    AVV57_CCE_Lot 7.6_High-Pressure_Steam_Piping

    Ørsted Bioenergy & Thermal Power A/S

    AVV57_CCE_Lot 7.6_High-Pressure_Steam_Piping

    1. Supplier selection

      May 3, 2024 12:00 AMMay 3, 2024 12:00 AM
    2. Contract signed

      May 14, 2024 12:00 AMMay 14, 2024 12:00 AM
    3. Contract start date

      May 15, 2024 12:00 AMMay 15, 2024 12:00 AM
    4. Result notice published

      May 20, 2024 4:20 PMMay 20, 2024 4:20 PM

    Brief

    Denmark: Tenders/Ørsted Bioenergy & Thermal Power A/S/AVV57_CCE_Lot 7.6_High-Pressure_Steam_Piping

    Awarded

    The competition has ended and a winner has been selected.

    Qualification deadline
    May 19, 2024Expired
    Procedure
    With negotiationTwo stages
    Agreement
    Construction workover 18 months

    Brief

    The Contract is for the delivery of High-Pressure Steam Piping - Component & Installation to the Contracting Entity for the Project AVV57 CCE. The delivery includes procurement, fabrication, delivery, installation and insulation. The scope of works under the Contract includes: • Pipe installations including valves, flow meters, supports, insulation and pipe labelling • Fabrication and installation of secondary steel for pipe supports • All installation works. • Pipe materials, bolts, washers, nuts, and gaskets, etc. • Preparation of workshop and assembly • Workshop fabrication including fabrication control • Project management including HSE activities • All transportation including transportation protection and unloading • Pipe marking • Pickup of components supplied by the Employer at the AVV storage area • Rigging, operation, and de-rigging of construction site and construction site facilities • Cranes, trucks, scaffolding, lifts, and similar lifting and assembly equipment • Temporary support and fixation • Health and safety measures • Assembly and assembly control • Quality assurance and quality control • Quality and "as-built" documentation Additional services • Installation of Employer components (e.g. metering equipment) • NDT, cleaning and removal of waste, pressure testing, steam blowing, Internal flushing of pipe systems, Certified welding. • Documentation; As built drawings, Material certificates for base and filler materials, welding documents, NDT, Heat treatment documents and pressure test documents (include documents according to EN13480-5 section 9.4)

    Anleggs- og infrastrukturbygging

    Result

    TED
    • BWES ApS
      Winner
    • Number of bids
      3
    • Contract value
      -DKK 1

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Ørsted Bioenergy & Thermal Power A/S

    From the notice

    • The Contract is for the delivery of High-Pressure Steam Piping - Component & Installation to the Contracting Entity for the Project AVV57 CCE. The delivery includes procurement, fabrication, delivery, installation and insulation. The scope of works under the Contract includes: • Pipe installations including valves, flow meters, supports, insulation and pipe labelling • Fabrication and installation of secondary steel for pipe supports • All installation works. • Pipe materials, bolts, washers, nuts, and gaskets, etc. • Preparation of workshop and assembly • Workshop fabrication including fabrication control • Project management including HSE activities • All transportation including transportation protection and unloading • Pipe marking • Pickup of components supplied by the Employer at the AVV storage area • Rigging, operation, and de-rigging of construction site and construction site facilities • Cranes, trucks, scaffolding, lifts, and similar lifting and assembly equipment • Temporary support and fixation • Health and safety measures • Assembly and assembly control • Quality assurance and quality control • Quality and "as-built" documentation Additional services • Installation of Employer components (e.g. metering equipment) • NDT, cleaning and removal of waste, pressure testing, steam blowing, Internal flushing of pipe systems, Certified welding. • Documentation; As built drawings, Material certificates for base and filler materials, welding documents, NDT, Heat treatment documents and pressure test documents (include documents according to EN13480-5 section 9.4)Main features of the procedureNegotiated with prior publication of a call for competition / competitive with negotiation

    • Contact

      Vuong Van HuynhVUVAH@orsted.com
    • Type
      Result · Prequalification
    • Location
      Sydjylland
    • Main code
      Installation of pipe system
      45231112
    • 45262680Welding

    Similar active competitions

    • EVN Wärme GmbH

      Diverse konstruksjonsmateriell

      Prüfsystem - Lieferung von kunststoffummantelten Stahlrohren für Fernwärmeleitungen inklusive Formteilen, Absperrorganen und Muffenmontage

      Die EVN Wärme GmbH benötigt die Lieferung von kunststoffummantelten Stahlrohren für Fernwärmeleitungen, einschließlich Formteilen, Absperrorganen und Muffenmontage.

      Qualification system
      Jul 28, 2029(100+ days)
    • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ,

      Engroshandel med rørleggerartikler og byggevarer

      Electric Auxiliary Boilers

      BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, furnishing of materials, fabrication, inspection, testing, and documentation for packaged electrode type electric boilers, deaerators, blowdown flash tanks, boiler feed systems, and chemical feed systems, complete with all required controls and instrumentation. The auxiliary boiler has an estimated net steam output of 46,000 kg/hr at 13.79 bar. The packaged boiler shall be designed, fabricated, tested, and stamped in accordance with EN standards, including but not limited to PN-EN 13445 Unfired Pressure Vessels and PN-EN 12953 Shell Boilers.

      Competition
    • DALKIA NORD OUEST (59)

      Anleggs- og infrastrukturbygging

      Pose de canalisations pré-isolées et accessoires pour Réseau De Chaleur

      DALKIA NORD OUEST a besoin de travaux de pose de canalisations pré-isolées et de leurs accessoires, dans le cadre de l’extension du réseau de chaleur urbain de Maubeuge, dans le département du Nord. Le marché porte sur une durée de 1 an.

      Competition with qualification
      Nov 20, 2026(22 days)