Ireland: Tenders/Electricity Supply Board ( ESB )/Advanced Distribution Management System
  1. Planning notice published

    May 22, 2025 11:54 AMMay 22, 2025 11:54 AM
  2. Planned competition start

    May 23, 2025 12:00 AMMay 23, 2025 12:00 AM

Brief

Advanced Distribution Management System

Planned

The competition has not been announced yet.

Deadline
May 23, 2025Expired
Agreement
Buying goods
Estimated value
€0

Brief

The ESBN electricity network is currently monitored, managed, and operated via the Oracle Network Management System (NMS) and Hitachi SCADA system (hereafter ‘ESBN Distribution Management Systems’). The ESBN Distribution Management Systems are classified as critical national infrastructure and represent the backbone required to deliver safe and reliable management of the electricity network of Ireland. ESBN will replace the NMS and SCADA systems with an Advanced Distribution Management System (ADMS) or equivalent solution in 2028 once it has finalised a tender process. The scope of this Advanced Distribution Management System to be purchased will be; (a) An integrated Advanced Distribution Management System or equivalent solution, (b) The implementation (incl. hardware, software and services in designing, building and testing the solution),and (c) Ongoing technical and operational support and maintenance.

Elektrisk utstyr og belysning

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Electricity Supply Board ( ESB )

From the notice

  • The ESBN electricity network is currently monitored, managed, and operated via the Oracle Network Management System (NMS) and Hitachi SCADA system (hereafter ‘ESBN Distribution Management Systems’). The ESBN Distribution Management Systems are classified as critical national infrastructure and represent the backbone required to deliver safe and reliable management of the electricity network of Ireland. ESBN will replace the NMS and SCADA systems with an Advanced Distribution Management System (ADMS) or equivalent solution in 2028 once it has finalised a tender process. The scope of this Advanced Distribution Management System to be purchased will be; (a) An integrated Advanced Distribution Management System or equivalent solution, (b) The implementation (incl. hardware, software and services in designing, building and testing the solution),and (c) Ongoing technical and operational support and maintenance.

  • Contact

    regina.keane2@esb.ie
  • Type
    Planning
  • Location
    Dublin
  • Main code
    Electricity distribution and control apparatus
    31200000

Similar active competitions

  • ESB Networks DAC

    CON 1092 Demand Flexibility

    ESB Networks intends to procure Demand Flexibility Services for the national electricity distribution system in Ireland. Services will take the form of a contracted remunerated service for altering consumption or generation in response to a pre-agreed schedule with ESB Networks. These services will be scheduled for delivery or to be available for delivery to meet the ESB Networks requirements during pre-agreed Service Windows and will be utilised to manage network conditions.

    Qualification system
    Dec 27, 2027(100+ days)
  • Electricity Supply Board ( ESB )

    Elektrisk infrastruktur og veibelysning

    CON1199 - Qualification System for Electrical Distribution Substation Works

    Electricity Supply Board (ESB) needs expressions of interest for a Qualification System for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance, and construction services related to electrical power distribution assets, mainly within substations but also power distribution cables, ring main units, mini-pillars, and other associated assets throughout the distribution network, up to 110 kV voltage level. The works will be located in the Republic of Ireland.

    Qualification system
    Jul 2, 2029(100+ days)
  • Electricity Supply Board ( ESB )

    CON1140 Qualification System for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes

    ESB proposes to establish a qualification system under a negotiated procedure for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes. It is envisaged that a significant number of DSO and TSO GIS Substations will be constructed during the period 2026 - 2035 and will be delivered via this procurement process as outlined in Section A Information Memorandum, attached to this publication. Substations procured under this Qualification System will include for a full end to end scope of delivery which may include in some cases site acquisition and achievement of planning permission on behalf of the Contracting Entity. The scope of substation projects under this Qualification System may include a requirement for the inclusion of additional technologies including but not limited to STATCOMS and series compensators. The First Procurement under the Qualification System is envisaged to be: • Framework for PR6 Capacity at scale EPC delivery of 110 kV and/or 110 kV to /38 kV/MV Substations and Substation Programmes. Economic Operators who wish to participate in this qualification system process should submit a response as set out in the Section A Information Memorandum document. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 27th June 2025 (the “First Procurement Closing Date”).

    Qualification system
    Jun 16, 2028(100+ days)