Belgium: Tenders/Elia Transmission Belgium/Voltage and Reactive Power Control Service 2025-2026
  1. Competition notice published

    May 12, 2024 8:00 PMMay 12, 2024 8:00 PM
  2. Change in competition

    May 16, 2024 8:00 PMMay 16, 2024 8:00 PM
  3. Qualification deadline

    Jun 15, 2024 9:55 PMJune 15, 2024 9:55 PM
  4. Tender submission deadline

    Comes with the invitation
  5. Contract start date

    Jan 1, 2025 12:00 AMJanuary 1, 2025 12:00 AM
  6. Contract end date

    Dec 31, 12:00 AMDecember 31, 2026 12:00 AM

Brief

Voltage and Reactive Power Control Service 2025-2026

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Jun 15, 2024Expired
Procedure
With negotiationTwo stages
Agreement
Framework agreementuntil Dec 2026

Brief

Elia will contract one or several companies for the supply of voltage and reactive power control service for the delivery period of 01/01/2025 until and including 31/12/2026.

Elektrisitet og energiforvaltning

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Elia Transmission Belgium

From the notice

  • Elia will contract one or several companies for the supply of voltage and reactive power control service for the delivery period of 01/01/2025 until and including 31/12/2026.

  • Contact

    tender.vsp@elia.be
  • Type
    Competition · Framework agreement · Prequalification
  • Location
    Arr. de Bruxelles-Capitale/Arr. Brussel-Hoofdstad
  • Main code
    Electricity
    09310000

Similar active competitions

  • Elia Asset

    Elektrisitet og energiforvaltning

    Qualification for supply of electrical energy for Grid losses

    Elia, in its role as high-voltage grid operator in Belgium, is looking to purchase electric Energy to offset grid losses generated by the normal operational operation of the high-voltage electric grid.

    Qualification system
    Dec 27, 2027(100+ days)
  • Elia Transmission Belgium

    Elektrisk infrastruktur og veibelysning

    Installation services of electrical equipment in HV substations

    Elia Transmission Belgium heeft behoefte aan installatiediensten voor elektrische apparatuur in hoogspanningsstations. Dit omvat de installatie en controle van elektrische apparatuur en accessoires voor laag-, midden- en hoogspanningsniveaus, zoals verlichtingswerk, controle van aansluitingen, aansluiting van hoogspanningsapparatuur, plaatsing van kasten, installatie van cubicles en het leggen van laag-, midden- en hoogspanningskabels, interconnecties, bays, schakelinstallaties en transformatorassemblage. De werken zijn onderverdeeld in subcategorieën op basis van het spanningsniveau: MS/36, 70, 110, 150, 220 en 380.

    Qualification system
    Apr 14, 2029(100+ days)
  • Elia Asset

    Framework agreement - Busbar Protection (BBP) cubicles - 2029-2037

    Elia Asset needs a framework agreement for the design, engineering, manufacture, factory testing, packaging, transport, delivery and unloading of busbar protection (BBP) cubicles, including accessories, spare parts, after-sales service and related substation services, as well as a maintenance contract. The agreement covers delivery in Belgium and has an 8-year duration with a maximum total value of €18 million.

    Framework agreement with qualification
    Jan 14, 2027(57 days)
    €18,000,000