    CWS Circulating Water Pumps (Concrete Volute)

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    CWS Circulating Water Pumps (Concrete Volute)

    1. Questions deadline

      Jan 20, 11:00 AMJanuary 20, 2026 11:00 AM
    2. Tender submission deadline

      Feb 3, 11:00 AMFebruary 3, 2026 11:00 AM
    3. Contract start date

      Apr 30, 10:00 PMApril 30, 2026 10:00 PM
    4. Tender validity period

      May 3, 10:00 AMMay 3, 2026 10:00 AM
    5. Competition notice published

      Jul 16, 3:44 PMJuly 16, 2026 3:44 PM

    Brief

    Tender search/BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ/CWS Circulating Water Pumps (Concrete Volute)
    Brief

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, furnishing of materials, fabrication, testing, and delivery of nine vertical concrete volute pumps for three nuclear power plants in Poland. These pumps will circulate brackish Baltic Sea water to cool main condensers, with each pump having a rated flow of 21.3 m3/s, a pump head of 22.5m, and a design life of 60 years. The project requires physical model testing and shop performance testing. The required onsite date for Unit 1 is June 2032.

    About the bid

      The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Deadline (Pre-qualification Submittal): September 2026 (Forecast – Subject to change) RFQ Document Issuance: November 2026 (Forecast – Subject to change) Supplier Proposals Due: January 2027 (Forecast – Subject to change) Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required Onsite Date: Unit 1: June 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package.

      Contact name
      Glenda Warman
      Contact phone
      +1 713-235-2668
      Contact email
      gwarman@bechtel.com

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    Title
    CWS Circulating Water Pumps (Concrete Volute)
    Type
    Competition
    Main code
    45210000Building construction work
    Supplemental codes
    45000000Construction work
    Location
    Gdański

    Active similar competitions

    • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

      Anleggsmaskiner og utstyr

      Circulating Water Pumps (Concrete Volute)

      BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, furnishing of materials, fabrication, testing, and delivery of nine vertical concrete volute pumps (based on European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The pumps, which will circulate brackish Baltic Sea water to remove heat from main condensers, must have a rated flow of 21.3 m3/s, a pump head of 22.5m, and a design life of 60 years. The project requires physical model testing and shop performance testing on the pumps.

      CompetitionJul 27, 2026
    • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

      Anleggsmaskiner og utstyr

      CDS Condensate Pumps

      BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, manufacturing, and delivery of nine vertical deepwell, multi-stage centrifugal condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The equipment, including drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services, must be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. The project location is Gdański. Suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project.

      CompetitionAug 10, 2026
    • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

      Bygg og anlegg - Grunnarbeid, vann og kloakk

      Circulating Water System Intake Equipment Package

      BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, material, fabrication, testing, and delivery of a complete and fully operational Circulating Water System Intake Equipment Package. This includes 24 automatic dual flow type traveling water screens, 33 trash racks, 6 motorized trash rack raking systems, 2 intake tunnel stop gates, and 9 circulating water pump suction stop gates. The traveling screens must be designed for continuous, submerged service in brackish Baltic seawater at a depth of 23m, with material selection considering stagnation, biofouling, mussel formation, and frazil ice formation. The equipment is required on site by July 2032 for Unit 1, with details for Units 2 and 3 to follow.

      CompetitionJul 15, 2026
    • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

      Anleggsmaskiner og utstyr

      Feedwater Pump Packages (Pompy Wody Zasilającej)

      BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, manufacturing, and delivery of nine complete and fully operational feedwater pump packages for the Feedwater System (FWS) serving three AP1000 nuclear generating units in Gdański, Poland. Each package will include a booster pump, a main feedwater pump, an induction motor, a speed increasing gear, couplings, a lube oil system, a seal system, on-skid piping, and instruments. The scope also covers special tools, testing, documentation, quality assurance, inspection, and delivery services. The equipment must be suitable for installation in a turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable EU regulations, Polish codes, and relevant industry standards.

      CompetitionSep 7, 2026
    • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

      Bygg og anlegg - Oppføring og konstruksjon av bygninger

      Special Module Fabrication – Structural Steel – Detail, Fabrication, and Furnish (SR/US)

      BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs detailing, fabricating, and furnishing over 100 structural steel module assemblies for three nuclear power plants in Poland. The total weight of the structural steel modules is approximately 6000 metric tons. The modules include structural steel shapes, plates, studs, and miscellaneous items, primarily carbon steel with some duplex stainless steel. Fabrication is divided into five module categories: Floor modules (CAxx), Liner modules (CBxx), Heavy stair/platform tower framing (CHxx), Light stair modules (CSxx), and Platform modules (SPLxx). The first delivery is required by August 2029, with final delivery by July 2035.

      CompetitionJul 15, 2026