Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
Rådgivende ingeniører VVA
Serbian Railway Infrastructure JSC needs Engineer/Supervision services for the design and build works contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project, for a duration of 72 months. The services include supervision of the design for the building permit, construction design, as-built design, and the works under the Works Contracts for Section 3, which are implemented through two Design and Build Works Contracts covering Subsections 3.1, 3.3, 3.4, and 3.2. The installation of ERTMS is excluded from this contract. The contract will be awarded based on the most economically advantageous tender, with a quality-to-price ratio of 80:20.
Om anbudet
- Kontakt navn
- Janko Kovljanic
- Kontakt telefon
- +381 66 8404234
- Kontakt e-post
- investicije.projekatbn@srbrail.rs
- Adresse
- Nemanjina 6, 11000 Belgrade
The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract.Hovedtrekkene i prosedyrenrestricted procedures (two stages)
Egne vurderingskriterier
Start gratis prøveperiode for å stille egne spørsmål om anbudet og få KI-genererte svar.
Tildelingskriterier
Beskrivelse
The Contract will be awarded on the basis of the most economically advantageous tender, using a quality-to-price ratio of 80:20. The detailed award criteria and evaluation methodology are set out in the procurement documents
Beskrivelse
The Contract will be awarded on the basis of the most economically advantageous tender, using a quality-to-price ratio of 80:20. The detailed award criteria and evaluation methodology are set out in the procurement documents
Kvalifikasjonskrav
Fant ingen kvalifikasjonskrav i konkurransekunngjøringen.
Tidligere kontraktsvinnere
Start gratis prøveperiode for å se hvem som har vunnet lignende anbud hos denne oppdragsgiveren.
Se hele utlysningen
- Innkjøper
- Serbian Railway Infrastructure JSC
- Tittel
- Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project
- Type
- Hovedkode
- Tilleggskoder
- Varighet
- 72 måneder
Ingen tilleggskoder fra innkjøper …
Tilleggskoder lagt til av Cobrief