Works contracts – Section 3 Paraćin – Trupale (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
Grunnarbeid og anleggsvirksomhet
Serbian Railway Infrastructure JSC planira nabavku radova na deonici 3 Paraćin – Trupale, koja obuhvata poddeonice 3.1 Paraćin–Stalać i 3.3 Đunis–Trupale, u okviru projekta modernizacije pruge Beograd – Niš. Radovi uključuju rekonstrukciju i modernizaciju devet stanica, izgradnju nadvožnjaka, mostova, propusta, podvožnjaka, potpornih zidova i sistema kontaktne mreže, kao i električnih instalacija. Zainteresovani dobavljači se pozivaju da dostave povratne informacije i doprinose putem upitnika za tržišne konsultacije.
About the bid
- Contact name
- Janko Kovljanic
- Contact phone
- +381 66 8404234
- Contact email
- Investicije.projekatbn@srbrail.rs
- Address
- Nemanjina 6, 11000 Belgrade
The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into three subsections, (sub-section 3.2 Stalać – Đunis is already contracted). The works relate to Sub-sections 3.1 Paraćin–Stalać and 3.3 Đunis–Trupale. Sub-section Paraćin–Stalać is 20.8 km long, while Sub-section Đunis–Trupale is 37.7 km long. A total of nine stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Sub-section 3.1 and 160 km/h for Sub-section 3.3. On Sub-section 3.1, works include 12 grade-separated crossings, 8 bridges and culverts, 2 pedestrian underpasses, 1 retaining wall, and 17 culvert structures beneath the railway track. On Sub-section 3.3, works include 18 grade-separated crossings, 14 bridges and culverts, 2 pedestrian underpasses, 15 retaining walls, 18 culvert structures beneath the railway track, and 2 culvert structures beneath roadways. Across both Sub-sections 3.1 and 3.3, works include reconstruction of the existing and construction of new overhead contact line (OCL) systems, as well as electrical power installations in stations, tunnels and tunnel entrances, energy facilities, relay stations, sectioning posts (including those with neutral sections), remote control systems for electric traction installations, transformer stations supplied from OCL, and lighting of grade-separated crossings and access roads. During the execution of signalling works in stations, automatic switching of turnouts and train routes will not be possible. Due to the shutdown of station signalling systems, operations will be adapted to a temporary mode. Inter-signal interlocking devices (UMZ) will be used, installed in temporary rooms for train dispatchers, with traffic managed within station areas. Some limited works on neighbouring sections may be included in the scope of the contract.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Found no award criteria in the contract notice.
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Serbian Railway Infrastructure JSC
- Title
- Works contracts – Section 3 Paraćin – Trupale (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project
- Type
- Main code
- Supplemental codes
No supplemental codes from buyer…