Search
  • Search


Ireland: Tenders/Gas Networks Ireland/24/033 - Qualification System for the provision of Engineering, Procurement and Construction Services for South West Scotland Onshore System (SWSOS)
  1. Competition notice published

    Nov 19, 2025 10:37 AMNovember 19, 2025 10:37 AM
  2. Tender submission deadline

    Comes with the invitation
  3. Contract start date

    Nov 20, 2025 12:00 AMNovember 20, 2025 12:00 AM
  4. Questions deadline

    Nov 11, 2035 11:00 PMNovember 11, 2035 11:00 PM
  5. Contract end date

    Nov 20, 2035 12:00 AMNovember 20, 2035 12:00 AM
  6. Qualification deadline

    Nov 20, 2035 12:00 PMNovember 20, 2035 12:00 PM

Brief

24/033 - Qualification System for the provision of Engineering, Procurement and Construction Services for South West Scotland Onshore System (SWSOS)

Qualification deadline
Nov 20, 2035Questions by Nov 11, 2035
Procedure
With negotiationTwo stages
Agreement
Construction workuntil Nov 2035

Brief

Gas Networks Ireland needs Engineering, Procurement, and Construction Services (EPCS) for the South West Scotland Onshore System (SWSOS) Decarbonisation Programme. This involves the design, procurement, construction, and integration of new electric drive compressor halls at operational sites in Scotland. The scope includes detailed design procurement, materials procurement (mechanical, electrical, instrumentation), construction activities (civil works, pipework, cabling), integration and system tie-ins with existing gas turbines, security and cybersecurity installations, and full testing and commissioning. The project aims to upgrade critical infrastructure to achieve Net Zero by 2050. Award criteria will be based on Price and Quality.

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    MEAT (Price & Quality)

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    MEAT (Price & Quality)

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Gas Networks Ireland

From the notice

  • GNI and GNI (UK) are seeking experienced EPCS contractors to deliver a series of critical infrastructure upgrades as part of the SWSOS Decarbonisation Programme, a cornerstone of our commitment to achieving Net Zero by 2050. This tender covers multiple work packages, including the design, procurement, construction, and integration of new electric drive compressor halls across operational sites in Scotland. The successful contractor will manage complex interfaces between new and existing assets, ensuring seamless integration of mechanical, electrical, and control systems, while adhering to stringent cybersecurity and safety standards. This initiative represents a strategic investment in sustainable energy infrastructure and offers an opportunity to collaborate on projects of significant scale and impact within a multinational framework. SCOPE OF REQUIREMENTS: The scope of this tender encompasses overall project management and delivery across multiple work packages, including but not limited to the following: Detailed Design Procurement Procurement of detailed design for new compressor halls, based on the GNI suite of functional specifications. Materials Procurement Mechanical materials: high-pressure pipework, valves, and fittings. Electrical materials: interconnecting cabling and junction boxes. Instrumentation materials: transmitters and data cabling. Note: The second-stage tender process (CFC) will confirm the final requirements and clarify the full scope boundaries for the electric motor drive (EMD) package and the contractor’s scope. Construction Activities Construction of new compressor halls. Completion of all civil works, including excavations, foundations, structural steel, compressor foundations, and ancillary electrical buildings. Installation of interconnecting pipework, electrical and control cabling, and junction boxes. Integration and System Tie-ins Integration of new electric drive compressors into the existing fleet of gas turbines. Mechanical, electrical, and control system tie-ins at operational compressor stations across GNI UK sites in Scotland. Security and Cybersecurity Installation of security systems and implementation of cybersecurity controls in line with GNI specifications. Testing and Commissioning Full responsibility for FAT and SAT activities. Commissioning and start-up of all new systems. Additional Scope Notes: GNI may procure electric motor drive (EMD) packages separately. GNI will manage all permitting and planning permissions. GNI will separately upgrade incoming site electrical supply to power the new EMD packages. Indicative EPCS Scope Boundary: The EPCS scope is envisaged to cover all elements required for the delivery of an electric drive compressor station as outlined above. A more detailed scope is provided within the Appendices of the Qualification System Questionnaire documents

  • Contact

    Tenders@gasnetworks.ie
  • Type
    Competition · Prequalification
  • Main code
    Construction work for gas pipelines
    45231220

Similar active competitions

  • Gas Networks Ireland

    Rådgivende ingeniørtjenester for bygg og anlegg

    26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve

    Gas Networks Ireland needs Engineering, Procurement, Construction (EPC) works and services (Lot 1) and Operation and Maintenance (O&M) services (Lot 2) for the Strategic Gas Emergency Reserve (SGER). Lot 1 involves engineering, procurement, and construction of infrastructure assets including the jetty, trestle, topside structures, pipelines, above ground installation (AGI), integration with FSRU, onshore terminal systems, and related utilities. Lot 2 covers operation and maintenance services for these assets. The Lot 2 contractor will be novated to the Lot 1 contractor for the EPC, commissioning, and defects correction periods, followed by an initial three-year O&M period and a further O&M period of up to five years. Applicants can apply for one or both lots.

    Qualification system
    Jul 25, 2036(100+ days)
  • Gas Networks Ireland

    Bedriftsrådgivning

    26/027 - Professional Services Qualification System for the Strategic Gas Emergency Reserve

    Gas Networks Ireland needs professional advisory and support services to assist in delivering the Strategic Gas Emergency Reserve (SGER) for a duration of 180 days. The services are divided into seven lots: Commercial advisory for LNG procurement and contract management, Commercial operations and regulation advisory, Marine advisory, Project and programme management advisory, Financial advisory, Insurance advisory, and Specialist advisory. Applicants may apply for qualification in one or more lots. The award criteria will be based on Most Economically Advantageous Tender (MEAT), considering both price and quality.

    Qualification system
    May 5, 2036(100+ days)
  • Gas Networks Ireland

    Rådgivende ingeniørtjenester for bygg og anlegg

    24/026 - Front-end Engineering Design (FEED), Client Partner, and Engineering Peer Review and Specialist Technical Advisor for Strategic Gas Emergency Reserve Qualification System Questionnaire

    Gas Networks Ireland is establishing a Qualification System for the provision of engineering services for a Strategic Gas Emergency Reserve (SGER). The Project is the delivery of the optimum solution for the SGER. Applicants can apply for qualification for the following lots: Lot 1 - Front-end Engineering Design (FEED); Lot 2 - Client Partner; and Lot 3 - Engineering Peer Review and Specialist Technical Advisor. Applicants may apply for qualification in one or more lots but an Applicant can only be awarded one lot.

    Qualification system
    Jan 10, 2028(100+ days)