Search
  • Search


Belgium: Tenders/Elia Asset/Virtual Substation - System Engineering Tool
  1. Competition notice published

    Mar 15, 2024 10:00 PMMarch 15, 2024 10:00 PM
  2. Contract signed

    May 20, 2025 12:00 AMMay 20, 2025 12:00 AM
  3. Result notice published

    May 26, 2025 8:00 PMMay 26, 2025 8:00 PM
  4. Contract start date

    Jun 1, 2025 12:00 AMJune 1, 2025 12:00 AM
  5. Contract end date

    May 2, 2035 12:00 AMMay 2, 2035 12:00 AM

Brief

Virtual Substation - System Engineering Tool

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
May 26, 2025Expired
Procedure
Innovation partnershipTwo stages
Agreement
Buying services
Estimated value
€3.1Muntil May 2035

Brief

A Tender for an Innovation Partnership to develop a system engineering tool that supports the end-to-end engineering process of IEC61850 digital and virtual substations. The scope of this tender includes • development of the solution • maintenance • licensing Context: The IEC61850 digital substation initiates a significant transition for users, specifically for large utilities with a high level of standardization. This transition can be a complex exercise, as users have developed their own engineering processes to suit the needs of copper-wired systems. As a result, many current IEC 61850 engineering implementations are private developments that are device-driven and labor-intensive. To address this challenge, IEC TC57 working group WG10 has identified a series of needs to evolve to a harmonized, market-supported, user-requirement-driven top-down process. To implement these requirements, WG10 has initiated the development of two technical reports: IEC 61850-90-30 (Function Modeling in SCL) and IEC 61850-7-6 ed2.0 (Basic Application Profiles in SCL). These reports define an SCL (System Configuration Language) extension namespace called IEC 61850-6-100 and document it’s use and application through multiple examples and use cases. While Elia has already digitalized some of the interaction between devices (IEC61850 station bus), it has the ambition to move forward towards the roll-out of full digital substations, converting electrical signals at their source to a digital data and using them in a digitalized system. To engineer these systems, Elia’s current engineering process and tools are not useable. Therefore, Elia is planning to implement a top-down process supported by the IEC61850 standard and the industry. Digitalization of substation protection and control functions comes with a new way of thinking. While current technology focuses on dataflow between Intelligent Electronic Devices (IEDs) considering only the interface of the IED and seeing the content of the IED as a black box, digital substation engineering requires the modeling of the end-to-end functions of a substation system. A substation is not seen any more as a grouping of different topological blocs (bays) that are engineered one by one but is in a digital world to be considered as a system that needs to be engineered and modelled as a whole. This is why Elia, as a frontrunner in digital substation engineering, is starting an innovation partnership for the development of a System Engineering Tool, seeking to push the industry towards a standardized solution for substation engineering. This vision is supported by the industry through the “IEC61850 Engineering Process Common Vision” (weblink: https://innovation.eliagroup.eu/projects/iec61850-engineering-process-common-vision/ ) and by standardization through TR IEC 61850-90-30 and IEC 61850-7-6 ed2.0, as indicated above. Key roles of the system engineering tool are - Concept Definition Tool - System Specification Tool - System Configuration Tool - Interaction with an engineering PLM/PDM system over an API The main drivers for this project are - Supporting technological evolution of the PACS (protection, automation and control systems) for next (digital) generation and future generations (virtualization of protection and control applications) - Providing answers to important challenges of the current engineering processes - Realization of Elia’s goals on overall engineering efficiency and quality improvement Important criteria for the proposed solution are - The solution needs to become an off-the-shelf market supported solution, only configuration of tools is allowed. Elia does not want to use a separate branch of a market available solution - It needs to offer the engineering efficiency required for the achievement of Elia’s project execution goals - Creating an engineering eco-system with individual interoperable and interchangeable tools - The solution requires a user experience that is intuitive, easy to understand and to learn - The solution needs to blend in in the IT landscape, and interact in a smooth way with other tools and eco-systems for the exchange of data. Elia has the ambition to use the output of this project for multiple PACS generations to come, including the virtualization of protection and control applications.

Result

TED
  • SprintEins GmbH
    Winner
  • Number of tenders received
    20
  • Contract value
    €3,100,000

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Elia Asset

From the notice

  • A Tender for an Innovation Partnership to develop a system engineering tool that supports the end-to-end engineering process of IEC61850 digital and virtual substations. The scope of this tender includes • development of the solution • maintenance • licensing Context: The IEC61850 digital substation initiates a significant transition for users, specifically for large utilities with a high level of standardization. This transition can be a complex exercise, as users have developed their own engineering processes to suit the needs of copper-wired systems. As a result, many current IEC 61850 engineering implementations are private developments that are device-driven and labor-intensive. To address this challenge, IEC TC57 working group WG10 has identified a series of needs to evolve to a harmonized, market-supported, user-requirement-driven top-down process. To implement these requirements, WG10 has initiated the development of two technical reports: IEC 61850-90-30 (Function Modeling in SCL) and IEC 61850-7-6 ed2.0 (Basic Application Profiles in SCL). These reports define an SCL (System Configuration Language) extension namespace called IEC 61850-6-100 and document it’s use and application through multiple examples and use cases. While Elia has already digitalized some of the interaction between devices (IEC61850 station bus), it has the ambition to move forward towards the roll-out of full digital substations, converting electrical signals at their source to a digital data and using them in a digitalized system. To engineer these systems, Elia’s current engineering process and tools are not useable. Therefore, Elia is planning to implement a top-down process supported by the IEC61850 standard and the industry. Digitalization of substation protection and control functions comes with a new way of thinking. While current technology focuses on dataflow between Intelligent Electronic Devices (IEDs) considering only the interface of the IED and seeing the content of the IED as a black box, digital substation engineering requires the modeling of the end-to-end functions of a substation system. A substation is not seen any more as a grouping of different topological blocs (bays) that are engineered one by one but is in a digital world to be considered as a system that needs to be engineered and modelled as a whole. This is why Elia, as a frontrunner in digital substation engineering, is starting an innovation partnership for the development of a System Engineering Tool, seeking to push the industry towards a standardized solution for substation engineering. This vision is supported by the industry through the “IEC61850 Engineering Process Common Vision” (weblink: https://innovation.eliagroup.eu/projects/iec61850-engineering-process-common-vision/ ) and by standardization through TR IEC 61850-90-30 and IEC 61850-7-6 ed2.0, as indicated above. Key roles of the system engineering tool are - Concept Definition Tool - System Specification Tool - System Configuration Tool - Interaction with an engineering PLM/PDM system over an API The main drivers for this project are - Supporting technological evolution of the PACS (protection, automation and control systems) for next (digital) generation and future generations (virtualization of protection and control applications) - Providing answers to important challenges of the current engineering processes - Realization of Elia’s goals on overall engineering efficiency and quality improvement Important criteria for the proposed solution are - The solution needs to become an off-the-shelf market supported solution, only configuration of tools is allowed. Elia does not want to use a separate branch of a market available solution - It needs to offer the engineering efficiency required for the achievement of Elia’s project execution goals - Creating an engineering eco-system with individual interoperable and interchangeable tools - The solution requires a user experience that is intuitive, easy to understand and to learn - The solution needs to blend in in the IT landscape, and interact in a smooth way with other tools and eco-systems for the exchange of data. Elia has the ambition to use the output of this project for multiple PACS generations to come, including the virtualization of protection and control applications.

  • Contact

    bram.koster@elia.be
  • Type
    Result · Prequalification
  • Location
    Arr. de Bruxelles-Capitale/Arr. Brussel-Hoofdstad
  • Main code
    IT services: consulting, software development, Internet and support
    72000000

Similar active competitions

  • Elia Transmission Belgium

    Onshore Substations in EPCIC-FIM model

    In accordance with the latest Capex Plan, and the on-going energy transition, Elia intends to outsource multiple investment projects for onshore substations in Belgium that were previously realized in-house. The aim is to construct some substations in a EPCIC-FIM model. Meaning that the engineering, procurement (without noble materials/FIM), construction, installation and commissioning will be (partly) tendered in one contract. Only candidates that qualify in the prequalification phase of this EU procurement (see section 5.1.6) of this Qualification System will have access the tender phases.

    Qualification system
    Jun 11, 2027(100+ days)
  • Elia Asset

    Framework agreement - Busbar Protection (BBP) cubicles - 2029-2037

    Elia Asset needs a framework agreement for the design, engineering, manufacture, factory testing, packaging, transport, delivery and unloading of busbar protection (BBP) cubicles, including accessories, spare parts, after-sales service and related substation services, as well as a maintenance contract. The agreement covers delivery in Belgium and has an 8-year duration with a maximum total value of €18 million.

    Framework agreement with qualification
    Jan 14, 2027(57 days)
    €18,000,000
  • Elia Transmission Belgium

    Elektrisk infrastruktur og veibelysning

    Installation services of electrical equipment in HV substations

    Elia Transmission Belgium heeft behoefte aan installatiediensten voor elektrische apparatuur in hoogspanningsstations. Dit omvat de installatie en controle van elektrische apparatuur en accessoires voor laag-, midden- en hoogspanningsniveaus, zoals verlichtingswerk, controle van aansluitingen, aansluiting van hoogspanningsapparatuur, plaatsing van kasten, installatie van cubicles en het leggen van laag-, midden- en hoogspanningskabels, interconnecties, bays, schakelinstallaties en transformatorassemblage. De werken zijn onderverdeeld in subcategorieën op basis van het spanningsniveau: MS/36, 70, 110, 150, 220 en 380.

    Qualification system
    Apr 14, 2029(100+ days)