Search

  • Search


    Transport and Installation of Offshore Substation and Foundations for Gode Wind 03 and Borkum Riffgrund 03

    Ørsted Wind Power A/S

    Transport and Installation of Offshore Substation and Foundations for Gode Wind 03 and Borkum Riffgrund 03

    1. Contract signed

      Sep 9, 12:00 AMSeptember 9, 2021 12:00 AM
    2. Result notice published

      Oct 9, 8:00 AMOctober 9, 2021 8:00 AM

    Brief

    Denmark: Tenders/Ørsted Wind Power A/S/Transport and Installation of Offshore Substation and Foundations for Gode Wind 03 and Borkum Riffgrund 03

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    The Works comprises: - Supply, transport and installation of the scour protection for the OSS position of GOW03, the 23 WTG positions of GOW03 and the 83 WTG positions of BKR03; - T&I of one (1) Offshore Substation including an OSS foundation, a Module Support Frame (MSF) and an OSS Topside for GOW03; An OSS foundation consists of a monopile (MP), anode cage (AC) and boatlanding. - T&I of 23 foundations for the wind turbine generators (WTGs) on GOW03 and 83 foundations for the WTGs on BKR03; A WTG foundation consists of a MP and secondary steel (SS), including AC.

    Result

    Winner
    Jan De Nul NV
    Number of bids
    3
    Contract value
    Not stated

    About the bid

      The Works comprises: - Supply, transport and installation of the scour protection for the OSS position of GOW03, the 23 WTG positions of GOW03 and the 83 WTG positions of BKR03; - T&I of one (1) Offshore Substation including an OSS foundation, a Module Support Frame (MSF) and an OSS Topside for GOW03; An OSS foundation consists of a monopile (MP), anode cage (AC) and boatlanding. - T&I of 23 foundations for the wind turbine generators (WTGs) on GOW03 and 83 foundations for the WTGs on BKR03; A WTG foundation consists of a MP and secondary steel (SS), including AC.

      Contact name
      Atli Djurholm
      Contact phone
      +45 99557971
      Contact email
      atdju@orsted.dk
      Address
      Kraftvaerksvej 53, DK-7000 Fredericia

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Ørsted Wind Power A/S
    Title
    Transport and Installation of Offshore Substation and Foundations for Gode Wind 03 and Borkum Riffgrund 03
    Type
    ResultPrequalification
    Main code
    45000000Construction work
    Supplemental codes
    45251160Wind-power installation works

    Active similar competitions

    • Trianel Windkraftwerk Borkum GmbH & Co. KG

      Subsea Inspections 2027+

      Trianel Windkraftwerk Borkum GmbH & Co. KG needs subsea inspection services for offshore foundations and scour surveys of the seabed for 3 years (2027, 2028, 2029) with an optional prolongation for an additional 2+1 years. The services involve yearly ROV inspections. Award criteria are Quality (30%) and Price (70%). Suppliers must provide references on specified services.

      Competition with qualificationSep 21, 2026
      Oct 21, 2026(11 days)
    • Bundesamt für Seeschifffahrt und Hydrographie

      Kartlegging og geospatiale tjenester

      Geophysikalische Begleitung zur Baugrundvorerkundung für Offshore-Windparks innerhalb der Zonen 4 und 5 der deutschen AWZ der Nordsee gemäß FEP“ (GeophysB 2026)

      Das Bundesamt für Seeschifffahrt und Hydrographie - Beschaffung Z12 benötigt geophysikalische Begleitdienstleistungen für die Baugrundvorerkundung von Offshore-Windparks in den Zonen 4 und 5 der deutschen AWZ der Nordsee gemäß FEP. Es handelt sich um eine Rahmenvereinbarung für Dienstleistungen mit einer Laufzeit von 4 Jahren und einem maximalen Gesamtwert von 1 EUR. Die Dienstleistungen sollen in Hamburg erbracht werden.

      Framework agreementSep 9, 2026
      Oct 20, 2026(10 days)
      €1
    • Elia Transmission Belgium

      Grunnarbeid og utleie av anleggsmaskiner

      Qualification System for Civil Works in Elia High Voltage Overhead Lines

      Elia Transmission Belgium heeft een kwalificatiesysteem opgezet voor civiele werken aan hoogspanningslijnen. Dit omvat verankerings- en funderingswerken voor ondersteunende constructies zoals betonnen masten en vakwerkmasten, zowel voor bestaande als nieuwe funderingen. De werken kunnen betrekking hebben op funderingen op basis van poeren, diepe funderingen (micropalen, boorpalen, buisschroefpalen) of andere vergelijkbare werkzaamheden.

      Qualification systemMar 16, 2026
      Apr 14, 2029(100+ days)