    Works contracts – Section 3 Paraćin – Trupale (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project

    Serbian Railway Infrastructure JSC

    Works contracts – Section 3 Paraćin – Trupale (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project

    1. Planning notice published

      Apr 2, 9:22 AMApril 2, 2026 9:22 AM
    2. Planned competition start

      May 18, 12:00 AMMay 18, 2026 12:00 AM

    Brief

    Tender search/Serbian Railway Infrastructure JSC/Works contracts – Section 3 Paraćin – Trupale (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Brief

    Grunnarbeid og anleggsvirksomhet

    Serbian Railway Infrastructure JSC planira nabavku radova na deonici 3 Paraćin – Trupale, koja obuhvata poddeonice 3.1 Paraćin–Stalać i 3.3 Đunis–Trupale, u okviru projekta modernizacije pruge Beograd – Niš. Radovi uključuju rekonstrukciju i modernizaciju devet stanica, izgradnju nadvožnjaka, mostova, propusta, podvožnjaka, potpornih zidova i sistema kontaktne mreže, kao i električnih instalacija. Zainteresovani dobavljači se pozivaju da dostave povratne informacije i doprinose putem upitnika za tržišne konsultacije.

    About the bid

      The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into three subsections, (sub-section 3.2 Stalać – Đunis is already contracted). The works relate to Sub-sections 3.1 Paraćin–Stalać and 3.3 Đunis–Trupale. Sub-section Paraćin–Stalać is 20.8 km long, while Sub-section Đunis–Trupale is 37.7 km long. A total of nine stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Sub-section 3.1 and 160 km/h for Sub-section 3.3. On Sub-section 3.1, works include 12 grade-separated crossings, 8 bridges and culverts, 2 pedestrian underpasses, 1 retaining wall, and 17 culvert structures beneath the railway track. On Sub-section 3.3, works include 18 grade-separated crossings, 14 bridges and culverts, 2 pedestrian underpasses, 15 retaining walls, 18 culvert structures beneath the railway track, and 2 culvert structures beneath roadways. Across both Sub-sections 3.1 and 3.3, works include reconstruction of the existing and construction of new overhead contact line (OCL) systems, as well as electrical power installations in stations, tunnels and tunnel entrances, energy facilities, relay stations, sectioning posts (including those with neutral sections), remote control systems for electric traction installations, transformer stations supplied from OCL, and lighting of grade-separated crossings and access roads. During the execution of signalling works in stations, automatic switching of turnouts and train routes will not be possible. Due to the shutdown of station signalling systems, operations will be adapted to a temporary mode. Inter-signal interlocking devices (UMZ) will be used, installed in temporary rooms for train dispatchers, with traffic managed within station areas. Some limited works on neighbouring sections may be included in the scope of the contract.

      Contact name
      Janko Kovljanic
      Contact phone
      +381 66 8404234
      Contact email
      Investicije.projekatbn@srbrail.rs
      Address
      Nemanjina 6, 11000 Belgrade

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Serbian Railway Infrastructure JSC
    Title
    Works contracts – Section 3 Paraćin – Trupale (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project
    Type
    Planning
    Main code
    45234100Railway construction works
    Supplemental codes

    No supplemental codes from buyer…

    Active similar competitions

    • Serbian Railway Infrastructure JSC

      Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project

      Serbian Railway Infrastructure JSC needs Engineer/Supervision services for the design and build works contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project, for a duration of 72 months. The services involve supervision of the design for the building permit, construction design, as-built design, and the works under the Works Contracts for Section 3, which are implemented through two Design and Build Works Contracts covering Subsections 3.1, 3.3, 3.4, and 3.2. The contract will be awarded based on the most economically advantageous tender, with a quality-to-price ratio of 80:20. The procurement process will follow restricted procedures (two stages).

      Competition with qualificationSep 17, 2026
      Oct 15, 2026(5 days)
    • Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI)

      Grunnarbeid og anleggsvirksomhet

      Construction of New Railway Section from Kriva Palanka to the Border of the Republic of Bulgaria, as part of Corridor VIII

      Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI) needs construction services for approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, as part of Corridor VIII, over 84 months. The project includes the construction of Kriva Palanka station, Zidilovo halt/station, 21 tunnels (totaling approximately 8.5 km), 51 bridges/viaducts (totaling approximately 5 km), permanent way, earthworks, drainage, retaining structures, access roads, and associated civil and interface works. The railway will have a maximum design speed of 100 km/h. Participants must be duly constituted, incorporated, or registered in accordance with the laws of their country of establishment and provide evidence of their legal status and registration. They must also submit an undertaking to obtain any project-specific licenses, permits, certificates, or authorizations required by the Republic of North Macedonia if awarded the contract.

      CompetitionSep 22, 2026
      Jan 20, 2027(102 days)
    • Public Enterprise for Railway Infrastructure Railways of Republic of Norh Macedonia-Skopje

      Jernbaneskilt og jernbaneutstyr

      Wooden material for upper structure (railway sleepers)

      Public Enterprise for Railway Infrastructure Railways of Republic of Norh Macedonia-Skopje needs railway sleepers for a duration of 12 months, with a maximum total value of 30,000,000 MKD. The award criterion is the lowest price.

      CompetitionSep 16, 2026
      Oct 19, 2026(9 days)
      MKD 30,000,000
    • State Enterprise "Railway of Moldova"

      Oppføring av bygninger

      Design services and execution of works within the project “Rehabilitation of the Roman – Iași – Frontier Railway Line – Stage I – Electrification of the Iași – Border (RO) – Ungheni (MD) Railway Line”

      Întreprinderea de Stat „Calea Ferată din Moldova” are nevoie de servicii de proiectare și execuție de lucrări pentru proiectul „Reabilitarea liniei de cale ferată Roman – Iași – Frontieră – Etapa I – Electrificarea liniei de cale ferată Iași – Frontieră (RO) – Ungheni (MD)”, în cadrul unui aranjament de tip „Design & Build / La cheie”, cu o valoare maximă totală de 5.621.016 EUR, pe o durată de 24 de luni. Contractul include proiectarea și execuția lucrărilor pe teritoriul Republicii Moldova, inclusiv modernizarea podului feroviar Eiffel peste râul Prut, reconstrucția infrastructurii feroviare și a liniilor de cale ferată cu ecartament de 1435 mm în stația Ungheni, electrificarea liniei de cale ferată la 25 kV, 50 Hz, inclusiv sistemul de alimentare cu energie de tracțiune și linia de contact aeriană, precum și lucrări legate de semnalizare, interblocare, telecomunicații și protecția/relocarea rețelelor de utilități afectate.

      CompetitionSep 9, 2026
      Oct 14, 2026(4 days)
      €5,621,016
    • Bane Nor Sf

      Byggeteknisk konsulentvirksomhet

      Forberedende arbeider ERTMS Nordlandsbanen(Grong) - Ski

      Bane Nor Sf trenger forberedende arbeider for innføring av ERTMS på Nordlandsbanen (Grong)-Bodø. Kontrakten omfatter prosjektering og bygging av føringsveier og etablering av fundamenter for nye tekniske hus.

      CompetitionMar 10, 2020