Search
  • Search


Ireland: Tenders/Dublin City Council/DCC Multi Party Framework Agreement for Conservation and Refurbishment Construction Works exceeding €5m ex. VAT with an initial contract for Refurbishment of Former Isolation Hospital Infirmary Road.
  1. Competition notice published

    Sep 5, 2025 9:12 AMSeptember 5, 2025 9:12 AM
  2. Contract signed

    Oct 20, 12:00 AMOctober 20, 2026 12:00 AM
  3. Result notice published

    Oct 30, 11:55 AMOctober 30, 2026 11:55 AM

Brief

DCC Multi Party Framework Agreement for Conservation and Refurbishment Construction Works exceeding €5m ex. VAT with an initial contract for Refurbishment of Former Isolation Hospital Infirmary Road.

Awarded

The competition has ended and a winner has been selected.

Award
Cost 40%
Procedure
With prequalificationTwo stages
Agreement
Framework agreement
Estimated value
€80Mover 4 years

Brief

Dublin City Council has awarded a four-year, €80 million framework agreement for conservation and refurbishment construction projects valued above €5 million (excluding VAT) to Townlink Construction Ltd, McKeon Contech Ltd. trading as McKeon Group and Hereworks, Kelbuild Ltd, Clancy, Purcell Construction Limited, Stewart Construction and Collen Construction Limited. The initial project, awarded to Kelbuild, is a 15-month refurbishment of the former Isolation Hospital on Infirmary Road in Dublin for community and cultural use, involving renovation of existing buildings, structural and masonry repairs, new finishes, mechanical and electrical installations, and external site works. Seven bids were received; awards were evaluated on technical merit (60%) and cost (40%).

Anleggs- og infrastrukturbygging

Result

TED
  • Clancy
    Winner
  • Collen Construction Limited
    Winner
  • JSL Group Ltd. t/a Stewart Construction
    Winner
  • Kelbuild Ltd
    Winner
  • McKeon Contech Ltd. t/a McKeon Group and Hereworks
    Winner
  • Number of tenders received
    7
  • Contract value
    Not stated
  • Maximum framework agreement valueUp to €80,000,000

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Technical Merit

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    Cost

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Dublin City Council

From the notice

  • Expression of Interest for Multi Party Framework Agreement for Conservation and Refurbishment Works for Dublin City Council for projects with an estimated construction value in excess of €5m ex. VAT with the Refurbishment of the Former Isolation Hospital and Repurposing to Community / Cultural Use as the Initial Project. The overall value of the Framework is €80m ex. VAT. The overall scope of works to the Isolation Hospital involves the renovation of multiple existing buildings and repurposing for community use. In broad summary the works included in the renovation of each of the existing buildings include: Demolitions and Alterations - stripping out any remaining decayed timber structures, completions, walls, floors, forming new or widening existing openings for new door sets Substructures - new foundations and rising wall for extensions, new suspended timber floor structures to ground floors generally throughout Walls - masonry repairs to internal and external stone and brick walls Roofs - new rafters and purlins to roof structure generally throughout, new steel roof and tower structure to building G2, repairs and replacement to timber trusses as required Completions - repairs and reglazing to existing sliding sash window where possible, new timber windows to match existing where required, new aluminium framed curtain walling and glazed door sets to extensions, new solid core timber panelled door sets internally Finishes - new floor, wall and ceiling finishes throughout, new natural slate finish generally throughout to roof, new lead roll finish to building G2 including tower structure, Fittings; new built in and sanitary fittings throughout Services - mechanical and electrical installations and External Site Works. The duration of the initial contract is 15 months. The period of the framework agreement will be 4 years. URDF Funding of €7.5m granted. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 6364531. The initial contract for refurbishment of the former Isolation Hospital Infirmary has been awarded to Kelbuild.

  • Contact

    eleanormcgarry@dublincity.ie
  • Type
    Result · Framework agreement · Prequalification
  • Location
    Dublin
  • Main code
    Engineering works and construction works
    45220000
  • 45453100Refurbishment work

Similar active competitions

  • Dublin City Council

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    DCC Multi Party Framework Agreement for Award of Development Agreements for Delivery of Social Housing Projects in the Dublin City Council Area TYPE 1B PROJECTS WITH PLANNING GREATER THAN 50 UNITS

    Dublin City Council seeks experienced developers to deliver and fund social housing projects in the Dublin City Council area through a multi-party framework valued at an estimated €500–800 million, with a maximum total value of €800 million and a duration of 3 years. The procurement covers Type 1B projects with planning permission for more than 50 units; successful framework participants will enter into development agreements and site-sale contracts, together with related documents such as collateral warranties. The authority will use competitive dialogue to work with candidates to identify and define suitable delivery solutions, and the programme is subject to funding.

    Framework agreement with qualification
    Dec 10, 2026(27 days)
    €800,000,000
  • Dublin City Council

    Boligbygg og boligprosjekter

    Multi Party Framework Agreement for Minor Repair and Maintenance Works to occupied properties owned or managed by Dublin City Council

    Dublin City Council needs minor repair and maintenance works to occupied council-owned or managed residential properties across Dublin through 12 multi-party framework agreements: one for each of its 11 housing areas and one citywide. Each lot is valued at €4 million, giving a maximum total value of €48 million, and runs for 1 year with an option to extend by 1 year (1+1). The works will be directed by the Council’s Housing Maintenance Section and procured through an open procedure: suppliers are assessed first against suitability criteria, then successful tenderers against the award criteria; up to 14 suppliers may be admitted to each lot. The procurement is subject to funding.

    Framework agreement
    Dec 4, 2026(21 days)
    €48,000,000
  • Dublin City Council

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    DCC Multi Party Framework Agreement in 3 LOTS for Development Agreements for Social Housing Projects in DCC Area TYPE 2A Projects without Planning more than 100 units Planning application not submitte

    Dublin City Council seeks experienced development partners for a three-lot, multi-party framework agreement, with a maximum estimated total value of €1.5 billion and a 3-year duration. Using competitive dialogue, the council will identify and agree development solutions for social-housing projects in the Dublin area: Type 2A projects without planning permission, involving more than 100 units and with no planning application submitted. Successful partners will be expected to enter into development agreements and contracts for sale of the relevant sites, and to develop and fund social housing units; the procurement is subject to funding.

    Framework agreement with qualification
    Dec 10, 2026(27 days)
    €1,500,000,000