Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
Grunnarbeid og anleggsvirksomhet
„Serbian Railway Infrastructure JSC“ traži izvođenje radova na deonicama Paraćin–Stalać (20,8 km), Đunis–Trupale (37,7 km) i Trupale–Medjurovo (6,7 km) u okviru projekta modernizacije železničke pruge Beograd–Niš, sa trajanjem ugovora od 48 meseci. Radovi obuhvataju rekonstrukciju i modernizaciju deset stanica za putnički i teretni saobraćaj, sa projektovanom brzinom od 200 km/h na deonicama 3.1 i 3.3, kao i rekonstrukciju postojeće i izgradnju nove kontaktne mreže i elektroenergetskih instalacija. Ponude će biti ocenjivane na osnovu ekonomski najpovoljnije ponude, sa odnosom kvaliteta i cene 60:40.
About the bid
- Contact name
- Janko Kovljanic
- Contact phone
- +381 66 8404234
- Contact email
- Investicije.projekatbn@srbrail.rs
- Address
- Nemanjina 6, 11000 Belgrade
The Works Contract covers Section 3 of the Belgrade–Niš Modernisation Project, which is divided into four subsections, (subsection 3.2 Stalać – Đunis is already contracted). The works relate to Subsections 3.1 Paraćin–Stalać, 3.3 Đunis–Trupale and 3.4 Trupale–Medjurovo. Subsection Paraćin–Stalać is 20.8 km long, while Subsection Đunis–Trupale is 37.7 km long and Subsection Trupale – Medjurovo is 6.7 km long. A total of ten stations will be reconstructed and modernised to meet the demands of both passenger and freight traffic. The design speed is 200 km/h for Subsection 3.1 and 200 km/h for Subsection 3.3. On the Subsection Trupale–Medjurovo the works include reconstruction of the existing railway line with construction of passenger platforms and underpass at station Nis Ranzirna. Across all Subsections 3.1, 3.3 and 3.4, works include reconstruction of the existing and construction of new overhead contact line (OCL) systems, as well as electrical power installations in stations, tunnels and tunnel entrances, energy facilities, relay stations, sectioning posts (including those with neutral sections), remote control systems for electric traction installations, transformer stations supplied from OCL, and lighting of grade-separated crossings and access roads. During the execution of signalling works in stations, automatic switching of turnouts and train routes will not be possible. Due to the shutdown of station signalling systems, operations will be adapted to a temporary mode. Inter-signal interlocking devices (UMZ) will be used, installed in temporary rooms for train dispatchers, with traffic managed within station areas. Some limited works on neighbouring sections may be included in the scope of the contract.Main features of the procedureA competitive procedure with negotiation as defined in the EIB Guide to Procurement and procurement documents.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Description
The contract will be awarded on the basis of the most economically advantageous tender, using a quality to price ratio 60:40. The detailed award criteria and evaluation methodology will be set out in the procurement document.
Description
The contract will be awarded on the basis of the most economically advantageous tender, using a quality to price ratio 60:40. The detailed award criteria and evaluation methodology will be set out in the procurement document.
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Serbian Railway Infrastructure JSC
- Title
- Works contracts – Section 3 Paraćin – Trupale – Medjurovo (design and build) for Railway Line under the Belgrade – Niš Railway Modernisation Project
- Type
- Main code
- Supplemental codes
- Duration
- 48 months
No supplemental codes from buyer…