  • Commission for Regulation of Utilities

    Bedriftsrådgivning

    The provision of Consultancy Services for Water Tariff and Connection Policy - Economic, Technical and Project Support [633]

    The Commission for Regulation of Utilities needs economic and technical consultancy services in Dublin to support the updating and implementation of Uisce Éireann’s Non-Domestic and Trade Effluent Tariff Framework and the review of its Connection Charging Policy. The contract covers two related work packages, with a mix of fixed-fee and drawdown deliverables, and runs for 2 years with options of 1+1 years. Its maximum total value is €730,000.

    CompetitionNov 16, 2026
    Dec 10, 2026(14 days)
    €730,000
  • Commission for Regulation of Utilities

    Arkiveringstjenester

    The Provision of Work Planning Software Application [642]

    The Commission for Regulation of Utilities needs a work-planning software application for 6 years, with a maximum total contract value of €210,000. The application will support the full planning cycle, from strategic priorities and objectives through annual work plans, output and status updates, quarterly progress reporting and performance monitoring. It is intended for the Senior Leadership Team, managers and teams, with approximately 100 users requiring editing rights. The services will be delivered in Dublin, and tenders will be assessed on quality (70%) and cost (30%).

    CompetitionNov 2, 2026
    Nov 30, 2026(4 days)
    €210,000
  • Commission for Regulation of Utilities

    Arkiveringstjenester

    Invitation to Tender (ITT) for the provision of an Integrated Board Governance and Risk Management Software Solution [641]

    The Commission for Regulation of Utilities needs an integrated, off-the-shelf software solution for Board Governance and Risk Management, to be delivered in Dublin, Ireland, over 72 months, with a maximum total value of 210,000 EUR. The solution should support approximately 100 users, with 40 for Board Governance and 60 for Risk Management, and the tenderer must act as the prime contractor responsible for all aspects of the solution. Award criteria are Quality (70%) and Cost (30%).

    CompetitionSep 17, 2026
    Oct 16, 2026(Expired)
    €210,000
  • Commission for Regulation of Utilities

    Elektrisk infrastruktur og veibelysning

    Request for Tenders for the Provision of a Capacity Auction Monitor. Joint request of the Commission for Regulation of Utilities (“CRU”) and The Utility Regulator (“UR”)

    The Commission for Regulation of Utilities has entered into an agreement with CEPA LLP for the provision of a Capacity Auction Monitor in Dublin, Ireland, for a duration of 48 months, with a final contract value of 883,000 EUR. The services relate to the all-island Single Electricity Market (SEM) and the Capacity Remuneration Mechanism (CRM), requiring the monitor to independently assure that System Operators correctly carry out their obligations under the Capacity Market Code (CMC). Quality was weighted at 70% and cost at 30% in the award criteria. Three bids were received for this contract.

    ResultSep 8, 2026€883,000
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    Framework Agreement for the Provision of Inspector Services [544A]

    The Commission for Regulation of Utilities has entered into a framework agreement with Egis Engineering Ireland Limited (formerly known as JB Barry and Partners Limited) for the provision of inspector services in Dublin, Ireland, for a duration of 4 years, with a maximum total value of 722,250 EUR. The services involve reviewing, chairing public inquiries (if required), preparing written reasoned reports, assessing relevant information, and making recommendations to the Commissioners on applications for special orders. The buyer sought an Inspector to work closely with a secretariat, which will provide administrative, logistical, technical, and environmental support. One bid was received for this contract.

    ResultAug 13, 2026€722,250
  • Commission for Regulation of Utilities

    Sikkerhetsrådgivning

    The Provision of Secretariat Services [544B]

    The Commission for Regulation of Utilities has entered into an agreement with KPMG_3970 for the provision of secretariat services in Dublin, Ireland, for a duration of 48 months, with a total maximum value of 1,830,680 EUR. The services involve providing all necessary administrative and processing tasks for the review of special order applications, including program management functions and support for the Inspector. The buyer required organizations with extensive knowledge and experience in administering complex projects, organizing public inquiries for major infrastructure projects (including Compulsory Purchase Orders), engaging with various stakeholders, and preparing clear and concise written reports. Experience in considering technical requirements, particularly related to electricity networks, was beneficial. Four bids were received for this contract.

    ResultAug 13, 2026€1,830,680
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    The Provision of Technical Consultancy Support to Support Operations of the Petroleum Safety Framework (PSF) [620]

    The Commission for Regulation of Utilities has entered into an agreement with DNV Services UK Limited Ireland branch and Moduspec Ltd for the provision of technical consultancy support to operations of the Petroleum Safety Framework (PSF) for a duration of 4 years, with a maximum total value of 1.8 million EUR. The services are divided into three lots: Multidisciplinary Services, Wells, and Drilling, requiring expertise in areas such as upstream oil and gas, pipelines, risk assessment, safety management systems, well engineering, well plugging and abandonment, offshore drilling, and rig cyber security. Six bids were received for this contract.

    ResultJul 7, 2026
    Jul 6, 2026(Expired)
    €1,800,000
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    The provision of Technical and Regulatory Consultancy Support for Gas Energy Safety

    The Commission for Regulation of Utilities (CRU) in Ireland needs technical and regulatory consultancy support for gas energy safety for a 4-year period, with a maximum total value of 2,400,000 EUR. The services are intended to support the efficient and effective functioning of the Gas Safety Framework (GSF), Safety Supervisory Body (SSB) Operations, and Policy and Promotion (P&P) teams within the CRU. This includes general technical assistance to enable the CRU to operate the gas safety regulatory framework and SSB operations effectively and efficiently.

    CompetitionJun 30, 2026
    Jul 31, 2026(Expired)
    €2,400,000
  • Commission for Regulation of Utilities

    Bedriftsrådgivning

    The Provision of Energy Expert Regulatory Support for Decarbonisation [619]

    The Commission for Regulation of Utilities in Ireland has entered into an agreement with Economic Consulting Associates Limited for the provision of energy expert regulatory support for decarbonisation. This service, primarily economic support with some technical aspects, will be delivered over 4 years for a maximum total value of 4,239,000 EUR. The Decarbonisation Division sought a single consultant to ensure a consistent and streamlined approach across various interconnected workstreams, including electricity interconnection, connections, offshore, and emerging regulatory frameworks. Seven bids were received for this contract.

    ResultJun 16, 2026
    Jun 15, 2026(Expired)
    €4,239,000
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-623 Mini-Competition for Provision of Consultancy Support for PR6 Operations

    The Commission for Regulation of Utilities has awarded a contract to CEPA LLP for the provision of consultancy support for PR6 Operations, with a final contract value of 1,936,000 EUR. The award was based on a 75% quality and 25% cost evaluation.

    ResultMay 28, 2026
    May 27, 2026(Expired)
    €1,936,000
  • Commission for Regulation of Utilities

    IT- drift og vedlikehold

    Pre-Qualification Questionnaire (PQQ) for the provision of a Licensing Solution [557]

    The Commission for Regulation of Utilities needs software-related services for a licensing solution over 6 years, with a maximum total value of 1,500,000 EUR. The project aims to optimize CRU’s licensing and consenting operations by developing a phased software solution for end-to-end management of licence and consent application processes, initially focusing on Electricity Generation licensing regimes, with future expansion to other licensing regimes.

    Competition with qualificationMay 22, 2026
    Jun 9, 2026(Expired)
    €1,500,000
  • Commission for Regulation of Utilities

    IT-drift og support

    Request for Tenders for the establishment of a Single Member Framework Agreement for the Provision of ICT Managed Services 2026-30 [609]

    The Commission for Regulation of Utilities has entered into a single member framework agreement with Qualcom for the provision of comprehensive ICT Managed Services in Ireland. The services include ICT Service Desk, Managed Security Operations Centre (SOC) as a Service, and optional dedicated support and ad-hoc professional service resources. The agreement has an initial duration of 2 years, with the possibility of two further 12-month extensions, for a total maximum duration of 4 years, and an estimated maximum total value of 3,000,000 EUR. The appointed service provider will manage the CRU’s ICT needs, covering infrastructure, cloud services, physical and virtual systems, and applications across Levels 1, 2, and 3. Five bids were received for this contract.

    ResultMay 18, 2026
    May 17, 2026(Expired)
    €3,000,000
  • Commission for Regulation of Utilities

    Juridiske tjenester

    The provision of Legal Services to SEMC [618]

    The Commission for Regulation of Utilities has entered into an agreement with Shepherd and Wedderburn LLP for the provision of legal services to the SEMC in Ireland and Northern Ireland. The contract has a duration of 4 years and an estimated maximum total value of 1,200,000 EUR. The services are crucial for ensuring that SEMC decisions adhere to statutory duties and principles of good regulation in both jurisdictions. The award criteria included cost (30%), quality of approach to service delivery (40%), and technical merit of proposed resources (30%). Only one bid was received.

    ResultMar 26, 2026
    Mar 25, 2026(Expired)
    €1,200,000
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-603 Consultancy Support for Gas Price Control 6 and related matters

    The Commission for Regulation of Utilities has entered into an agreement with CEPA LLP for the delivery of consultancy support for Gas Price Control 6 and related matters, with a total maximum value of 2,416,436 EUR. The award criteria included the quality of approach to service delivery, understanding of the brief, technical merits of the proposed resources, and cost, each weighted at 25%.

    ResultMar 2, 2026
    Mar 1, 2026(Expired)
    €2,416,436
  • Commission for Regulation of Utilities

    Bank- og finansformidlingstjenester

    AWARD 011-03-612 Provision of RESS Auction Monitor and Market Auditor Support

    The Commission for Regulation of Utilities has entered into an agreement with RSM Ireland Business Advisory for the provision of RESS Auction Monitor and Market Auditor Support services in Ireland, with a final contract value of 1,755,097 EUR. The award criteria included cost at 30%, service delivery methodology at 25%, understanding of the brief at 20%, technical merit of proposed resources at 20%, and proposals for environmentally sustainable and/or social considerations at 5%. One bid was received for this contract.

    ResultJan 29, 2026
    Jan 28, 2026(Expired)
    €1,750,000
  • Commission for Regulation of Utilities

    Reisebyrå- og turisttjenester

    AWARD 011-03-611 The Provision of Data Protection Officer Managed Services

    The Commission for Regulation of Utilities has entered into an agreement with Ambit Consultancy Services Ltd for the provision of Data Protection Officer Managed Services, with a maximum total contract value of 150,000 EUR. The award criteria included cost at 30%, quality of approach to service delivery including contract management at 15%, understanding of the brief at 25%, technical merits of the proposed resources at 25%, and proposals for reducing the environmental impact of service delivery at 5%. There were 13 bids received for this contract.

    ResultJan 22, 2026
    Jan 21, 2026(Expired)
    €150,000
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-576 Provision of Support for Electricity Network Tariff Structure Review Project: Re-start, Phase 1

    The Commission for Regulation of Utilities has entered into an agreement with NERA UK Limited for the provision of support for the Electricity Network Tariff Structure Review Project: Re-start, Phase 1, with a total value of 1,087,107 EUR. The award criteria included a fixed project fee at 23%, a fixed daily rate at 2%, quality of approach to service delivery at 25%, understanding of the brief at 25%, and technical merits of the proposed resources at 25%. Five bids were received for this contract.

    ResultJan 22, 2026
    Jan 21, 2026(Expired)
    €1,087,107
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-607 Support for the Establishment of a REMIT Investigative Group

    The Commission for Regulation of Utilities has entered into an agreement with NERA UK Limited for the delivery of services to support the establishment of a REMIT Investigative Group, with a total maximum value of 450,000 EUR. The award criteria included a fixed project fee at 15%, a fixed daily rate at 10%, quality of approach to service delivery at 20%, understanding of the brief at 20%, and technical merits of the proposed resources at 35%. Three bids were received for this contract.

    ResultJan 22, 2026
    Jan 21, 2026(Expired)
    €450,000
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-608 REMIT Formal Investigation Support

    The Commission for Regulation of Utilities has entered into an agreement with NERA UK Limited for the delivery of REMIT Formal Investigation Support services, with a final contract value of 440,000 €. The award was based on cost at 25%, quality of approach to service delivery at 20%, understanding of the brief at 20%, and technical merits of the proposed resources at 35%. Four bids were received for this contract.

    ResultJan 22, 2026
    Jan 21, 2026(Expired)
    €440,000
  • Commission for Regulation of Utilities

    Bank- og finansformidlingstjenester

    AWARD 011-3-610 The Provision of Internal Audit Services

    The Commission for Regulation of Utilities has entered into an agreement with Appold Ireland t/a Moore for the provision of internal audit services, with a total maximum value of 400,000 EUR. The award criteria included cost (30%), service delivery methodology (20%), understanding of the brief (20%), technical merit of proposed resources (25%), and proposals for incorporating environmentally sustainable and/or social considerations (5%). Two bids were received for this contract.

    ResultJan 9, 2026
    Jan 8, 2026(Expired)
    €400,000
  • Commission for Regulation of Utilities

    Juridiske tjenester

    AWARD 011-03-606 Legal Advice relating to Section 47 Special Order Applications to the CRU

    The Commission for Regulation of Utilities has entered into an agreement with McCann Fitzgerald LLP for the delivery of legal advice relating to Section 47 Special Order Applications to the CRU in Dublin, with a total value of 474,000 EUR. The award was based on a 60% weighting for the quality and relevance of expertise of the proposed team, 30% for the quality of approach and methodology for service delivery and contract management, and 10% for cost. Three bids were received for this contract.

    ResultDec 15, 2025
    Dec 14, 2025(Expired)
    €474,000
  • Commission for Regulation of Utilities

    Systemutvikling og programmering

    The provision of Human Resources Management Solution and associated services [588]

    The Commission for Regulation of Utilities has entered into an agreement with Strandum Ltd. for the provision of a secured cloud-based hosted HR management solution and associated services in Dublin, Ireland, for a duration of 7 years, with a total value of 372,400 EUR. The solution will comprise various modules/functional requirements, including migration from existing time management and other data systems, implementation and customisation, training, and ongoing support, with the potential to replace existing expenses management and payroll systems. The project aims to modernise and digitise human resources capabilities to improve efficiency, transparency, and employee experience across HR and Finance functions. Two bids were received for this contract.

    ResultDec 15, 2025
    Dec 14, 2025(Expired)
    €454,000
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-598 Consultancy Support for PSO Levy and Renewable Energy Support Scheme

    The Commission for Regulation of Utilities has entered into an agreement with Yellow Wood Energy Consulting for the delivery of consultancy support for PSO Levy and Renewable Energy Support Scheme services in Dublin, with a final contract value of 407,130 EUR. The award criteria included cost at 30%, quality of approach to service delivery at 10%, understanding of the brief at 30%, and technical merits of the proposed resources at 30%. Three bids were received for this contract.

    ResultSep 29, 2025
    Sep 28, 2025(Expired)
    €407,130
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-596 The Provision of the Expert Advisory Services Related to the Single Electricity Market

    The Commission for Regulation of Utilities has entered into an agreement with Yellow Wood Energy Consulting for the provision of expert advisory services related to the Single Electricity Market in Dublin, with a final contract value of 255,000 EUR. The award criteria included cost at 25%, quality of approach to service delivery at 20%, understanding of the brief at 25%, and technical merits of the proposed resources at 30%. Only one bid was received.

    ResultSep 29, 2025
    Sep 28, 2025(Expired)
    €255,000
  • Commission for Regulation of Utilities

    Forsikringstjenester

    Pension Scheme Administration, Actuarial and Consultancy Services

    The Commission for Regulation of Utilities has entered into an agreement with Willis Towers Watson_33828 for the delivery of Pension Scheme Administration, Actuarial and Consultancy Services in Dublin. The services include scheme administration and advice, support on actuarial matters, and investment consulting services, with a duration of 24 months and a total value of 761,500 EUR. Two bids were received for this contract.

    ResultSep 23, 2025
    Sep 22, 2025(Expired)
    €761,500
  • Commission for Regulation of Utilities

    Forskning og utviklingsarbeid innen samfunnsvitenskap og humanistiske fag

    AWARD 011-03-594 The Provision of Business Analysis Support to the CRU SSB Operations Team

    The Commission for Regulation of Utilities has entered into an agreement with BearingPoint Ireland Ltd for the provision of business analysis support to the CRU SSB Operations Team in Dublin, with a final contract value of 499,512 EUR. The award criteria included cost at 30%, approach and methodology to service delivery at 20%, quality, relevant experience and availability of resources of the proposed team at 25%, contract management at 20%, and sustainability: environmental and social considerations at 5%. Five bids were received for this contract.

    ResultSep 5, 2025
    Sep 4, 2025(Expired)
    €499,512
  • Commission for Regulation of Utilities

    Avfallshåndtering

    Provision of Environmental Consultancy Support

    The Commission for Regulation of Utilities has entered into an agreement with RPS Consulting Engineers Ltd. for the provision of environmental consultancy support in Dublin, Ireland, for a duration of 24 months, with a total value of 1,334,160 EUR. The award criteria included cost, quality of approach and methodology, understanding of the brief, quality and relevance of the proposed team's expertise, and proposals for decarbonisation of business operations. Nine bids were received for this contract.

    ResultSep 5, 2025
    Sep 4, 2025(Expired)
    €1,340,000
  • Commission for Regulation of Utilities

    Revisjon og økonomisk kontroll

    The Provision of Lot 1: Trading and Settlement Code Market Auditor and Lot 2: Capacity Market Auditor of the Single Electricity Market

    The Commission for Regulation of Utilities (“CRU”) and the Utility Regulator (“UR”) invite Tenders in response to this Request for Tenders (“RFT”). Lot Number 1: Trading and Settlement Code (TSC) Market Auditor In summary, the Services in Lot 1 relate to the all-island Single Electricity Market (“SEM”), specifically the SEM Trading and Settlement Code (“TSC”). The TSC is a multilateral contract which sets out the rules and procedures concerning the sale and purchase of wholesale electricity in Ireland and Northern Ireland. The TSC was designated by the CRU/UR and can be modified from time to time thereafter in accordance with the process set out in the TSC. The latest version of the TSC was published on the SEMO website on 8 November 20241. The Service for Lot 1 comprises providing the SEM with a Market Auditor. Lot Number 2: Capacity Market Auditor In summary, the Services in Lot 2 relate to the all-island Single Electricity Market (“SEM”) specifically the Capacity Remuneration Mechanism (“CRM”). The detailed rules and procedures associated with the Capacity Remuneration Mechanism are set out in the Capacity Market Code (SEM-17-033) published on 2 June 2017. An updated version of the Capacity Market Code was published on the SEMO website on 1 November 20242. The first capacity auction within the CRM was held in December 2017. The Services for Lot 2 comprise providing the SEM with a Capacity Market Auditor to conduct an audit of the Capacity Market Code (“CMC”) for a multiyear period.

    ResultJul 29, 2025
    Jul 28, 2025(Expired)
    €2,220,000
  • Commission for Regulation of Utilities

    Avfallshåndtering

    The Provision of Engineering Consultancy Support to CRU Lot 1: Gas Engineering Consultancy Services Lot 2: Electricity Engineering Consultancy Services

    In summary, the Services comprise Engineering Support to the Networks, Customer Policy and Protection and Security of Supply Divisions. This Competition is divided into 2 (two) Lots as described below: Lot 1: Gas engineering consultancy services Lot 2: Electricity engineering consultancy services. The awarded contract will be activity based / drawdown up to the maximum value in this Notice.

    ResultJul 25, 2025
    Jul 24, 2025(Expired)
    €3,500,000
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-596 The Provision of Expert Advisory Services Related to the Single Electricity Market

    AWARD 011-03-596 The Provision of Expert Advisory Services Related to the Single Electricity Market

    ResultJul 7, 2025
    Jul 6, 2025(Expired)
  • Commission for Regulation of Utilities

    Renholdstjenester, drift og vedlikehold

    AWARD 011-03-585 The Provision of Commercial Cleaning and Window Cleaning Services

    AWARD 011-03-585 The Provision of Commercial Cleaning and Window Cleaning Services

    ResultJul 7, 2025
    Jul 6, 2025(Expired)
  • Commission for Regulation of Utilities

    Laboratorietjenester

    Award 011-03-597 Provision of Support for SEMC Strategy

    Award 011-03-597 Provision of Support for SEMC Strategy

    ResultJul 7, 2025
    Jul 6, 2025(Expired)
  • Commission for Regulation of Utilities

    Regnskaps- og rådgivningstjenester

    Invitation to Tender (ITT) for the Provision of Establishment of a Supervisory Framework for Guarantees of Origin for Renewable Gas

    The services required in this contract are associated with the provision of support to complete the work associated with the establishment of a supervisory framework for guarantees of origin for renewable gas, related works associated with the development of a renewable gas fuel mix disclosure (FMD) and carbon dioxide (CO2) emissions requirement for gas suppliers and, potentially, a Green Source Product Verification (GSPV) process.

    ResultJul 7, 2025
    Jul 6, 2025(Expired)
  • Commission for Regulation of Utilities

    PR og kommunikasjon

    AWARD 011-03-587 The Provision of Strategic Communications and Public Relations Support

    AWARD 011-03-587 The Provision of Strategic Communications and Public Relations Support

    ResultMay 29, 2025
    May 28, 2025(Expired)
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-586 The Provision of Consultancy Services for System Services Future Arrangements

    AWARD 011-03-586 The Provision of Consultancy Services for System Services Future Arrangements

    ResultMay 29, 2025
    May 28, 2025(Expired)
  • Commission for Regulation of Utilities

    Juridiske tjenester

    AWARD 011-03-583 Legal Advice for the Regulation of Offshore Economic Policy and Monitoring & Delivery

    AWARD 011-03-583 Legal Advice for the Regulation of Offshore Economic Policy and Monitoring & Delivery

    ResultMay 29, 2025
    May 28, 2025(Expired)
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    AWARD 011-03-581 Provision of Financial and Economic Consultancy for SSB (Safety Supervisory Bodies) Operations

    AWARD 011-03-581 Provision of Financial and Economic Consultancy for SSB (Safety Supervisory Bodies) Operations

    ResultMay 29, 2025
    May 28, 2025(Expired)
  • Commission for Regulation of Utilities

    Bedriftsrådgivning

    Provision of Economic and Technical Consultancy Support for Electricity Networks Price Review 6 (PR6)

    The Commission for Regulation of Utilities (“CRU”) is Ireland’s independent energy and water regulator. Our work impacts Irish homes and businesses ensuring safe, secure and sustainable energy and water supplies for all customers. The CRU’s mission is to protect the public interest in Water, Energy and Energy Safety. The CRU is guided by four strategic priorities that sit alongside the core activities we undertake to deliver on the public interest. These are: • Ensure security of supply • Drive a low carbon future • Empower and protect customers • Enable our people and organisational capacity The Commission for Regulation of Utilities (CRU) is responsible for licensing and regulating the electricity networks companies under the Electricity Regulation Act, as amended, 1999 (“the Act”). The CRU is required under Section 35 of the Act to review and approve charges for the use of the transmission and distribution system, including costs directly or indirectly occurred by the companies in carrying out their statutory duties and the appropriate reasonable rate of return on the capital employed by the companies. The CRU has responsibility for the economic regulation of the electricity sector, including setting the amount of revenue that the Transmission System Operator (TSO), Transmission Asset Owner (TAO) and Distribution System Operator (DSO) can earn through imposing tariffs on their customers. The revenues allowed to the TSO, TAO and DSO must be sufficient to maintain and develop the network, while delivering on the plans to achieve national and European policy for 2030, and protecting the interests of consumers. The national policy recognises the need to facilitate a large-scale deployment of renewables that will be critical to decarbonising the power sector as well as enabling the electrification of other technologies. This project comes at an important time for the development of the electricity networks in Ireland, with the changing operation of the system (more distributed generation), the renewable electricity targets set out in the Renewable Electricity Directive and security of supply issues. While the CRU aims to set a fit for purpose Price Review, we will also seek to ensure that: 1. there is a systematic focus on increasing efficiency in the operation of the network companies while continuing to meet the needs of the network and protecting the long and short-term customer interest; 2. the Price Review 6 facilitates Ireland’s transition to a low carbon energy future as Ireland aims to meet the 2030 renewable energy targets; 3. PR6 considers how best to integrate the Offshore Regulatory Framework determination to accelerate the delivery of at least 5 GW of offshore wind by 2030; and 4. PR6 facilitates the accelerated delivery of grid reinforcement and interconnection, which will reduce the level of constraints on the transmission and distribution systems, a measure which will enhance security of supply, promote decarbonisation and reduce constraint payments to generators.

    ResultApr 17, 2025
    Apr 16, 2025(Expired)
  • Commission for Regulation of Utilities

    Byggeteknisk konsulentvirksomhet

    Provision of Engineering Consultancy Support to CRU. Lot 1: Gas Engineering Consultancy Services Lot 2: Electricity Engineering Consultancy Services

    This Competition is divided into 2 (two) Lots as described below: Lot 1: Gas engineering consultancy services Lot 2: Electricity engineering consultancy services

    ResultApr 7, 2025
    Apr 6, 2025(Expired)
  • Commission for Regulation of Utilities

    Elektrisitetshandel og vannkraftproduksjon

    Provision of Access to a Platform providing Energy Related Data and Information

    The Commission for Regulation of Utilities (“CRU”) is Ireland’s independent energy and water regulator. Our work impacts Irish homes and businesses ensuring safe, secure and sustainable energy and water supplies for all customers. The Market Modelling Group (MMG) is part of the Security of Supply and Wholesale Division. The MMG carries out many integral functions, including but not limited to, the Public Service Obligation (PSO) Levy, Imperfections Charges, and Directed Contracts. Energy data and information is an integral component to a number of critical CRU business functions and the MMG relies on the data and information in several workstreams including for the calculation of Directed Contracts (DCs), Imperfection Charges and the PSO Benchmark Price. The MMG also carries out various policy analysis and additional ad-hoc modelling exercises using the data and information retrieved from an energy platform. The MMG requires access to a platform with energy data and information for use in various SEM modelling, research, and analysis workstreams. Please refer to the attached CFT documents for detailed specification of requirements.

    ResultMar 24, 2025
    Mar 23, 2025(Expired)
    €160,000
  • Commission for Regulation of Utilities

    Rekruttering og bemanning

    Provision of Customer Contact Managed Services

    The Commission for Regulation of Utilities (“CRU”) is Ireland’s independent energy, district heating and water regulator. Our work impacts Irish homes and businesses ensuring safe, secure and sustainable energy and water supplies for all customers. The CRU’s mission is to protect the public interest in water, energy and energy safety. The CRU is guided by four strategic priorities that sit alongside the core activities we undertake to deliver on the public interest. These are: • Ensure security of supply • Drive a low carbon future • Empower and protect customers • Enable our people and organisational capacity Under the European Communities (Internal Market in Electricity and Gas) (Consumer Protection) Regulations 2011 (SI 463 of 2011, as amended) and the Water Services Act 2014 (as amended), the CRU has a statutory duty to provide: • A single point of contact for all energy and water related customer queries/information requests, particularly to provide information on consumer rights and obligations, and • A free dispute resolution service for any customer with an unresolved complaint against an energy supplier, energy network operator or Uisce Éireann. The CRU’s Customer Care Team (“CCT”), in the Customer Policy and Protection and Legal division, is the team that fulfils this role and assists household and small business customers who have questions or complaints in relation to energy or water utilities in a helpful and accurate manner. In providing information and dispute resolution services to customers, the CCT is currently supported by an external contact centre provider (and has been for the last 13 years). Services currently provided are outlined below. Similar services are sought from a suitably qualified organisation for the next two years, with the option to extend by two further two-year periods, i.e. a possible total of six years. The successful tenderer will be the first point of contact for all customers seeking to avail of the information or dispute resolution services provided by the CCT. By way of context, volumes and complexity of queries and complaints handled by the CRU have increased notably over the last four years. Contact volumes are currently slightly below 2021-22 peaks, while complaint volumes continue to increase year-on-year. In 2023, the CRU’s customer care line received 6,816 inbound calls and 22,526 emails (including online web queries). 617 complex complaints (complaints that are investigated by the CRU) were opened. The CCT’s 2023 annual report (linked in previous section) will provide more information on the nature of queries and complaints received. Future contact volumes are uncertain, however we would note a trend in the subject matter areas covered by contacts becoming more complex, for example in relation to microgeneration support schemes and more complex smart tariff products being offered by energy suppliers. It is important that agents representing the CRU can understand a wide range of complex areas, and question customers effectively such that they can advise customers clearly and accurately on their rights in relation to energy, water and other areas that come into the CRU’s remit (such as district heating). Summary of services required: Provision of information service Provision of dispute resolution service Training agents, including developing new training materials Reporting Quality assurance Reception line

    ResultDec 6, 2024
    Dec 5, 2024(Expired)
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    Provision of an Offshore Technical Advisory Team

    The Commission for Regulation of Utilities (“CRU”) is Ireland’s independent energy and water regulator. Our work impacts Irish homes and businesses ensuring safe, secure and sustainable energy and water supplies for all customers. The CRU’s mission is to protect the public interest in Water, Energy and Energy Safety. The CRU is guided by four strategic priorities that sit alongside the core activities we undertake to deliver on the public interest. These are: - Ensure security of supply - Drive a low carbon future - Empower and protect customers - Enable our people and organisational capacity The technical services required relate specifically to the offshore wind team in the CRU. The offshore wind team sits within the Decarbonisation division in the CRU. Offshore wind is a new, complex, and multi-faceted area of policy for the CRU driven by the national policy statements on offshore grid development. Government Policy Statements have established a new Offshore Transmission Asset Owner (EirGrid) as well as detailing how offshore wind generation projects will be connected to the grid in two distinct policy phases over the next decade, moving from decentralised to centralised grid development (i.e., from developer to TAO/TSO planned). The latest Policy Statement (“Future Framework” – post 2030) continues the theme of a centralised plan led model and introduces new Designated Maritime Area Plans (DMAPs). The very large scale and technical complexity of the planning, development, construction and operation of the new offshore grid (and associated deep reinforcements of the onshore grid) will result in significant challenges to ensure efficiency of cost for offshore wind generation projects bidding into support auctions (based on EirGrid standards and technical specifications). The CRU therefore requires significant internationally experienced offshore technical assistance in this new area for Ireland to ultimately ensure the best outcomes for the electricity consumer and the ability for Ireland to meet its climate action goals. The CRU offshore team is seeking an expert Offshore technical advisory team to support the offshore team on two key activities over the coming years: - 2030 Readiness – Offshore Technical Advisory team to support and monitor progress of delivery of Phase 1 offshore wind projects. - Operational matters – ongoing operational offshore technical advice. See Associated Documents for further information relating to this competition CFT 3771500. Note to EO's - The CRU recommends that all interested EOs associate with this CFT to ensure they received updates and notifications when issued. Additionally, we recommend that EOs Zip files on submission to ensure the naming convention does not alter.

    ResultOct 21, 2024
    Oct 20, 2024(Expired)
    €1,600,320
  • Commission for Regulation of Utilities

    Rådgivende ingeniørtjenester for bygg og anlegg

    Multi Supplier Framework Agreement for the Provision of Specialised Economic, Financial and Related Expert Consultancy Services

    The Commission for Regulation of Utilities (CRU) is Ireland’s independent energy and water regulator. CRU are responsible for: Regulation of Energy and Water for a Changing Climate: Regulation of energy and water underpins Irish economic competitiveness, investment and growth, while also contributing to our international obligations to address climate change. The CRU’s role in energy is to maintain security of supply, ensure efficient network delivery and promote competition and innovation in the generation and supply of electricity and supply of natural gas. As part of this role, the CRU jointly regulates the all-island wholesale Single Electricity Market with its counterpart in Northern Ireland, the Utility Regulator. As economic regulator for public water and wastewater services, the CRU sets targets and monitors the performance of Uisce Éireann in delivering services and investment in infrastructure in a cost-efficient manner. Protecting Energy and Water Customers: The CRU works to protect energy and water customers, especially the vulnerable. Setting the quality of service standards in energy and water while enabling competition and innovation ensures customers are treated fairly and are at the heart of the transition to a low carbon future. We provide customers with information about their rights and also offer a dispute resolution service to deal with issues that customers have not been able to resolve with their energy company or Uisce Éireann. The CRU also promotes customer protection and engagement through targeted communications campaigns which inform customers on how to get the best value and service from utility companies and participate actively in decarbonisation and water conservation. Energy Safety Regulation: The CRU has a key role in protecting public safety and the prevention of major accidents in Ireland’s energy sector. This includes safety regulation of gas (networks, supply, storage, use and liquefied petroleum gas distribution), petroleum (upstream (onshore and offshore) exploration and production of hydrocarbons) and gas installers and electrical contractors. Our public safety remit also includes ensuring electrical contractors and gas installers operate to relevant national standards to protect life and property as well as promoting customer awareness of safety. Further information on the CRU’s role and relevant legislation can be found on the CRU’s website at what we do | CRU.ie Please see associated documents for further information relating to this competition CFT 2891959.

    ResultApr 30, 2024
    Apr 29, 2024(Expired)
    €40,000,000
  • Commission for Regulation of Utilities

    Systemutvikling og programmering

    Provision of an Online Consultation Platform Application

    The Commission for Regulation of Utilities (CRU) is Ireland’s independent energy and water regulator. The CRU has a wide range of economic, customer protection and safety responsibilities in energy and water. The CRU’s mission is to protect the public interest in Water, Energy and Energy Safety. The work of the CRU impacts every Irish home and business, by ensuring safe, secure and sustainable energy and water supplies at a reasonable cost. CRU is seeking a provider of an online consultation platform with proven experience of customising and integrating that platform for clients, to provide consultation, licensing, setup, configuration, and integration of the platform. In consultations, we typically ask specific questions about our intended course of action. Consultations are open for a set period of time and move through a series of stages: upcoming, open, closed (awaiting decision) and closed (with decision). Occasionally, we may also use surveys to gather information. On submission of responses, CRU teams prepare reports summarising submissions to inform Commission decisions. The new consultation platform is expected to improve respondents' user experiences while also making it easier for CRU professionals to publish, assess, and report on consultation contributions. The CRU will look to providers who have proven in-house capacity to provide the technical expertise and support.

    ResultMar 28, 2024
    Mar 27, 2024(Expired)
    €0
  • Commission for Regulation of Utilities

    Bedriftsrådgivning

    Provision of Consultancy Support to the CRU’s Customer Care Team (CCT) Dispute Resolution Function

    The Commission for Regulation of Utilities (CRU) is Ireland’s independent energy and water regulator. The CRU has a wide range of economic, customer protection and safety responsibilities in energy and water. The CRU’s mission is to protect the public interest in Water, Energy and Energy Safety. The work of the CRU impacts every Irish home and business, by ensuring safe, secure and sustainable energy and water supplies at a reasonable cost. The Customer Care Team (CCT) sits in the Customer Policy and Protection and Legal division of the CRU. The team is responsible for delivering two key statutory functions for the CRU - Providing the Commission’s dispute resolution service for unresolved disputes between final customers and service providers. This obligation is set out in Section 7 of S.I. No. 463 of 2011 and Section 8 of the Water Services Act 2014. - Acting as a single point of contact to provide final customers with necessary information concerning their statutory rights in relation to engaging with energy undertakings and obligations of said undertakings, among other things. This obligation is set out in full in Section 8 of S.I. No. 463 of 2011. Services are sought primarily in relation to the CCT’s dispute resolution function. Over the last year the CCT has experienced a substantial increase in the volume of complaint cases received from customers. This is driven by a range of factors including high energy prices, energy market developments (such as the emergency electricity credit and new support for microgeneration), increased customer awareness of the CRU and its dispute resolution service, and the increasing remit of the CRU).

    ResultMar 26, 2024
    Mar 25, 2024(Expired)
    €212,000
  • Commission for Regulation of Utilities

    Forskning og utdanning

    Provision of Soft Skills Training Courses

    The CRU (Commission for Regulation of Utilities) wish to procure suitable learning and development service providers to provide training courses (primarily soft skills training), to build on and expand the existing skill set of current and future CRU staff. The CRU currently employs circa 130 staff, with plans to recruit approximately 70 more staff over the next two years. The CRU operates a hybrid working model which aims to create a work environment that is purposeful, flexible, digital and one that will fully deliver on all its mandates. CRU is inviting tenders to provide a range of soft skills training courses through a combination of traditional classroom and virtual settings. Services are split into individual Lots and include the following areas: • Lot 1 – Information Technology – Microsoft Suite, • Lot 2 – Communication and Personal Effectiveness, • Lot 3 – Professional Development

    ResultFeb 15, 2024
    Feb 14, 2024(Expired)
    €260,000