West Wing Project, National Library of Ireland, Kildare Street, Dublin 2 (Mechanical Installation)
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Jul 5, 2024Expired
- Procedure
- With prequalificationTwo stages
Brief
Works shall include the installation of new stand alone Mechanical space heating and cooling system comprising of a multi function heat pump, providing low temperature hot water central heating and chilled water cooling to the West wing and proposed circulation space extension. Ventilation to be provided through a hybrid air handling unit plant with heat recovery function, distribution ductwork to all habitable spaces in the West wing as well as extract systems from areas that are prone to elevated levels of humidity and contaminants such as toilets, wet rooms, kitchens and storage areas. Mechanical smoke extract system to be installed in extension. Water services infrastructure in the existing building to be extended to serve the West wing and above ground drainage from all sanitary ware, appliances and above ground surface drainage. Fire fighting and protective services to be installed in compliance with regulations. A building management system is to be provided to monitor, meter and control mechanical plant and utilities as well as monitor internal environmental conditions (temperature, humidity, CO2 levels) while logging information on the central building management system in the existing building and on the cloud. The existing fire protection sprinkler system is to be extended from the existing system infrastructure in the main NLI building. Fire sprinkler to be installed and commissioned by suitably qualified contractor to also take design responsibility of system.
Mekaniske installasjoner
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Tailte Éireann
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
From the notice
Works shall include the installation of new stand alone Mechanical space heating and cooling system comprising of a multi function heat pump, providing low temperature hot water central heating and chilled water cooling to the West wing and proposed circulation space extension. Ventilation to be provided through a hybrid air handling unit plant with heat recovery function, distribution ductwork to all habitable spaces in the West wing as well as extract systems from areas that are prone to elevated levels of humidity and contaminants such as toilets, wet rooms, kitchens and storage areas. Mechanical smoke extract system to be installed in extension. Water services infrastructure in the existing building to be extended to serve the West wing and above ground drainage from all sanitary ware, appliances and above ground surface drainage. Fire fighting and protective services to be installed in compliance with regulations. A building management system is to be provided to monitor, meter and control mechanical plant and utilities as well as monitor internal environmental conditions (temperature, humidity, CO2 levels) while logging information on the central building management system in the existing building and on the cloud. The existing fire protection sprinkler system is to be extended from the existing system infrastructure in the main NLI building. Fire sprinkler to be installed and commissioned by suitably qualified contractor to also take design responsibility of system.
Contact
claire.oriordan@opw.ie- Competition · PrequalificationType
- 45350000Main codeMechanical installations
- 45212314Historical monument or memorial construction work45212350Buildings of particular historical or architectural interest45330000Plumbing and sanitary works45351000Mechanical engineering installation works45453100Refurbishment work45454100Restoration work