Framework Agreement for the Solar Park - Energielandschap Lageland
Bygningsarbeid og installasjoner
Zonnepark Meerstad Noord B.V. needs construction services for a solar park, with a framework agreement duration of 8 years. The project involves the turnkey EPC construction of a solar park, including an intake substation, with the EPC contractor responsible for coordination and integration. Phase 1 includes approximately 58.9 MWp PV connected to a 21 MW grid, with a target operational date of Q1 2029. Phase 2, an expansion of approximately 142.3 MWp PV (total 201 MWp, or 250.5 MWp including third-party contributions), will be called off later via a mini-competition. The site is located in Overig Groningen, Netherlands, and covers approximately 175 ha of wet peatland. Offers will be evaluated based on Price (50%) and Quality (50%).
About the bid
- Contact name
- Gerard Verelst
- Contact phone
- +31 615317139
- Contact email
- officemanagement@energiebedrijfgroningen.nl
- Address
- Winschoterdiep 50, 9723AB Groningen
The Client intends to enter into a Framework Agreement (the Agreement) with three (3) parties for the construction of the Solar Park. The Specific Contracts under the Agreement will be put out to tender as turnkey EPC contracts for the Solar Park, with the Tenderer who, in the ranking of this tender, has submitted the most economically advantageous tender being awarded the first Specific Contract. The EPC contractor must deliver the solar park on a turnkey basis, including the intake substation. The EPC contractor is responsible for the necessary coordination with the supplier of the intake substation and for ensuring the correct integration of both installations. Phase 1: approximately 58.9 MWp PV, connected to a 21 MW grid connection (shared with the BESS), with a target operational date of Q1 Phase 2: expansion by approximately 142.3 MWp of PV (total approximately 201 MWp; including third-party contributions, approximately 250.5 MWp), in conjunction with the upscaling of t 2029. - Phase 1: approximately 58.9 MWp PV, connected to a 21 MW grid connection (shared with the BESS), with a target operational date of Q1 2029. - Phase 2: expansion by approximately 142.3 MWp of PV (total approximately 201 MWp; including third-party contributions, approximately 250.5 MWp), in conjunction with the upscaling of the connection (feed-in capacity up to 260 MW, off-take up to 145 MW). Phase 2 is not being awarded at this stage, but is secured within the Agreement and will be called off at a later date via a mini-competition between the Framework Contractors. The indicative timetable is around 2032/2033, subject to TenneT. The site covers approximately 175 ha of wet peatland.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Description
Price
Description
Quality
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Zonnepark Meerstad Noord B.V.
- Title
- Framework Agreement for the Solar Park - Energielandschap Lageland
- Type
- Main code
- Supplemental codes
- Location
- Overig Groningen
- Duration
- 8 years