Search
  • Search


Ireland: Tenders/Electricity Supply Board ( ESB )/CON1140 Qualification System for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes
  1. Competition notice published

    Apr 22, 2025 12:43 PMApril 22, 2025 12:43 PM
  2. Change in competition

    May 19, 2025 12:46 PMMay 19, 2025 12:46 PM
  3. Tender submission deadline

    May 19, 2025 2:46 PMMay 19, 2025 2:46 PM

Brief

CON1140 Qualification System for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes

Deadline
Jun 16, 2028575 days left
Agreement
Construction work

Brief

ESB proposes to establish a qualification system under a negotiated procedure for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes. It is envisaged that a significant number of DSO and TSO GIS Substations will be constructed during the period 2026 - 2035 and will be delivered via this procurement process as outlined in Section A Information Memorandum, attached to this publication. Substations procured under this Qualification System will include for a full end to end scope of delivery which may include in some cases site acquisition and achievement of planning permission on behalf of the Contracting Entity. The scope of substation projects under this Qualification System may include a requirement for the inclusion of additional technologies including but not limited to STATCOMS and series compensators. The First Procurement under the Qualification System is envisaged to be: • Framework for PR6 Capacity at scale EPC delivery of 110 kV and/or 110 kV to /38 kV/MV Substations and Substation Programmes. Economic Operators who wish to participate in this qualification system process should submit a response as set out in the Section A Information Memorandum document. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 27th June 2025 (the “First Procurement Closing Date”).

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Electricity Supply Board ( ESB )

From the notice

  • ESB proposes to establish a qualification system under a negotiated procedure for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes. It is envisaged that a significant number of DSO and TSO GIS Substations will be constructed during the period 2026 - 2035 and will be delivered via this procurement process as outlined in Section A Information Memorandum, attached to this publication. Substations procured under this Qualification System will include for a full end to end scope of delivery which may include in some cases site acquisition and achievement of planning permission on behalf of the Contracting Entity. The scope of substation projects under this Qualification System may include a requirement for the inclusion of additional technologies including but not limited to STATCOMS and series compensators. The First Procurement under the Qualification System is envisaged to be: • Framework for PR6 Capacity at scale EPC delivery of 110 kV and/or 110 kV to /38 kV/MV Substations and Substation Programmes. Economic Operators who wish to participate in this qualification system process should submit a response as set out in the Section A Information Memorandum document. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 27th June 2025 (the “First Procurement Closing Date”).

  • Contact

    networkscontractorprocurement@esb.ie
  • Type
    Competition
  • Location
    Dublin
  • Main code
    Substation construction work
    45232220

Similar active competitions

  • Electricity Supply Board ( ESB )

    Elektrisk infrastruktur og veibelysning

    CON1199 - Qualification System for Electrical Distribution Substation Works

    Electricity Supply Board (ESB) needs expressions of interest for a Qualification System for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance, and construction services related to electrical power distribution assets, mainly within substations but also power distribution cables, ring main units, mini-pillars, and other associated assets throughout the distribution network, up to 110 kV voltage level. The works will be located in the Republic of Ireland.

    Qualification system
    Jul 2, 2029(100+ days)
  • Electricity Supply Board ( ESB )

    Anleggs- og infrastrukturbygging

    CON 1077 - Qualification System for Four (4) Categories of Works and Supplies associated with HV Submarine Cables (including Nearshore and Landfall Civil and Marine Works) in the Republic of Ireland

    Electricity Supply Board (ESB) needs works and supplies associated with HV Submarine Cables (including Nearshore and Landfall Civil and Marine Works) in the Republic of Ireland. The procurement is split into four categories: Category 01 – All Works associated with HV Submarine Cables including Nearshore and Landfall civil and marine works; Category 02 – HV Submarine Cable supply; Category 03 – HV Submarine Cable installation; and Category 04 – Landfall and Nearshore civil and marine works associated with HV Submarine Cables. The first procurement under this system will involve approximately 3km of single core 400kV crossing of the Shannon Estuary.

    Qualification system
    May 8, 2029(100+ days)
  • Electricity Supply Board ( ESB )

    Elektroinstallasjon i bygninger

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Qualification system
    May 30, 2027(100+ days)