HYODE- Environmental Impact Assessment(EIA) services and hazard study for the installation and operation of an offshore hydrogen production station
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
Miljørådgivning og klimatiltak
EDF power solutions needs services related to Environmental Impact Assessment (EIA) for construction and civil engineering activities, specifically for drafting, support, and preparation of necessary documents for submitting a request for a single authorization associated with projects in the Exclusive Economic Zone (EEZ). This includes environmental impact study files, Natura 2000 impact assessments, and applications for derogation concerning protected species, with support during the examination and consultation phase until issuance, for one to two offshore wind projects. The candidate must demonstrate their ability to address the identified themes and expertise required for the successful completion of the single authorization request, either independently or in a consortium, and specify any need for support from expert consulting firms. Award criteria are not solely based on cost or price, and all criteria will be detailed in the procurement documents. Qualification requirements include compliance with French Labor Code articles concerning the employment of disabled workers, submission of a group agreement if applicable, a sworn statement of non-conviction, a K-Bis extract less than 6 months old, a certificate of social declarations and payment of contributions, and a certificate of Civil Liability insurance.
About the bid
- Contact name
- Nahed GARES
- Contact phone
- 0618062619
- Contact email
- nahed.gares@edf-power.com
- Address
- 43 Boulevard des BOUVETS, 92741 NANTERRE CEDEX
Drafting, support, and preparation of the necessary documents for submitting a request for a single authorization associated to projects in the Exclusive Economic Zone (EEZ), including environmental impact study files, Natura 2000 impact assessments, and applications for derogation concerning protected species and its support during the examination and consultation phase, until its issuance for one to two offshore wind projects. The candidate must demonstrate their ability to address the identified themes and expertise required for the successful completion of the single authorization request. This capability can be justified either independently or in a consortium. The need for support from expert consulting firms on certain themes must be specified. Note: Final specifications to be provided at further stage; the contract may be slightly revised as a result.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Description
Cost is not the sole award criterion, and all criteria are set out in the procurement documents only. Specific requirements defined in the Specifications will be provided during consultation on the procurement portal: site https://pha2.edf.com/
Description
Price is not the sole award criterion, and all criteria are set out in the procurement documents only. Specific requirements defined in the Specifications will be provided during consultation on the procurement portal: site https://pha2.edf.com/
Description
Quality is not the sole award criterion, and all criteria are set out in the procurement documents only. Specific requirements defined in the Specifications will be provided during consultation on the procurement portal: site https://pha2.edf.com/
Qualification requirements
Description
The candidate must be in compliance with Articles L. 5212-1 to L. 5212-11 of the French Labor Code concerning the employment of disabled workers. These conditions apply to candidates and to each member of a candidate group.
Documentation Requirement
If the candidate is in compliance with these articles of the Public Procurement Code, please submit the completed and signed affidavit on the following website https://pha2.edf.com/ referenced BPM020413. In the event of a group, a certificate must be provided by each member of the group.
Description
If several candidates wish to present themselves as a group, a duly completed group agreement detailing the work that will be carried out by each member of the group is required.
Documentation Requirement
The duly completed group agreement.
Description
A sworn statement of non-conviction of the company or each member of the group is required.
Documentation Requirement
A sworn statement of non-conviction of the company or each member of the group, on the following site https://pha2.edf.com/ referenced AVIS020433.
Description
A K-Bis extract less than 6 months old from the company or each member establishment of the group responding to the call for applications is required.
Documentation Requirement
A K-Bis extract less than 6 months old from the company or each member establishment of the group responding to the call for applications.
Description
A certificate of social declarations and payment of contributions from the company or each member of the group is required.
Documentation Requirement
A certificate of social declarations and payment of contributions from the company or each member of the group.
Description
If the bidder or one or more members of the group are secondary establishments and do not have certificates in their name, the bidder(s) must provide the certificates from the entity to which the secondary establishment responding to the call for applications is linked.
Documentation Requirement
Certificates from the entity to which the secondary establishment responding to the call for applications is linked as well as the K-BIS, L-BIS or Situation extract in the SIRENE directory justifying the link between the two establishments.
Description
A certificate of Civil Liability insurance from the company or each member of the group is required.
Documentation Requirement
A certificate of Civil Liability insurance from the company or each member of the group.
Description
The compliance questionnaire duly completed by the company or each member of the group is required.
Documentation Requirement
The compliance questionnaire duly completed by the company or each member of the group communicated on the following site https://pha2.edf.com/ referenced AVIS020433.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- EDF Renouvelables
- Title
- HYODE- Environmental Impact Assessment(EIA) services and hazard study for the installation and operation of an offshore hydrogen production station
- Type
- Main code
- Supplemental codes