410119 Consultancy assistance regarding feasibility study of CCUS
Awarded
The competition has ended and a winner has been selected.
- Qualification deadline
- Aug 24, 2023Expired
- Award
- Price 30% and 2 more
Brief
The objective of this study is the technical and economic feasibility of a carbon capture facility for the waste CHP plant owned and operated by Fjernvarme Fyn Affald A/S (FFA). FFA receives approximately 280.000 t/year of mixed waste and consequently the captured CO2 will be a mix of fossil and biogenic CO2. The major part of the biogenic CO2 is assumed to be utilized by Fortum for methanol production to the extent that this is feasible (to be investigated by Fortum in separate study) whereas not utlised CO2 shall be stored permanently. For further information please see the Tender Conditions and the Scope of feasibility study.
Byggeteknisk konsulentvirksomhet
Result
- COWI A/SWinner
- 3Number of bids
- Not statedContract value
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Award Criteria
Description
CV's
Source
No source found in the documents. Check the weight against the tender documents.
Source
No source found in the documents. Check the weight against the tender documents.
Description
Project organization
Source
No source found in the documents. Check the weight against the tender documents.
Description
Risk analysis and durabiltiy of the project
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Fjernvarme Fyn Service A/S
From the notice
The objective of this study is the technical and economic feasibility of a carbon capture facility for the waste CHP plant owned and operated by Fjernvarme Fyn Affald A/S (FFA). FFA receives approximately 280.000 t/year of mixed waste and consequently the captured CO2 will be a mix of fossil and biogenic CO2. The major part of the biogenic CO2 is assumed to be utilized by Fortum for methanol production to the extent that this is feasible (to be investigated by Fortum in separate study) whereas not utlised CO2 shall be stored permanently. For further information please see the Tender Conditions and the Scope of feasibility study.
Contact
Jette Køhlerjette.koehler@outlook.dk- Result · PrequalificationType
- 71318000Main codeAdvisory and consultative engineering services