Denmark: Tenders/Energistyrelsen/Kriegers Flak II Offshore Wind Farm - Denmark
  1. Competition notice published

    Apr 22, 2024 2:57 AMApril 22, 2024 2:57 AM
  2. Change in competition

    May 1, 2024 11:23 AMMay 1, 2024 11:23 AM
  3. Result notice published

    Jan 30, 2025 5:25 PMJanuary 30, 2025 5:25 PM
  4. Questions deadline

    Feb 3, 2025 11:00 AMFebruary 3, 2025 11:00 AM
  5. Tender submission deadline

    Feb 10, 2025 11:00 AMFebruary 10, 2025 11:00 AM
  6. Contract start date

    Feb 28, 2025 11:00 PMFebruary 28, 2025 11:00 PM
  7. Tender validity period

    May 10, 2025 10:00 AMMay 10, 2025 10:00 AM
  8. Contract end date

    Feb 27, 11:00 PMFebruary 27, 2026 11:00 PM

Brief

Kriegers Flak II Offshore Wind Farm - Denmark

Cancelled

The competition has been cancelled.

Deadline
Jan 29, 2025Expired
Agreement
Construction work
Estimated value
DKK 47Bover 40 years

Brief

Danish Energy Agency har avlyst konkurransen om etablering av Kriegers Flak II Offshore Wind Farm i Danmark, som skulle ha en produksjonskapasitet på minst 1 GW. Prosjektet var en del av flere politiske avtaler for å fremme grønn omstilling og styrke energiforsyningssikkerheten i Danmark. Vindparken skulle etableres i samarbeid med State Holding, et statlig selskap som skulle eie 20% av konsesjonæren. Konsesjonæren ville bære alle kommersielle risikoer knyttet til etablering, drift og avvikling av vindparken, inkludert kostnader forbundet med forebyggende tiltak for å beskytte militær radiokommunikasjon og radarsystemer, begrenset til maksimalt 200 millioner DKK. Konkurransen hadde en maksimal totalverdi på 47 milliarder DKK og en varighet på 40 år.

Anleggs- og veibygging

Result

TED
  • Reason for cancellation
    Other
  • Number of tenders received
    0

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Tildeling av konsesjonsavtalen til det økonomisk mest fordelaktige tilbudet vil skje på grunnlag av tildelingskriteriet Pris. Tildelingskriteriet Pris vil bli vurdert på grunnlag av budprisen som tilbyder har sendt inn i tilbudsbrevet (vedlegg A), i anskaffelsesspesifikasjonene. Budprisen må utgjøre en total konsesjonsbetaling for retten og plikten til å utnytte konsesjonsområdet. Den totale konsesjonsbetalingen må dekke en periode på 30 år. Konsesjonsbetalingen er ikke underlagt merverdiavgift (MVA) eller indeksering i 30-årsperioden. Konsesjonæren skal foreta betalingen en gang i året som en fast årlig betaling i DKK. Den årlige betalingen beregnes som budprisen delt på 30.

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Energistyrelsen

From the notice

  • The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from the 29 June 2018, - Climate Agreement from the 22 June 2020, - the Financial Act from the 4 December 2022, - Climate Agreement regarding green electricity and heat from the 25 June 2022, and - additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named "Kriegers Flak II", pursuant to the directive 2014/23/EU on the award of concession contracts as implemented into Danish law by the executive order no. 1080 of 29 June 2022 on award of concession contracts. Please note that the name of the offshore wind farm can be changed by the DEA. Such change will not affect the geographical location of the offshore wind farm. The Kriegers Flak II will in the following be called “the offshore wind farm”. The Concessionaire is obliged to establish the offshore wind farm to be held in co-ownership with State Holding with the production capacity of electricity of at least 1 GW. State Holding is a company that will be established by the State of Denmark as a wholly owned public limited liability company (in Danish: “aktieselskab” or “A/S”) prior to the award signing of the Concession Agreement. State Holding shall purchase 20% of the Concessionaire at the end of the investment period (6 months after signing the Concession Agreement). State Holding will be a passive investor and a minority shareholder of the Concessionaire. The co-ownership is further described below in the section “Contract terms”. The offshore wind farm shall be established before 31 December 2030. The Concessionaire will in special cases be entitled to an extension of this deadline. Connection of the offshore wind farm to the Danish Transmission Grid is voluntary for the Concessionaire. The Concession Agreement further enables the Concessionaire to establish Overplanting Capacity within the Concession Area, i.e. it is optional for Concessionaire to establish more than 1 GW capacity within the Concession Area. Furthermore, the Concessionaire may exploit the production capacity of electricity from the offshore wind farm for energy production, such as but not limited to innovative energy production (e.g. Power-to-X), if this is otherwise possible within the applicable legislation, and provided it takes place within the Concession Area. As a natural consequence of the Concession Agreement, the Concessionaire bears all commercial risks associated with the establishment, operation and decommissioning of the offshore wind farm, including any potential overplanting capacity. Such commercial risks include but is not limited to energy price development, legislative changes and general market conditions and demands. Additionally, the Concessionaire is responsible for the commercial risks related to any innovative energy production (e.g. Power-to-X facility). The Concessionaire shall also bear the actual cost for the temporary and permanent preventive measures implemented so as to prevent deteriorations in the quality of the current military radio communication and radar surveillance caused by the offshore wind farm, determined by the Danish Defence. Regardless of the actual total cost of the temporary and permanent preventive measures once determined by the Danish Defence being higher, the total costs to be born by the Concessionaire is maximized at DKK 200 million. Should the actual total cost of the temporary and permanent preventive measures be determined by the Danish Defence to be lower than DKK 200 million, the Concessionaire shall only be obligated to pay such lower amount. Furthermore, the Concessionaire shall bear the full cost of the offshore preliminary investigations performed by Energinet, pursuant to section 23 (3) of the the Renewable Energy Act (RE Act), statutory order no. 132 of 6 February 2024. Further, costs to be borne by the Concessionaire will be stipulated in the construction license and/or procurement material. The location site of the offshore wind farm is further stated below under section "Place of Performance" as well as in procurement material Appendix 2 (Location of the Concession Area). Before the deadline for submission of tender, the Concession Area as set out in Appendix 2 (Location of the Concession Area) may be adjusted as a result of the preparation of the environmental report for the Strategic Environmental Assessment of the plan for the offshore wind farm subject to this procurement procedure. For further information, reference is made to section 1 of the Procurement Specifications. Reference is further made to the regulation in the Procurement Specifications, Annex F (Concession Agreement), Appendix 1 (Project Specifications), and the procurement material as a whole.Main features of the procedureThe procurement procedure applicable to this procurement constitutes a procedure, where any interested economic operator, who is able to comply with the minimum requirements for eligibility regarding economic/financial capacity and technical/professional capacity, cf. the descriptions below in section regarding "Participation - Selection criteria" and also section 6 of the Procurement Specifications, may submit a tender in response to this invitation to tender. The DEA expects to award the Concession Agreement based on the initial tenders. However, the DEA reserves the right to enter into negotiations with the Tenderers based on the submitted initial tenders, cf. art. 37 (6) of the directive 2014/23/EU, and subsequently ask for revised tenders. If negotiations are initiated, the DEA will inform the Tenderers hereof and describe the negotiation procedure.

  • Contact

    Martina Papias Nissolinoowfprocurement@ens.dk
  • Type
    Result
  • Location
    Østsjælland
  • Main code
    Construction work
    45000000
  • 31121320Wind turbines31121330Wind turbine generators31121340Wind farm31160000Parts of electric motors, generators and transformers31170000Transformers31213400Distribution system31300000Insulated wire and cable45244000Marine construction works45244100Marine installations

Similar active competitions

  • Energistyrelsen

    Elektrisk utstyr og belysning

    North Sea I, South, Offshore Wind Farm

    Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

    Competition
    Oct 23, 2028(100+ days)
    DKK 6,600,000,000
  • Gentofte Kommune

    Elektrisk utstyr og belysning

    Udbud af ret til at virke som ladeoperatør af offentligt tilgængelige ladepunkter i Gentofte Kommune (Genudbud)

    Gentofte Kommune udbyder retten til at etablere og drive offentligt tilgængelige ladepunkter på kommunale vejarealer i Gentofte i en 10-årig koncession med en anslået maksimal samlet værdi på 220 millioner kroner. Udbuddet omfatter 220 ladepunkter fordelt på ni delaftaler, herunder både genudbud af eksisterende lokationer og nye etableringer. Operatøren udarbejder selv løsningen for hver lokation, vælger mellem normalladere, hurtigladere og lynladere og finansierer etablering, drift og nedtagning. Delaftaler kan tildeles, men én tilbudsgiver kan ikke få dem alle. Tildelingen baseres udelukkende på samlet evalueringssum (100 %).

    Competition
    Dec 15, 2026(27 days)
    DKK 220,000,000
  • KONSTANT Net A/S

    Elektrisitet og energiforvaltning

    Udbud af aftale om levering af el til dækning af nettab

    KONSTANT Net A/S needs electricity for grid losses for a contract period of 2+1 years, with an estimated total quantity of approximately 299,150,000 kWh and a maximum total value of 240,000,000 DKK. The services are to be delivered in Østjylland. NRGi ELSALG A/S has a similar contract today. The award criterion is price (100%). Suppliers must demonstrate a minimum turnover of 150,000,000 DKK and a minimum equity of 20,000,000 DKK in each of the last two completed financial years.

    Competition
    Nov 20, 2026(2 days)
    DKK 240,000,000