    1. Contract start date

      Feb 15, 12:00 AMFebruary 15, 2026 12:00 AM
    2. Contract signed

      Feb 15, 12:00 AMFebruary 15, 2026 12:00 AM
    3. Result notice published

      Mar 11, 10:00 PMMarch 11, 2026 10:00 PM
    4. Contract end date

      Dec 31, 2029 12:00 AMDecember 31, 2029 12:00 AM

    Brief

    Belgium: Tenders/Elia Asset/70/110kV SF6-free Gas Insulated Switchgears (GIS) – wave 1

    Awarded

    The competition has ended and a winner has been selected.

    Qualification deadline
    Mar 11,Expired
    Procedure
    With negotiationTwo stages
    Agreement
    Buying goodsover 4 years

    Brief

    Elia Asset heeft een overeenkomst gesloten met Siemens Energy Global GmbH & Co. KG en Siemens Energy NV/SA voor het ontwerp, de fabricage, levering, installatie en inbedrijfstelling van 70/110kV SF6-vrije gasgeïsoleerde schakelinstallaties (GIS) inclusief alle benodigde accessoires en diensten. De levering is bestemd voor Belgische en/of Duitse onshore onderstations, met een looptijd van 4 jaar. Lot 1 omvat 70/110kV SF6-vrije GIS voor 5 onshore projecten voor ETB (Elia Transmission Belgium) plus maximaal 3 optionele projecten, en Lot 2 omvat 110kV SF6-vrije GIS voor één 50Hertz Transmission Germany project.

    Elektrisk utstyr og belysning

    Result

    TED
    • Siemens Energy Global GmbH & Co. KG
      Winner
    • Siemens Energy NV/SA
      Winner
    • Number of bids
      0
    • Contract value
      €0

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Elia Asset

    From the notice

    • Design, manufacturing, factory testing, supply, delivery, unloading, installation, on-site testing and commissioning of 70/110kV SF6-free Gas Insulated Switchgears (GIS) including all necessary/related accessories and/or services for Belgian and/or German onshore substations based on Qualification System for SF6 free Gas Insulated Switchgears (GIS) above Ur 52kV with a Global Warming Potential (GWP) <1.000 - Contract Notice No. 562892-2024. Lot 1: 70/110kV SF6-free GIS for 5 onshore projects for ETB (Elia Transmission Belgium) plus up to 3 optional projects. Lot 2: 110kV SF6-free GIS for one 50Hertz Transmission Germany

    • Contact

      wrong.email@email.be
    • Type
      Result · Prequalification
    • Main code
      Switchgear
      31214000

    Similar active competitions

    • 50Hertz Transmission GmbH

      Elektrisk utstyr og belysning

      Qualification System for SF6 free Gas Insulated Switchgears (GIS) above Ur 52kV with a Global Warming Potential (GWP) <1.000

      Design, manufacturing, factory testing, supply, delivery, unloading, installation, on-site testing and commissioning as well as optionally the service and maintenance of Gas Insulated Switchgears (GIS) with (1) a Global Warming Potential (GWP) < 1 or with insulation gases not containing fluorinated greenhouse gases (Category (1)) (2) with insulation gases containing fluorinated greenhouse gases with a Global Warming Potential (GWP) ≥ 1 and < 1.000 (Category (2)) referred to in the EU Regulation on fluorinated greenhouse gases (Regulation (EU) 2024/573) including all necessary/related accessories for Rated Voltage Levels (Ur) above 52kV

      Qualification system
      Oct 15, 2027(100+ days)
    • Elia Transmission Belgium

      Qualification System for Civil works in Elia High Voltage Substations

      Elia Transmission Belgium heeft een kwalificatiesysteem opgezet voor civiele werken in hoogspanningsonderstations. De werkzaamheden omvatten de bouw en renovatie van hoogspanningsonderstations, zoals funderingen, gebouwuitrusting, sloopwerkzaamheden, graafwerkzaamheden en alle soorten grondwerken, terreinvoorbereiding en -opruiming, oppervlaktebehandeling en sanering, en vergelijkbare toepassingsgebieden.

      Qualification system
      Apr 14, 2029(100+ days)
    • Elia Transmission Belgium

      Onshore Substations in EPCIC-FIM model

      In accordance with the latest Capex Plan, and the on-going energy transition, Elia intends to outsource multiple investment projects for onshore substations in Belgium that were previously realized in-house. The aim is to construct some substations in a EPCIC-FIM model. Meaning that the engineering, procurement (without noble materials/FIM), construction, installation and commissioning will be (partly) tendered in one contract. Only candidates that qualify in the prequalification phase of this EU procurement (see section 5.1.6) of this Qualification System will have access the tender phases.

      Qualification system