Search
  • Search


Ireland: Tenders/Coimisiún na Meán/ENQEIR966 - DS3 System Services – Volume Uncapped – Gate 13
  1. Competition notice published

    Jun 19, 2025 9:38 AMJune 19, 2025 9:38 AM
  2. Supplier selection

    Sep 1, 2025 12:00 AMSeptember 1, 2025 12:00 AM
  3. Contract signed

    Oct 1, 2025 12:00 AMOctober 1, 2025 12:00 AM
  4. Result notice published

    Sep 1, 7:12 AMSeptember 1, 2026 7:12 AM

Brief

ENQEIR966 - DS3 System Services – Volume Uncapped – Gate 13

Awarded

The competition has ended and a winner has been selected.

Procedure
OpenSingle stage
Agreement
Buying services
Estimated value
€140.5Mover 10 months

Brief

EirGrid plc has entered into an agreement with PowerHouse Generation Ireland Ltd, EnerNOC Ireland Ltd, Statkraft Ireland Ltd., Sundew Solar Designated Activity Company, Derrinlough Wind Farm, Electricity Exchange, Grange Backup Power Limited, and Shannonbridge Power (B) Limited for the provision of DS3 System Services. The services, covering 12 different lots, will be delivered in Dublin for a duration of 10 months, starting from October 1, 2025, with an option for extension. The total estimated value of the contract is 140.5 million EUR. 21 bids were received for this contract.

Elektrisitetshandel og vannkraftproduksjon

Result

TED
  • Derrinlough Wind Farm
    Winner
  • Electricity Exchange
    Winner
  • EnerNOC Ireland Ltd
    Winner
  • Grange Backup Power Limited
    Winner
  • PowerHouse Generation Ireland Ltd
    Winner
  • Number of bids
    21
  • Contract value
    €140,500,000

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Coimisiún na Meán

From the notice

  • This Qualification System refers to the system that is in place to enable interested parties to submit a response and subsequently qualify for award of Contract for provision of DS3 System Services. Gate 13 covers all 12 services outlined in the Qualification System Briefing Document. The services are split into a number of Lots for the TSO. Lots 1IE – 12IE relate to the System Services required by EirGrid. It is intended that the start date of each of the Contracts awarded under Gate 13 is 1st October 2025. It is intended that the term of each Contract will last until 30th April 2026, as per the decision of the Regulatory Authority set out in SEM-23-103 System Services Future Arrangements - Decision Paper 3, but with an option for TSO to extend the term of its Contract in respect of any or all of its applicable Lots in certain defined cases, at the discretion of the Contracting Entity. This option might apply where, for instance, there is a delay in completing the procurement for any subsequent phases envisaged under the DS3 Programme.

  • Contact

    tenders@eirgrid.com
  • Type
    Result
  • Location
    Dublin
  • Main code
    Energy and related services
    71314000

Similar active competitions

  • Electricity Supply Board ( ESB )

    CON1140 Qualification System for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes

    ESB proposes to establish a qualification system under a negotiated procedure for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes. It is envisaged that a significant number of DSO and TSO GIS Substations will be constructed during the period 2026 - 2035 and will be delivered via this procurement process as outlined in Section A Information Memorandum, attached to this publication. Substations procured under this Qualification System will include for a full end to end scope of delivery which may include in some cases site acquisition and achievement of planning permission on behalf of the Contracting Entity. The scope of substation projects under this Qualification System may include a requirement for the inclusion of additional technologies including but not limited to STATCOMS and series compensators. The First Procurement under the Qualification System is envisaged to be: • Framework for PR6 Capacity at scale EPC delivery of 110 kV and/or 110 kV to /38 kV/MV Substations and Substation Programmes. Economic Operators who wish to participate in this qualification system process should submit a response as set out in the Section A Information Memorandum document. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 27th June 2025 (the “First Procurement Closing Date”).

    Qualification system
    Jun 16, 2028(100+ days)
  • Gas Networks Ireland

    Bedriftsrådgivning

    25/022 Qualification System for Economic, Regulatory and Financial Affairs Services

    The objective of this QSQ is to qualify Applicants onto the Qualification System for provision of Economic, Regulatory and Financial Affairs – see Appendix 1 for more details regarding the requirement. Admission to the Qualification System is subject to Applicants meeting the minimum requirements. The details of how the Qualification System will operate are set out in Appendix 2 (Operation of the Qualification System). Applicants should note that from time to time over the term of the Qualification System, the Contracting Entity, at its sole discretion but without altering the overall nature of the Qualification System, may modify the Qualification System to reflect changes in its requirements. In addition, the Contracting Entity reserves the right to add additional lots to the Qualification System. The conditions under which such an option may be exercised by the Contracting Entity will be outlined in the relevant call off competition document.

    Qualification system
    Jun 13, 2028(100+ days)
  • Electricity Supply Board ( ESB )

    Elektrisk infrastruktur og veibelysning

    CON1199 - Qualification System for Electrical Distribution Substation Works

    Electricity Supply Board (ESB) needs expressions of interest for a Qualification System for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance, and construction services related to electrical power distribution assets, mainly within substations but also power distribution cables, ring main units, mini-pillars, and other associated assets throughout the distribution network, up to 110 kV voltage level. The works will be located in the Republic of Ireland.

    Qualification system
    Jul 2, 2029(100+ days)