installation, testing, commissioning, and compliance of railway electrical systems at the Low Voltage (LV) level. Applicants must demonstrate proven electrical expertise and experience in LV electrical systems for light rail or heavy rail infrastructure, a strong track record of delivering complex electrical works in live operational rail environments, and experience in the design, installation, testing, and commissioning of safety-critical electrical systems in live railway environments. Applicants must also be capable of acting as or procuring suitably competent persons to act as the Project Supervisor for the Design Process (PSDP) and the Project Supervisor for the Construction Stage (PSCS) in accordance with Irish health and safety legislation.

Elektroinstallasjon i bygninger

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Transport Infrastructure Ireland (TII)

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • TII intends to enter into Multi Party Framework Agreement for Luas Electrical Renewals and Upgrade Works (Low Voltage) for the Luas Light Rail System. This IMPQQ competition aims to identify and shortlist highly qualified electrical contractors with proven electrical expertise and experience in Low Voltage (LV) electrical systems for light rail or heavy rail infrastructure, specifically in the design, installation, testing, commissioning, and compliance of railway electrical systems at LV level. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis, (i.e. PW-CF2 or PW-CF4). The Applicant must demonstrate a strong track record of delivering complex electrical works in live operational rail environments, ensuring safety, quality, reliability, and full regulatory compliance. The Applicant must demonstrate their experience in the design, installation, testing, commissioning of safety critical electrical systems in live railway environments and compliance of various railway electrical LV systems. The IMPQQ details where TII allows subcontracting. Applicants must demonstrate their experience working in live railway environment and must be capable of acting as or procuring suitably competent persons to act as the Project Supervisor for the Design Process (PSDP) and the Project Supervisor for the Construction Stage (PSCS) in accordance with Irish health and safety legislation. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Prequalification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarations made in the response to the ESPD/IMPQQ.

  • Contact

    Paul.Farrelly@tii.ie
  • Type
    Competition · Framework agreement · Prequalification
  • Location
    Dublin
  • Main code
    Electrical engineering installation works
    45315100
  • 45310000Electrical installation work45315600Low-voltage installation work45317000Other electrical installation work

Similar active competitions

  • Transport Infrastructure Ireland (TII)

    Grunnarbeid og anleggsvirksomhet

    TII499 Luas Finglas Main Infrastructure Design and Construction Works

    Transport Infrastructure Ireland (TII) needs a contractor to design and build the Luas Finglas main infrastructure works in Dublin under a 54-month NEC4 Engineering and Construction Contract, Option C, with a maximum total value of €250 million. The project will extend the Luas Green Line by 4 km, including four new stops, track and rail systems, a 350-space Park and Ride facility, bridges, stabling works, utility diversions, road and junction changes, walking and cycling facilities, and upgrades to the urban realm. The contractor will also manage systems integration, coordinate with other work packages and stakeholders, and carry out testing and commissioning. Works include delivery in live traffic conditions on busy Dublin radial routes.

    Competition with qualification
    Dec 14, 2026(21 days)
    €250,000,000
  • Electricity Supply Board ( ESB )

    Elektrisk infrastruktur og veibelysning

    CON1199 - Qualification System for Electrical Distribution Substation Works

    Electricity Supply Board (ESB) needs expressions of interest for a Qualification System for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance, and construction services related to electrical power distribution assets, mainly within substations but also power distribution cables, ring main units, mini-pillars, and other associated assets throughout the distribution network, up to 110 kV voltage level. The works will be located in the Republic of Ireland.

    Qualification system
    Jul 2, 2029(100+ days)
  • Electricity Supply Board ( ESB )

    CON1140 Qualification System for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes

    ESB proposes to establish a qualification system under a negotiated procedure for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes. It is envisaged that a significant number of DSO and TSO GIS Substations will be constructed during the period 2026 - 2035 and will be delivered via this procurement process as outlined in Section A Information Memorandum, attached to this publication. Substations procured under this Qualification System will include for a full end to end scope of delivery which may include in some cases site acquisition and achievement of planning permission on behalf of the Contracting Entity. The scope of substation projects under this Qualification System may include a requirement for the inclusion of additional technologies including but not limited to STATCOMS and series compensators. The First Procurement under the Qualification System is envisaged to be: • Framework for PR6 Capacity at scale EPC delivery of 110 kV and/or 110 kV to /38 kV/MV Substations and Substation Programmes. Economic Operators who wish to participate in this qualification system process should submit a response as set out in the Section A Information Memorandum document. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 27th June 2025 (the “First Procurement Closing Date”).

    Qualification system
    Jun 16, 2028(100+ days)