    HV-Skids for HV-substation Lageland

    Lageland B.V.

    HV-Skids for HV-substation Lageland

    1. Competition notice published

      Sep 10, 5:09 PMSeptember 10, 2026 5:09 PM
    2. Questions deadline

      Sep 24, 2:00 PMSeptember 24, 2026 2:00 PM
    3. Opening date

      Oct 26, 11:00 AMOctober 26, 2026 11:00 AM
    4. Tender submission deadline

      Oct 26, 11:00 AMOctober 26, 2026 11:00 AM
    5. Contract start date

      Dec 1, 12:00 AMDecember 1, 2026 12:00 AM
    6. Tender validity period

      Jan 26, 11:00 AMJanuary 26, 2027 11:00 AM
    7. Contract end date

      Nov 1, 12:00 AMNovember 1, 2028 12:00 AM

    Brief

    Netherlands: Tenders/Lageland B.V./HV-Skids for HV-substation Lageland
    Brief

    Elektrisk utstyr og belysning

    Lageland B.V. needs the supply of CT-VS skids, disconnector skids, pantograph switch skids, pantograph earthing switch skids, field and rail gantries, and associated combination cabinets and all required mechanical, electrical and control interfaces necessary for a complete and operational installation, suitable for outdoor installation in a 110 kV AIS substation, to be delivered to Overig Groningen, Netherlands. The equipment must be ready for transport by May 31, 2028, with delivery to site between June 1, 2028, and October 31, 2028. Offers will be evaluated based on Quality (Transportation plan) at 50% and Price at 50%.

    About the bid

      The Assignment consists of the supply of CT-VS skids, disconnector skids, pantograph switch skids, pantograph earthing switch skids, field and rail gantries, and associated combination cabinets and all required mechanical, electrical and control interfaces necessary for a complete and operational installation. The equipment shall be suitable for outdoor installation in a 110 kV AIS substation and shall ensure safe, reliable and maintainable operation throughout the specified design life of the installation. A detailed overview of all in-scope work packages with OBS numbers and the distribution of engineering/procurement/realization/testing is included in Appendix 4: Technical Specifications and Design.Main features of the procedureThe Client maintains a timeframe for the HV-Skids delivery on Site from 1 June 2028 up to and including 31 October 2028. The exact required delivery date(s) will be communicated by Client call-off minimum 2 months in advance. The Tenderer shall take into account that the HV-Skids shall be complete (including FAT) and ready for transport as per 31 May 2028.

      Contact name
      Gerard Verelst
      Contact phone
      +31 645773356
      Contact email
      info@energiebedrijfgroningen.nl
      Address
      Winschoterdiep 50, 9723AB Groningen

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      The transportation plan is assessed by the assessment team on three sub-criteria: 1. Risk management 2. Emergency management 3. Interface control. See Tender Guidelines 5.2.1.1.

      Sub-criteria

      Description

      Risk management

      Description

      Emergency management

      Description

      Interface control

    • Description

      Tenderer shall fill his pricing in the Appendix 5 - Price Schedule. The Price Schedule calculates the Total Tender Price

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Lageland B.V.
    Title
    HV-Skids for HV-substation Lageland
    Type
    CompetitionPrequalification
    Main code
    44318000Conductors
    Supplemental codes
    31200000Electricity distribution and control apparatus
    Location
    Overig Groningen

    Active similar competitions

    • Batterij Meerstad Noord B.V.

      Elektrisk infrastruktur og veibelysning

      Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland

      Batterij Meerstad Noord B.V. in the Netherlands needs three contractors for a framework agreement over 8 years for the realization of a Battery Energy Storage System (BESS) at Energielandschap Lageland. The project involves the delivery of a functional, ready-to-use, grid-compliant, and safe battery system, with contractors responsible for design, supply, construction, system integration, testing, commissioning, and handover, as well as long-term operation and maintenance. Phase 1 includes approximately 15 MW // 60 MWh BESS, connected to a 21 MW grid connection, with commissioning planned for Q1 2029. Phase 2 involves an expansion to at least 50 MW // 200 MWh BESS around 2032/2033. Award criteria are Price (50%) and Quality (50%).

      Framework agreement with qualificationSep 25, 2026
      Oct 29, 2026(18 days)
    • Provincie Noord-Brabant

      Ontwerp en realisatie van twee 10kV inkoopstations in Westerhoven en Helmond

      Provincie Noord-Brabant heeft behoefte aan het ontwerp en de volledige realisatie van twee betreedbare MS-inkoopstations, inclusief aparte klantruimte en middenspanning-(MS) schakelaars, op twee locaties in zuidoost-Brabant (Westerhoven en Helmond). Deze inkoopstations zijn bedoeld voor de toekomstige voeding van laadpleinen voor elektrische bussen. De gunningscriteria zijn prijs (60%), aanpak van ontwerp en engineering (20%) en projectbeheersing en planning (20%).

      CompetitionSep 29, 2026
      Oct 21, 2026(10 days)
    • Gemeente Leiden

      Elektrisk infrastruktur og veibelysning

      A08.602.2026 Raamovereenkomst stroomkasten (2)

      De Gemeente Leiden heeft behoefte aan diensten voor het onderhoud van stroomkasten voor evenementen en markten, inclusief calamiteitenafhandeling en vervanging, voor een periode van 4 jaar. De geschatte jaarlijkse waarde voor onderhoud bedraagt €55.000, met een maximale totale waarde van de raamovereenkomst van €350.000. De stroomkasten moeten voldoen aan de NEN3140-norm en zijn geoptimaliseerd voor multifunctioneel gebruik. Opdrachten worden op oproep uitgevraagd. De gunningscriteria zijn Prijs (40%), Plan van aanpak respons (30%), Plan van aanpak circulariteit & milieu (15%) en Emissie verlagend vervoer van materiaal en materieel (15%). Unica Installatietechniek B.V. en Van Dorp Installaties bv hebben vandaag een vergelijkbaar contract.

      CompetitionOct 8, 2026
      Oct 15, 2026(4 days)
    • Stedin Netbeheer B.V.

      Oppføring av bygninger

      Erkenningsregeling het ontwerpen en realiseren van 150kV t/m 10kV stations

      De erkenningsregeling is onderverdeeld in 3 categorieën: Categorie 1: Ontwerpen Het ontwerpen van primaire, secundaire en tertiaire systemen, bouwkundig/Gebouw Gebonden Installaties, terreininrichting, telecom en stationsautomatisering; Categorie 2: Ontwerpen en uitvoeringsrealisatie Het ontwerpen en de uitvoeringsrealisatie van primaire, secundaire en tertiaire systemen, bouwkundig/Gebouw Gebonden Installaties, terreininrichting, telecom en stationsautomatisering; Categorie 3: Uitvoeringsrealisatie Uitvoeringsrealisatie van primaire, secundaire en tertiaire systemen, bouwkundig/Gebouw Gebonden Installaties, terreininrichting, telecom en stationsautomatisering.

      Qualification systemJan 3, 2024
      Jan 31, 2027(112 days)
    • Zonnepark Meerstad Noord B.V.

      Bygningsarbeid og installasjoner

      Framework Agreement for the Solar Park - Energielandschap Lageland

      Zonnepark Meerstad Noord B.V. needs construction services for a solar park, with a framework agreement duration of 8 years. The project involves the turnkey EPC construction of a solar park, including an intake substation, with the EPC contractor responsible for coordination and integration. Phase 1 includes approximately 58.9 MWp PV connected to a 21 MW grid, with a target operational date of Q1 2029. Phase 2, an expansion of approximately 142.3 MWp PV (total 201 MWp, or 250.5 MWp including third-party contributions), will be called off later via a mini-competition. The site is located in Overig Groningen, Netherlands, and covers approximately 175 ha of wet peatland. Offers will be evaluated based on Price (50%) and Quality (50%).

      Framework agreement with qualificationSep 25, 2026
      Oct 29, 2026(18 days)