Search
  • Search


Netherlands: Tenders/Alliander N.V./Voluntary Ex Ante Transparency Announcement for the relinen gas work package
  1. Result notice published

    Oct 14, 12:33 PMOctober 14, 2026 12:33 PM
  2. Contract start date

    Nov 1, 12:00 AMNovember 1, 2026 12:00 AM
  3. Contract end date

    Oct 31, 2030 12:00 AMOctober 31, 2030 12:00 AM

Brief

Voluntary Ex Ante Transparency Announcement for the relinen gas work package

Procedure
Without prior noticeTwo stages
Agreement
Framework agreementuntil Oct 2030

Brief

Alliander N.V. intends to enter into a framework agreement with Van Gelder Kabel-, Leiding- en Montagewerken B.V. for the relinen gas work package, involving the renovation of gray cast iron gas pipes with a glued sleeve, across Alliander's service area in the Netherlands. The agreement has an initial term of 4 years with two 1-year options, totaling 6 years. The contractor must have demonstrable experience in seamless sleeving of gray cast iron gas pipes, proven knowledge of the Dutch gas network and associated safety/quality requirements, relevant certifications (NTA 8032:2016 NL, VIAG designation, or comparable), the ability to carry out work nationally and in the short term, sufficient qualified personnel, specialized equipment, an established implementation organization, and the capacity to meet production numbers. Additionally, the contractor must meet quality assurance requirements in accordance with CKB and ISO 9001:2015 (or equivalent) and provide revision data according to WIBON and Liander's 'Aanlevereisen ondergrondse revisie v2.4'. The work involves pipes with diameters DN 150, DN 200, DN 250, DN 300, DN 400, and DN 600.

Rørlegger- og sanitærarbeid

Result

TED
  • Van Gelder Kabel‑, Leiding‑ en Montagewerken B.V.
    Winner
  • Number of bids
    0
  • Contract value
    Not stated
  • Maximum framework agreement valueUp to €30,000,000

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Alliander N.V.

From the notice

  • This voluntary transparency announcement in accordance with Article 4.16 of the Public Procurement Act 2012 concerns Alliander N.V.'s intention to enter into a framework agreement with Van Gelder Kabel-, Leiding- en Montagewerken B.V. for Alliander's relinen gas work package with a total term of six years, using the negotiated procedure without prior notification pursuant to Article 3.36(1)(c)(2) of the Dutch Public Procurement Act 2012. Background and objective In relining, the inside of a gray cast iron gas pipe is renovated with a glued sleeve. Alliander intends to reline grey cast-iron gas pipes when traditional remediation is not preferred (e.g. in densely urban areas). This ensures less environmental nuisance and higher productivity. Reason for voluntary transparency in advance Alliander N.V. intends to enter into a framework agreement with Van Gelder Kabel-, Leiding- en Montagewerken B.V. for Alliander's relining gas work package with an initial term of four years and two one-year extensions by means of the negotiated procedure without prior publication pursuant to Article 3.36(1)(c)(2) of the Public Procurement Act 2012. The total term of the intended agreement is therefore six years. Market research by Alliander has shown that Van Gelder Kabel-, Leiding- en Montagewerken B.V. is the only party that can implement this work package in the foreseeable future and also meet Alliander's requirements and specifications and has the right qualifications. These are necessary to guarantee quality and safety. Technical and operational requirements For the implementation of the Relinen Gas work package, Alliander sets requirements arising from the critical nature of the gas infrastructure, the scope of the work package and the required continuity of the remediation task. The contractor must, among other things: • have demonstrable experience in relining grey cast iron gas pipes using the seamless sleeving method; • have proven knowledge of the Dutch gas network and the associated safety and quality requirements; • have the certifications, powers and safety qualifications required for the work (NTA 8032:2016 NL, VIAG designation, or comparable qualifications); • to be able to carry out the work in the short term and on a national scale within Alliander's service area; • have a sufficient number of qualified personnel to be deployed immediately, specialised equipment and an established implementation organisation for relining work with a seamless stocking; • be able to demonstrate the ability to achieve the required production numbers and capacity demand in the short term; • to meet the requirements with regard to quality assurance in accordance with CKB and ISO 9001:2015 (or equivalent) and to provide revision data in accordance with the WIBON and Liander's 'Aanlevereisen ondergrondse revisie v2.4' included in Appendix G.1.1. (see Mercell for download); • Diameters of the pipes to be provided with a seamless sleeve by means of relining: DN 150 / DN 200 / DN 250 / DN 300 / DN 400 / DN 600. No reasonable alternative or substitute The market research carried out by Alliander has shown that several market parties are interested in relining work. At the same time, it has been established that only one party currently has the demonstrable combination of required experience, available capacity, operational structure and qualifications. This party also has the immediate availability to carry out the entire work package within the set conditions. On this basis, Alliander concludes that there is currently no reasonable alternative or substitute available that can meet the technical and operational requirements of the work package in a timely manner. Objection If you object to the intended award of the contract to Van Gelder Kabel-, Leiding- en Montagewerken B.V., or if you believe that the aforementioned award wrongly relies on an exception to the procurement rules, you may make your objections known by initiating summary proceedings (kort geding) within twenty (20) calendar days of the date of publication of this notice. If no such proceedings are initiated within this period, the agreement described above may be concluded and such objections can no longer result in the annulment or invalidation of the agreement.

  • Contact

    Jan Tempertjan.tempert@alliander.com
  • Type
    Result · Framework agreement · Prequalification
  • Main code
    General construction work for pipelines
    45231100

Similar active competitions

  • Alliander N.V.

    Diverse konstruksjonsmateriell

    HDPE Glasvezelbuis

    Alliander N.V. heeft een raamovereenkomst nodig voor de levering van HDPE-glasvezelbuizen en toebehoren voor de aanleg en uitbreiding van haar telecominfrastructuur, met een maximale totale waarde van 4,8 miljoen euro. De aanbesteding wordt uitgevoerd als een niet-openbare procedure, waarbij geschikte partijen worden uitgenodigd voor het indienen van een inschrijving. Pipelife Nederland B.V. heeft momenteel een vergelijkbaar contract.

    Framework agreement with qualification
    Nov 10, 2026(4 days)
    €4,800,000
  • Alliander N.V.

    Rørlegger- og sanitærarbeid

    Gasmeter aansluitsets G10, G16 en G25

    Alliander N.V. heeft behoefte aan de levering van gasmeter aansluitsets (G10, G16 en G25) en gasdrukregelaars via een raamovereenkomst met een maximale totale waarde van 3,4 miljoen euro. De aansluitsets zijn voor gasmetercapaciteiten van 16m3/h (G10), 25m3/h (G16) en 40m3/h (G25), inclusief versies met en zonder gasdrukregelaar, zowel voor nieuwe aansluitingen als ter vervanging. De gasdrukregelaars moeten een capaciteit hebben tot 25 m3/h en tot 40 m3/h.

    Framework agreement
    Jan 12, 2027(67 days)
    €3,400,000
  • Alliander N.V.

    Rådgivende ingeniørtjenester for bygg og anlegg

    Marktconsultatie Toezichthouders veiligheid

    Alliander N.V. is van plan om toezichthouders voor veiligheid in te kopen en nodigt leveranciers uit voor een marktconsultatie. De geschatte maximale totale contractwaarde bedraagt 25 miljoen EUR.

    Planning
    Nov 13, 2026(7 days)
    €25,000,000