Aittaluoto Electric Steam Boiler
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Nov 30, 2023Expired
- Procedure
- With negotiationTwo stages
- Agreement
- Buying goodsover 20 months
Brief
Pori Energia Oy (later also the Purchaser) is planning to supplement the existing industrial process steam production by purchasing and building a new electric steam boiler plant (later also the Electric Boiler) in their energy generation facility of Aittaluoto Power Plant. AFRY Finland is acting as a technical consultant on behalf and for the Pori Energia Oy who will be the contracting entity in this procurement. The Supply shall be consisting of the complete delivery of the functioning Electric Boiler comprising preliminarily: - Preliminary performance: Approximately 45 MW electric steam boiler having electric power supply of c. 10.5 kV, functioning at the pressure level of c. 20 barg and generating process steam through pressure reduction valve at the level of c. 15 barg - Project management, design and engineering - Manufacturing and assembly of all necessary auxiliary equipment with internal piping, valves, pumps, control and instrumentation, electrification and cabling - Packing and transport to foundation on site in Aittaluoto Power Plant - Erection and installation - Startup, commissioning and test-run - Necessary consumables and spare parts for commissioning - Documentation and O&M Manual and training - Possible Options: Electric superheater, zero-load capability, special tools and recommended Spare parts The Supply shall be compliant with Finnish law and stipulations by Finnish authorities. In addition the design and implementation of the Supply shall meet the EU and Finnish design standards and norms. Expected timing for the electric boiler taking-over to commercial operation would be latest early summer 2025.
Industrimaskiner
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
The average value of the Candidate’s turnover for the last three (3) adopted financial years shall be at least EUR 4.000.000 per a financial year.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The Candidate or its its nominated boiler manufacturer shall have the valid and certified (certification made by accredited independent third party) quality system ISO 9001 or any similar systems.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The Candidate or its its nominated boiler manufacturer shall have the valid and certified (certification made by accredited independent third party) environment system ISO 14001 or any similar systems.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The Candidate shall be registered in the trade register of its establishment and shall fulfill the obligations according to the "Law on Contractor Duties and Responsibilities" (1233/2006).
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
The Candidate or its nominated boiler manufacturer shall have delivered at least two (2) electric steam boilers under similar conditions as this procurement (including full responsibility for engineering, manufacture, installation and commissioning), designed and manufactured in accordance with EN design standards and norms, including also Pressure Equipment Directive (PED), taken over during past five (5) years (9/2018 – 10/2023) and whose generating capacity have been at least 30 MW each and operating pressure not less than 10 barg. Only handed over deliveries and accepted by the customer are taken into account.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Source
No source found in the documents. Check the weight against the tender documents.
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Pori Energia Oy, A2020-projekti
From the notice
Pori Energia Oy (later also the Purchaser) is planning to supplement the existing industrial process steam production by purchasing and building a new electric steam boiler plant (later also the Electric Boiler) in their energy generation facility of Aittaluoto Power Plant. AFRY Finland is acting as a technical consultant on behalf and for the Pori Energia Oy who will be the contracting entity in this procurement. The Supply shall be consisting of the complete delivery of the functioning Electric Boiler comprising preliminarily: - Preliminary performance: Approximately 45 MW electric steam boiler having electric power supply of c. 10.5 kV, functioning at the pressure level of c. 20 barg and generating process steam through pressure reduction valve at the level of c. 15 barg - Project management, design and engineering - Manufacturing and assembly of all necessary auxiliary equipment with internal piping, valves, pumps, control and instrumentation, electrification and cabling - Packing and transport to foundation on site in Aittaluoto Power Plant - Erection and installation - Startup, commissioning and test-run - Necessary consumables and spare parts for commissioning - Documentation and O&M Manual and training - Possible Options: Electric superheater, zero-load capability, special tools and recommended Spare parts The Supply shall be compliant with Finnish law and stipulations by Finnish authorities. In addition the design and implementation of the Supply shall meet the EU and Finnish design standards and norms. Expected timing for the electric boiler taking-over to commercial operation would be latest early summer 2025.Main features of the procedureOverall procurement timeline (tentative): Issuance of the Invitation to Bid (ITB) December 2023 Bid submission January 2024 Preferred Bidder award March 2024 Contract signing April 2024
Contact
Maria Nummelinmaria.nummelin@porienergia.fi- Competition · PrequalificationType
- 42160000Main codeBoiler installations
- 31600000Electrical equipment and apparatus42162000Steam-generating boilers