    Wykonanie robót budowlano-montażowych oraz zakup, dostawa i montaż transformatorów WN/SN dla zadania: „Przebudowa stacji elektroenergetycznej 110/15kV GPZ Cedry”.

    ENERGA-OPERATOR S.A.

    Wykonanie robót budowlano-montażowych oraz zakup, dostawa i montaż transformatorów WN/SN dla zadania: „Przebudowa stacji elektroenergetycznej 110/15kV GPZ Cedry”.

    1. Competition notice published

      Aug 29, 3:05 PMAugust 29, 2024 3:05 PM
    2. Change in competition

      Sep 25, 5:02 AMSeptember 25, 2024 5:02 AM
    3. Change in competition

      Oct 7, 9:02 AMOctober 7, 2024 9:02 AM
    4. Change in competition

      Oct 15, 11:19 AMOctober 15, 2024 11:19 AM
    5. Change in competition

      Oct 17, 6:28 AMOctober 17, 2024 6:28 AM
    6. Change in competition

      Oct 25, 4:26 AMOctober 25, 2024 4:26 AM
    7. Supplier selection

      Dec 23, 12:00 AMDecember 23, 2024 12:00 AM
    8. Contract signed

      Jan 28, 12:00 AMJanuary 28, 2025 12:00 AM
    9. Result notice published

      Feb 3, 10:37 AMFebruary 3, 2025 10:37 AM

    Brief

    Poland: Tenders/ENERGA-OPERATOR S.A./Wykonanie robót budowlano-montażowych oraz zakup, dostawa i montaż transformatorów WN/SN dla zadania: „Przebudowa stacji elektroenergetycznej 110/15kV GPZ Cedry”.

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Anleggs- og infrastrukturbygging

    1.Przedmiotem zamówienia jest wykonanie robót budowlano-montażowych oraz zakup, dostawa i montaż transformatorów WN/SN dla zadania: „Przebudowa stacji elektroenergetycznej 110/15kV GPZ Cedry”. 1.1. Zakres robót obejmuje: 1.1.1. Demontaże: (1) napowietrzna rozdzielnica WN 110kV w technologii tradycyjnej wraz z konstrukcjami wsporczymi i fundamentami, (2) bramki szynowe z fundamentami oraz bramki transformatorowe wraz z fundamentami, (3) wiata p.poż., (4) aparatura SN na stanowiskach kompensacji ziemnozwarciowej, (5) oświetlenie terenu stacji, (6) maszty i iglice odgromowe wraz z fundamentami, (7) szafki kablowe pól rozdzielni 110kV, (8) kable obwodów wtórnych od istniejącej aparatury do nastawni, (9) ogrodzenie wraz z furtką i bramą, (10) transformatorów WN/SN nr 1 i nr 2 o mocy 16 MVA każdy, (11) bramki końcowe i mosty napowietrzne wyprowadzeń SN. 1.1.2. Budowa: (1) rozdzielnia 110kV napowietrzna, sekcjonowana, pięciopolowa, w układzie H-5, z możliwością rozbudowy o dwa pola liniowe, (2) wyprowadzeń linii SN oraz powiązaniami z siecią SN, (3) dwa stanowiska kompensacji ziemnozwarciowej wyposażone w: transformator potrzeb własnych, dławik kompensujące z regulacją nadążną, (4) transformatorów WN/SN nr 1 i nr 2 o mocy 40 MVA każdy, (5) ogrodzenia stacji wykonanego z systemowych paneli stalowych o wysokości 2160mm i ocynkowanych elementów tj. słupków o wysokości 2600mm, bramy oraz furtki, (6) obwody wtórne rozdzielni 110kV, 1.2. Wyszczególnienie i opis prac towarzyszących i robót tymczasowych oraz przedmiar i obmiar robót — zgodnie z dokumentacją projektową. 2. Szczegółowy opis przedmiotu zamówienia zawiera dokumentacja projektowa stanowiąca załącznik nr 12 do SWZ oraz STWiORB stanowiącą załącznik nr 17 do SWZ. Zamawiający wymaga, aby przedmiot zamówienia był wykonany zgodnie ze wskazanymi w niniejszej dokumentacji wytycznymi (załącznik nr 15 do SWZ) i instrukcjami oraz stanowiącymi załącznik do SWZ standardami (załącznik nr 16 do SWZ) i projektowanymi postanowieniami umowy (załącznik nr 13 do SWZ). 3. Źródła finansowania: zamówienie może stanowić element projektu, który może zostać objęty wsparciem finansowym ze środków Narodowego Funduszu Ochrony Środowiska i Gospodarki Wodnej zgromadzonych na rachunku Funduszu Modernizacyjnego, w ramach programu priorytetowego „Rozwój infrastruktury elektroenergetycznej na potrzeby rozwoju stacji ładowania pojazdów elektrycznych”.

    Result

    Winner
    EL PROFESSIONAL SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ z
    Number of bids
    8
    Contract value
    PLN 19,800,000

    About the bid

      1.Przedmiotem zamówienia jest wykonanie robót budowlano-montażowych oraz zakup, dostawa i montaż transformatorów WN/SN dla zadania: „Przebudowa stacji elektroenergetycznej 110/15kV GPZ Cedry”. 1.1. Zakres robót obejmuje: 1.1.1. Demontaże: (1) napowietrzna rozdzielnica WN 110kV w technologii tradycyjnej wraz z konstrukcjami wsporczymi i fundamentami, (2) bramki szynowe z fundamentami oraz bramki transformatorowe wraz z fundamentami, (3) wiata p.poż., (4) aparatura SN na stanowiskach kompensacji ziemnozwarciowej, (5) oświetlenie terenu stacji, (6) maszty i iglice odgromowe wraz z fundamentami, (7) szafki kablowe pól rozdzielni 110kV, (8) kable obwodów wtórnych od istniejącej aparatury do nastawni, (9) ogrodzenie wraz z furtką i bramą, (10) transformatorów WN/SN nr 1 i nr 2 o mocy 16 MVA każdy, (11) bramki końcowe i mosty napowietrzne wyprowadzeń SN. 1.1.2. Budowa: (1) rozdzielnia 110kV napowietrzna, sekcjonowana, pięciopolowa, w układzie H-5, z możliwością rozbudowy o dwa pola liniowe, (2) wyprowadzeń linii SN oraz powiązaniami z siecią SN, (3) dwa stanowiska kompensacji ziemnozwarciowej wyposażone w: transformator potrzeb własnych, dławik kompensujące z regulacją nadążną, (4) transformatorów WN/SN nr 1 i nr 2 o mocy 40 MVA każdy, (5) ogrodzenia stacji wykonanego z systemowych paneli stalowych o wysokości 2160mm i ocynkowanych elementów tj. słupków o wysokości 2600mm, bramy oraz furtki, (6) obwody wtórne rozdzielni 110kV, 1.2. Wyszczególnienie i opis prac towarzyszących i robót tymczasowych oraz przedmiar i obmiar robót — zgodnie z dokumentacją projektową. 2. Szczegółowy opis przedmiotu zamówienia zawiera dokumentacja projektowa stanowiąca załącznik nr 12 do SWZ oraz STWiORB stanowiącą załącznik nr 17 do SWZ. Zamawiający wymaga, aby przedmiot zamówienia był wykonany zgodnie ze wskazanymi w niniejszej dokumentacji wytycznymi (załącznik nr 15 do SWZ) i instrukcjami oraz stanowiącymi załącznik do SWZ standardami (załącznik nr 16 do SWZ) i projektowanymi postanowieniami umowy (załącznik nr 13 do SWZ). 3. Źródła finansowania: zamówienie może stanowić element projektu, który może zostać objęty wsparciem finansowym ze środków Narodowego Funduszu Ochrony Środowiska i Gospodarki Wodnej zgromadzonych na rachunku Funduszu Modernizacyjnego, w ramach programu priorytetowego „Rozwój infrastruktury elektroenergetycznej na potrzeby rozwoju stacji ładowania pojazdów elektrycznych”.Main features of the procedureI. Zamawiający zgodnie z art. 139 ustawy Pzp informuje, iż w pierwszej kolejności dokona badania i oceny ofert, a następnie dokona kwalifikacji podmiotowej Wykonawcy, którego oferta została najwyżej oceniona, w zakresie braku podstaw wykluczenia oraz spełniania warunków udziału w postępowaniu. II. Zamawiający przewiduje możliwość unieważnienia postępowania o udzielenie zamówienia, jeżeli środki publiczne, które zamierzał przeznaczyć na sfinansowanie całości lub części zamówienia, nie zostały mu przyznane (art. 257 ustawy Pzp). III. Wykonawca, którego oferta zostanie wybrana (uznana za najkorzystniejszą), zobowiązany jest przed zawarciem umowy w sprawie zamówienia publicznego, do wniesienia zabezpieczenia należytego wykonania umowy, w wysokości 5% ceny brutto zamówienia podanej w ofercie. Szczegółowe informacje zawarto w Rozdziale XXII SWZ. IV. Wykonawca powołujący się na zasoby podmiotu udostępniającego zasoby na zasadach określonych w art. 118 ustawy Pzp ma obowiązek przedłożenia podmiotowych środków dowodowych podmiotu udostępniającego zasoby, potwierdzających brak podstaw wykluczenia z postępowania, na podstawie przesłanek, które zostały przewidziane względem Wykonawcy. V. Wraz z ofertą za pośrednictwem platformy należy złożyć: 1.Oświadczenie, o którym mowa w art. 125 ust. 1 ustawy Pzp (zgodnie z załącznikiem nr 2 do SWZ), o niepodleganiu wykluczeniu z postępowania oraz spełnianiu warunków udziału w postępowaniu, składane na formularzu Jednolitego Europejskiego Dokumentu Zamówienia (w skrócie JEDZ), sporządzone zgodnie ze wzorem standardowego formularza określonego w rozporządzeniu wykonawczym Komisji (UE) 2016/7 z dnia 5 stycznia 2016 r. ustanawiającego standardowy formularz jednolitego europejskiego dokumentu zamówienia (Dz. Urz. UE L 3 z 06.01.2016 r., str. 16). Oświadczenie stanowi dowód potwierdzający brak podstaw wykluczenia oraz spełniania warunków udziału w postępowaniu na dzień składania ofert, tymczasowo zastępujący wymagane przez Zamawiającego podmiotowe środki dowodowe, wskazane w SWZ. 2. Dokument, z którego wynika zakres umocowania do działania w imieniu Wykonawcy w postępowaniu o udzielenie zamówienia - zgodnie z regulacją Rozdziału IX pkt 9.2 SWZ. 3. Zobowiązanie podmiotu udostępniającego zasoby, na które Wykonawca będzie się powoływał w celu spełniania warunku udziału w postępowaniu (zgodnie z zał. nr 4 do SWZ). Zgodnie z art. 118 ust. 3 ustawy Pzp Wykonawca musi złożyć wraz z ofertą zobowiązanie ww. podmiotu do oddania mu do dyspozycji tych zasobów na potrzeby realizacji zamówienia albo inne podmiotowe środki dowodowe potwierdzające, że Wykonawca realizując zamówienie, będzie dysponował niezbędnymi zasobami tych podmiotów. 4. Oświadczenie z art. 117 ust. 4 ustawy Pzp, z którego będzie wynikało, jaki zakres rzeczowy zamówienia realizować zamierzają poszczególni Wykonawcy (załącznik nr 5 do SWZ) — w przypadku Wykonawców wspólnie ubiegających się o udzielenie zamówienia (konsorcjum lub spółka cywilna). 5. Oświadczenie w zakresie przesłanek wskazanych w Rozdziale XII pkt 3 SWZ, zgodnie z załącznikiem nr 6 do SWZ. W przypadku Wykonawców wspólnie ubiegających się o udzielenie zamówienia oraz wspólników spółki cywilnej, oświadczenie, o treści zgodnej z załącznikiem nr 6 do SWZ składa odpowiednio: każdy z Wykonawców wspólnie ubiegających się o udzielenie zamówienia oraz każdy wspólnik spółki cywilnej. W przypadku korzystania przez Wykonawcę z zasobów podmiotu, o którym mowa w pkt 3 powyżej oświadczenie podmiotu udostępniającego zasoby, w zakresie przesłanek wskazanych w Rozdziale XII pkt 3 SWZ – zgodnie z zał. nr 6 do SWZ. 6. Dowód wniesienia wadium (Szczegółowe informacje znajdują się w Rozdziale IX pkt 9.7 SWZ) 7. Dokumenty wykazujące wystąpienie wszystkich przesłanek, o których mowa w art. 11 ust. 2 ustawy o zwalczaniu nieuczciwej konkurencji, niezbędne do utajnienia informacji — jeżeli Wykonawca zastrzegł w ofercie, że określone informacje stanowią tajemnicę przedsiębiorstwa w rozumieniu przepisów i nie mogą być udostępniane (jeżeli dotyczy). 8.Ofertę w języku polskim należy złożyć za pośrednictwem Platformy zakupowej zakupy.energa-operator.pl , pod rygorem nieważności z zachowaniem formy elektronicznej (postać elektroniczna opatrzona kwalifikowanym podpisem elektronicznym). Za datę i godzinę złożenia oferty rozumie się datę i godzinę jej wpływu na Platformę, tj. datę i godzinę złożenia oferty wyświetloną na koncie Zamawiającego. 9.Treść oferty musi odpowiadać treści SWZ pod rygorem odrzucenia na podstawie art. 226 ust. 1 pkt 5 ustawy Pzp. Zamawiający rekomenduje przygotowanie oferty w formacie .pdf. 10. Formularz oferty oraz pozostałe dokumenty, dla których Zamawiający określił wzory w formie załączników do SWZ, winny być sporządzone zgodnie z tymi wzorami co do treści. 11. Zamawiający nie przewiduje publicznej sesji otwarcia ofert w siedzibie Zamawiającego – jawność postępowania publicznego zapewniona jest poprzez realizację obowiązku wskazanego w art. 222 ust. 5 ustawy Pzp. 12. Najpóźniej przed otwarciem ofert, Zamawiający udostępni na Platformie zakupowej informację o kwocie, jaką zamierza przeznaczyć na sfinansowanie niniejszego zamówienia (kwota brutto, wraz z podatkiem VAT). 13. Sposób przekazywania dokumentów, poświadczania zgodności cyfrowego odwzorowania z dokumentem w postaci papierowej zostały opisane w Rozdziale XIV SWZ.

      Contact name
      Energa Logistyka sp. z o. o.
      Contact phone
      +48 785 800 644
      Contact email
      marzena.bielinska@energa.pl
      Address
      ul. Marynarki Polskiej 130, 80-557 Gdańsk

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      Cena 100% obliczona wg wzoru: CENA – waga 100%, punktacja obliczona wg wzoru C.min./C.of×100 gdzie skróty oznaczają: C.min – najniższa cena spośród ofert nieodrzuconych; C.of – cena oferty badanej; 1. Jeżeli nie można wybrać najkorzystniejszej oferty z uwagi na to, że dwie lub więcej ofert przedstawia taki sam bilans ceny i innych kryteriów oceny ofert, Zamawiający wybiera spośród tych ofert ofertę, która otrzymała najwyższą ocenę w kryterium o najwyższej wadze. 1.1 Jeżeli oferty otrzymały taką samą ocenę w kryterium o najwyższej wadze, Zamawiający wybiera ofertę z najniższą ceną. 1.2 Jeżeli nie można dokonać wyboru oferty w sposób, o którym mowa w pkt 1.1, Zamawiający wzywa Wykonawców, którzy złożyli te oferty, do złożenia w terminie określonym przez Zamawiającego ofert dodatkowych zawierających nową cenę.

      Evaluation Method

      Punktacja obliczona wg wzoru: C.min./C.of×100, gdzie C.min to najniższa cena spośród ofert nieodrzuconych, a C.of to cena oferty badanej.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    ENERGA-OPERATOR S.A.
    Title
    Wykonanie robót budowlano-montażowych oraz zakup, dostawa i montaż transformatorów WN/SN dla zadania: „Przebudowa stacji elektroenergetycznej 110/15kV GPZ Cedry”.
    Type
    ResultPrequalification
    Main code
    45100000Site preparation work
    Supplemental codes
    45110000Building demolition and wrecking work and earthmoving work45111000Demolition, site preparation and clearance work45112000Excavating and earthmoving work45113000Siteworks45220000Engineering works and construction works45222000Construction work for engineering works except bridges, tunnels, shafts and subways45223000Structures construction work45232000Ancillary works for pipelines and cables45233000Construction, foundation and surface works for highways, roads45236000Flatwork45300000Building installation work45310000Electrical installation work45311000Electrical wiring and fitting work45314000Installation of telecommunications equipment45317000Other electrical installation work45330000Plumbing and sanitary works45400000Building completion work45440000Painting and glazing work45442000Application work of protective coatings45450000Other building completion work45500000Hire of construction and civil engineering machinery and equipment with operator45510000Hire of cranes with operator45520000Hire of earthmoving equipment with operator51000000Installation services (except software)51100000Installation services of electrical and mechanical equipment51110000Installation services of electrical equipment51900000Installation services of guidance and control systems71000000Architectural, construction, engineering and inspection services71220000Architectural design services71300000Engineering services71320000Engineering design services71330000Miscellaneous engineering services71333000Mechanical engineering services71334000Mechanical and electrical engineering services71340000Integrated engineering services71350000Engineering-related scientific and technical services71352000Subsurface surveying services71354000Map-making services71355000Surveying services71356000Technical services71500000Construction-related services71510000Site-investigation services71520000Construction supervision services71521000Construction-site supervision services71540000Construction management services71541000Construction project management services
    Location
    Gdański
    Duration
    18 months

    Active similar competitions

    • ENERGA-OPERATOR S.A.

      Grunnarbeid og utleie av anleggsmaskiner

      Wykonanie projektu budowlano-wykonawczego oraz robót budowlano-montażowych według tego projektu dla zadania pn. „Przyłączenie do sieci elektroenergetycznej ogólnodostępnej stacji ładowania pojazdów na dz. 712/4 obr. 3 Daniszew”

      ENERGA-OPERATOR S.A. potrzebuje wykonania projektu budowlano-wykonawczego oraz robót budowlano-montażowych dla zadania „Przyłączenie do sieci elektroenergetycznej ogólnodostępnej stacji ładowania pojazdów na dz. 712/4 obr. 3 Daniszew” w Konińskim, na okres 27 miesięcy. Zamówienie obejmuje dwa etapy: wykonanie dokumentacji projektowej wraz z uzyskaniem wszelkich wymaganych opinii, uzgodnień i decyzji oraz praw do nieruchomości, a następnie realizację robót budowlano-montażowych zgodnie z opracowaną dokumentacją. Wymagane jest, aby używane oprogramowanie, materiały, produkty lub urządzenia pochodziły z państw członkowskich Unii Europejskiej lub państw trzecich będących stronami Porozumienia Światowej Organizacji Handlu w sprawie zamówień rządowych, oraz aby nie zawierały produktów, usług ani procesów ICT wskazanych jako mające negatywny wpływ na bezpieczeństwo państwa lub uznanych za wysokiego ryzyka. Nie będą akceptowane urządzenia wykorzystujące fluorowane gazy cieplarniane o współczynniku globalnego ocieplenia równym 1 lub większym, jeśli zakończenie realizacji umowy nastąpi po 1 stycznia 2028 r. Kryterium oceny ofert stanowi cena (100%).

      CompetitionOct 5, 2026
      Nov 5, 2026(26 days)
    • ENERGA-OPERATOR S.A.

      Grunnarbeid og utleie av anleggsmaskiner

      Wykonanie robót budowlano-montażowych dla zadania: „Budowa linii WN 110 kV relacji GPZ Ostróda – GPZ Olsztynek oraz rozbudowa GPZ Olsztynek” (Etap 3)

      ENERGA-OPERATOR S.A. potrzebuje usług budowlano-montażowych w Olsztynie, obejmujących budowę jednotorowej linii napowietrzno-kablowej WN 110 kV, przebudowę linii jednotorowej na dwutorową oraz rozbudowę istniejącej rozdzielni 110 kV w GPZ Olsztynek, w celu wprowadzenia drugiego toru linii 110 kV. Czas trwania umowy wynosi 18 miesięcy. Wymagane jest, aby wykonanie przedmiotu zamówienia odbywało się wyłącznie przy użyciu oprogramowania, materiałów, produktów lub urządzeń pochodzących z państw członkowskich Unii Europejskiej lub państw trzecich będących stronami Porozumienia Światowej Organizacji Handlu w sprawie zamówień rządowych lub innych umów międzynarodowych, których stroną jest Unia Europejska. Ponadto, przedmiot zamówienia nie może obejmować produktów, usług ani procesów ICT, które zostały wskazane jako mające negatywny wpływ na bezpieczeństwo państwa lub uznane za wysokiego ryzyka. Zamawiający nie zaakceptuje urządzeń wykorzystujących fluorowane gazy cieplarniane o współczynniku globalnego ocieplenia równym 1 lub większym, jeśli zakończenie realizacji umowy nastąpi po 1 stycznia 2028 roku. Wykonawca udzieli 60-miesięcznej gwarancji. Kryterium oceny ofert stanowi cena (100%).

      CompetitionSep 29, 2026
      Oct 30, 2026(20 days)
    • Enea Wytwarzanie Sp. z o.o. z siedzibą w Świerżach Górnych

      Elektrisk infrastruktur og veibelysning

      "WYKONAWCA EPC NA POTRZEBY REALIZACJI PROJEKTU BUDOWY MAGAZYNU ENERGII ELEKTRYCZNEJ MEE ELKO I NA TERENIE ENEA WYTWARZANIE SP. Z O.O. W ŚWIERŻACH GÓRNYCH"

      Enea Wytwarzanie Sp. z o.o. z siedzibą w Świerżach Górnych potrzebuje wykonawcy EPC do realizacji projektu budowy magazynu energii elektrycznej MEE ELKO I na terenie Enea Wytwarzanie Sp. z o.o. w Świerżach Górnych. Zamówienie obejmuje prace budowlane, a jedynym kryterium oceny ofert jest cena (100%). Wymagane jest posiadanie środków finansowych lub zdolności kredytowej w wysokości co najmniej 50 000 000,00 zł oraz ubezpieczenie od odpowiedzialności cywilnej na kwotę minimum 100 000 000,00 zł. Wykonawca musi również wykazać się oceną scoringową powyżej 3,75 pkt za ostatni rok obrotowy. Ponadto, wymagane jest doświadczenie w realizacji co najmniej 2 inwestycji w formule EPC, Generalnego Wykonawstwa lub równoważnej w ciągu ostatnich 10 lat, obejmujących projektowanie, dostawy, budowę, uruchomienie i przekazanie do eksploatacji infrastruktury elektroenergetycznej (magazyn energii elektrycznej o mocy min. 20 MW, stacja elektroenergetyczna WN/SN lub NN/WN o napięciu min. 110 kV, GPO dla farmy PV lub wiatrowej o mocy min. 20 MW, lub źródło wytwórcze/instalacja przemysłowa o mocy min. 50 MWe przyłączona do sieci o napięciu min. 110 kV), przy czym co najmniej 1 z tych inwestycji musiała obejmować realizację systemu SCADA, automatyki zabezpieczeniowej EAZ, konfiguracji i uruchomienia komunikacji zgodnej z IEC 61850 lub IEC 61869 lub równoważnych, budowę lub przebudowę układu elektroenergetycznego o napięciu min. 110 kV, oraz prace rozruchowe. Wymagane jest również dysponowanie zespołem specjalistów, w tym Kierownikiem Projektu EPC (min. 10 lat doświadczenia w energetyce, kierowanie 2 zadaniami budowy/przebudowy źródeł wytwórczych o wartości min. 70 mln PLN każde oraz 1 zadaniem budowy stacji elektroenergetycznej/instalacji OZE/magazynu energii/instalacji przemysłowej przyłączonej do sieci WN/NN o napięciu min. 110 kV), Głównym Projektantem/Koordynatorem Projektowania (uprawnienia budowlane, min. 10 lat doświadczenia projektowego, wykonanie 2 projektów architektoniczno-budowlanych/wykonawczych/technicznych budowy/przebudowy stacji elektroenergetycznej/instalacji OZE/magazynu energii/instalacji przemysłowej przyłączonej do sieci WN/NN o napięciu min. 110 kV w ciągu ostatnich 5 lat), Projektantem Branży Elektroenergetycznej WN/SN (uprawnienia budowlane, min. 5 lat doświadczenia projektowego, wykonanie 1 projektu architektoniczno-budowlanego/wykonawczego/technicznego budowy/przebudowy stacji elektroenergetycznej/układu wyprowadzenia mocy o napięciu min. 110 kV w ciągu ostatnich 5 lat), Projektantem Branży Sanitarnej (uprawnienia budowlane, min. 5 lat doświadczenia projektowego), Projektantem Branży Konstrukcyjno-Budowlanej (uprawnienia budowlane, min. 5 lat doświadczenia projektowego), Kierownikiem Budowy (uprawnienia budowlane, min. 10 lat doświadczenia na stanowisku kierownika budowy/robót, kierowanie 1 budową obiektów elektroenergetycznych/przemysłowych o wartości min. 100 mln PLN, 1 inwestycją obejmującą budowę stacji elektroenergetycznej/instalacji OZE/magazynu energii/instalacji przemysłowej przyłączonej do sieci WN/NN o napięciu min. 110 kV), Kierownikiem Robót Elektrycznych (uprawnienia budowlane, min. 5 lat doświadczenia na stanowisku kierownika budowy/robót elektrycznych, udział w realizacji 1 inwestycji obejmującej rozdzielnie SN/WN, stację elektroenergetyczną lub układ wyprowadzenia mocy), Kierownikiem Robót Sanitarnych (uprawnienia budowlane, min. 5 lat doświadczenia na stanowisku kierownika budowy/robót) oraz Specjalistą ds. Systemów Sterowania i Automatyki (SCADA/EAZ) (min. 5 lat doświadczenia, udział w uruchomieniu 1 obiektu współpracującego z OSP lub OSD, udział w realizacji 1 inwestycji obejmującej SCADA, EAZ, integrację z operatorem sieci).

      CompetitionOct 8, 2026
      Nov 3, 2026(24 days)
    • ENEA Operator Sp. z o.o.

      Elektrisk utstyr og belysning

      AFiR Stacja Paliw BP Kołbaskowo (A6), w tym budowa stacji 110/15 kV Kołbaskowo

      ENEA Operator sp. z o.o. potrzebuje zaprojektowania i wykonania robót budowlanych w zakresie budowy kompletnej stacji 110/15 kV Kołbaskowo (A6), w tym budowy stacji 110/15 kV Kołbaskowo, montażu dwóch transformatorów WN/SN, budowy powiązania kablowego 110 kV, budowy złącza ZKSN oraz budowy dwusekcyjnej rozdzielni SN 31-polowej z możliwością rozbudowy do 40 pól, a także budowy powiązań kablowych SN. Czas trwania umowy wynosi 24 miesiące. Usługi mają być świadczone w województwie zachodniopomorskim. Kryterium oceny ofert stanowi cena (100%). Wymagane jest ubezpieczenie od odpowiedzialności cywilnej na kwotę nie mniejszą niż 20 milionów złotych, zdolność kredytowa lub środki finansowe w wysokości co najmniej 20 milionów złotych oraz ocena scoringowa na poziomie nie niższym niż 3,75. Ponadto, wykonawca musi wykazać, że w ciągu ostatnich 5 lat zrealizował co najmniej 3 zamówienia równoważne o wartości co najmniej 12 milionów złotych każde, obejmujące projektowanie i budowę stacji elektroenergetycznej 110/SN lub o wyższym napięciu, oraz co najmniej 3 zamówienia równoważne o wartości co najmniej 1 miliona złotych każde, obejmujące projektowanie i budowę elektroenergetycznej linii kablowej 110 kV lub o wyższym napięciu. Wymagane jest również stosowanie rozwiązań organizacyjnych Systemu Zarządzania Bezpieczeństwem Informacji, opartych o system zarządzania według PN-EN ISO/IEC 27001.

      CompetitionOct 2, 2026
      Nov 9, 2026(30 days)
    • ENEA Operator Sp. z o.o.

      Elektrisk infrastruktur og veibelysning

      OD Gorzów: Budowa stacji GPZ 110/15 kV Mironicka z powiązaniami sieci SN i WN, S-2026-15350 (projekt + wykonawstwo)

      ENEA Operator sp. z o.o. potrzebuje zaprojektowania i wykonania robót budowlanych w zakresie budowy stacji 110/15kV Mironicka w Gorzowie, wraz z powiązaniami sieci SN i WN, w ramach projektu trwającego 98 tygodni. Zamówienie obejmuje opracowanie dokumentacji, niwelację terenu, budowę dwóch stanowisk transformatorów 110/15 kV, napowietrznej rozdzielni 110 kV, instalacji uziemienia i ochrony odgromowej, budynku stacyjnego z instalacjami wewnętrznymi, rozdzielni SN, rozdzielni potrzeb własnych, obwodów wtórnych, połączeń kablowych 15 kV, oświetlenia zewnętrznego, zewnętrznej instalacji wodno-kanalizacyjnej, dróg wewnętrznych, ogrodzenia, systemu telemechaniki, telekomunikacji oraz systemu ochrony technicznej SOT obiektu. Dodatkowo, zakres prac obejmuje dostosowanie istniejącego słupa 52/38, budowę nowych słupów linii 110 kV oraz wykonanie linii napowietrznej 110 kV do planowanego GPZ Mironicka, a także budowę linii kablowych 15kV. Kryterium oceny ofert stanowi cena (100%). Wymagane jest ubezpieczenie od odpowiedzialności cywilnej na kwotę co najmniej 10 000 000,00 zł, zdolność kredytowa lub środki finansowe w wysokości co najmniej 10 000 000,00 zł oraz ocena scoringowa na poziomie nie niższym niż 3,75. Wykonawca musi wykazać, że w ciągu ostatnich 5 lat zrealizował co najmniej 3 zamówienia równoważne o wartości co najmniej 10 000 000,00 zł brutto każde, obejmujące zarówno dokumentację projektową, jak i roboty budowlane stacji elektroenergetycznej 110/SN lub o wyższym napięciu, z elementami infrastruktury na poziomie napięcia 110 kV. Wymagane jest również stosowanie rozwiązań organizacyjnych Systemu Zarządzania Bezpieczeństwem Informacji, opartych o system zarządzania według PN-EN ISO/IEC 27001.

      CompetitionOct 7, 2026