Search
  • Search


    Lease of locomotives

    DSB

    Lease of locomotives

    1. Competition notice published

      Jun 9, 5:24 AMJune 9, 2026 5:24 AM
    2. Contract signed

      Sep 21, 12:00 AMSeptember 21, 2026 12:00 AM
    3. Result notice published

      Oct 26, 8:54 AMOctober 26, 2026 8:54 AM

    Brief

    Denmark: Tenders/DSB/Lease of locomotives

    Awarded

    The competition has ended and a winner has been selected.

    Award
    Price 40%
    Procedure
    OpenSingle stage
    Agreement
    Buying goods
    Estimated value
    €30Mover 68 months

    Brief

    DSB has awarded ELL Germany GmbH a contract worth €26.35 million to lease electric locomotives and provide full-service maintenance for regional and long-distance passenger operations in Denmark. The contract runs for 68 months and covers a phased fleet requirement of 6 locomotives initially, 10–12 at peak, and 6–8 during the phase-down. The locomotives must be Siemens AC Vectron B18 units, no more than five years old, capable of push-pull and double-traction operation, and compatible with Banedanmark’s electrified network, excluding the S-bane. Maintenance includes preventive and corrective work and spare parts; the facility must be in Denmark or the Malmö region and operate under ECM rules, with the provider or its subcontractor holding all four ECM roles. Three bids were received.

    Spesialisert jernbaneutstyr

    Result

    TED
    • ELL Germany GmbH
      Winner
    • Number of bids
      3
    • Contract value
      €26,350,000

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      Leverandøren må dokumentere én eller flere referanser for leveranser innenfor de siste tre årene som samlet inkluderer leie av 25 elektriske lokomotiver for drift.

      Documentation Requirement

      Leverandøren må levere ESPD med en liste over de mest betydningsfulle sammenlignbare leveransene som leverandøren har utført de siste tre årene før fristen for innlevering av tilbud. Hver referanse skal inneholde en kort beskrivelse av leveransene, inkludert en klar beskrivelse av leveransene (lokomotiv/type/navn og antall lokomotiver), leverandørens rolle(r), den økonomiske verdien av leveransen (beløp), leveringsdato og kundens navn. Ved angivelse av leveringsdato skal leverandøren angi start- og sluttdato for leveransen. Hvis dette ikke er mulig, for eksempel ved kontinuerlige oppgaver under en rammeavtale, skal leverandøren angi hvordan datoen er spesifisert. Før tildelingsbeslutningen tas, må leverandøren som DSB har til hensikt å tildele kontrakten, levere dokumentasjon som bekrefter at informasjonen i ESPD er nøyaktig. DSB forbeholder seg retten til å kontakte leverandøren eller kundene for å verifisere informasjonen.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Leverandøren kan basere seg på teknisk kapasitet fra andre aktører for å oppfylle egnethetskravene.

      Documentation Requirement

      Aktøren(e) som stiller sin tekniske kapasitet til rådighet for leverandøren, må signere en forpliktelseserklæring, se nærmere i konkurransevilkårene, seksjon 3. Skjemaet er vedlagt som et vedlegg til konkurransevilkårene.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      Reference is made to Appendix A -Award Criteria.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Reference is made to Appendix A -Award Criteria.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at DSB

    From the notice

    • DSB is experiencing significant growth in passenger numbers, particularly in the regional and long-distance segments. To address this increased demand before the full integration of new rolling stock from ongoing procurements, DSB foresees a temporary need to supplement its existing fleet of locomotives in commercial operations from approximately December 2026 until the Q2 2030 as outlined in the tender material (Appendix 1 – Price Sheet). DSB therefore plans to lease electric locomotives to support operations with DSB litra EC and other coach litras over three phases: ramp-up, peak, and ramp-down. In the ramp-up phase, from approximately December 2026 to November 2027, it is expected that 6 locomotives will be needed. During the peak phase, from approximately December 2027 to April 2029, it is expected that 10-12 locomotives will be needed to manage increased operational demand. In the ramp-down phase, from approximately May 2029 to April 2030, it is expected that 6-8 locomotives will be needed as new rolling stock will be phased in and operations with the leased locomotives will scale down. A detailed description of the planned demand is set out in the tender material (Appendix 1 – Price Sheet). To minimize complexity in its daily operations, DSB puts out to tender also the maintenance of said locomotives in the lease as a full-service agreement including corrective and preventive maintenance, provision of all spares etc., where the lessor is responsible for providing locomotives according to required availability. The setup should be as follows: Locomotives: 1. The locomotives should be of type Siemens AC Vectron B18. 2. The locomotives should be capable of performing push-pull operation, from either end of the locomotive coach formation. 3. The locomotives should be capable of performing double traction as push and pull operation, with a locomotive placed at each end of the coaches coupled to the coaches mechanically and electronically via the WTB line. 4. The locomotives should be manufactured within the last five years. 5. It should be possible from the locomotive cab to operate the full functionality, as defined by the ÖBB Fernsteuerkonzept (see sec 1.5), of the locomotive in the other end and the coaches. 6. Any supplementary rail activities necessary to carry out passenger operation should be possible, for instance empty train movement to other locations. 7. The locomotives should be capable of performing operation coexisting with other electric vehicles. Regional Train and Intercity Train Services: 8. The locomotives should be able to perform passenger operation on the electrified lines mentioned in the tender material (Sub-Appendix 03.02 - Operational Profile). 9. Lines illustrating Intercity and Regional traffic are listed in the tender material (Sub-Appendix 03.02 - Operational Profile). For information DSB expected routes and journey times are mentioned in the tender material (Sub-Appendix 03.03 - Routes and Driving Timings). Compatible with Infrastructure 10. The locomotives should be able to perform passenger operation on all Banedanmark’s electrified infrastructure (excluding S-bane). 11. The locomotives should be able to perform passenger operation on any additional electrical lines added to Banedanmark network (provided that this is TSI compliant or identical to already existing Banedanmark equipment). For lines reference is made to the tender material (Sub-Appendix 03.02 - Operational Profile). Maintenance: 12. Lease should include maintenance as a full service agreement including preventive and corrective maintenance, provision of all spares etc. Documentation should be made available to DSB as applicable, including relevant data from the Maintenance Management System (MSS) 13. It is anticipated that the Lessor will provide the maintenance facility to maintain the locomotives. The maintenance facility should be located in Denmark or in the Malmö region (Sweden). 14. Maintenance shall take place in a maintenance setup which is authorized according to ECM rules 15. The lessor or a subcontractor to the lessor should hold all ECM roles 1-4. 16. It is expected that DSB will deliver the locomotives for maintenance to the handover point at the maintenance facility. In the event the provided maintenance facility is located in the Malmö region, DSB will use a subcontractor of DSB for transporting the locomotives between the handover point at the Maintenance facility and DSB’s operational area in Denmark.

    • Contact

      Rikke Saaek Lindhardtrisl@dsb.dk
    • Type
      Result
    • Main code
      Railway and tramway locomotives and rolling stock and associated parts
      34600000
    • 34620000Rolling stock50222000Repair and maintenance services of rolling stock

    Similar active competitions

    • Banedanmark

      Reparasjon og vedlikehold

      Vedligehold af forsyning af kørestrøm og togforvarmestationer

      Banedanmark søger vedligeholdelsestjenester for forsyning af kørestrøm og togforvarmestationer på F-banen i Danmark, opdelt i to delaftaler for henholdsvis Vest (Jylland og Fyn) og Øst (Sjælland), med en maksimal totalværdi på 290.756.300 DKK over 8 år. Tjenesterne omfatter forebyggende og afhjælpende vedligeholdelse. Tildelingskriteriet er pris (100%). Der kræves en årlig omsætning på mindst 30 mio. DKK i de seneste tre regnskabsår, en gennemsnitlig soliditetsgrad på minimum 10% og positiv egenkapital i samme periode. Ansøgere skal desuden dokumentere mindst én reference med vedligehold af højspændingsanlæg til energiforsyning til en værdi af minimum 500.000 DKK inden for de seneste 5 år.

      Framework agreement with qualification
      Nov 2, 2026(4 days)
      DKK 290,756,300
    • SNCF Réseau SA

      Spesialisert jernbaneutstyr

      Marché LUCIE : Acquisitions Locomotives de moyenne puissance

      SNCF RESEAU a besoin d'acquérir des locomotives de moyenne puissance et leurs éléments de soutien (documentation de maintenance, pièces de rechange) dans le cadre d'un accord-cadre mono-attributaire à bons de commande d'une durée de 20 ans. L'engagement minimum est de 50 locomotives, avec un volume maximum de 150 locomotives. Ces locomotives, destinées à remplacer les BB69000 et BB69400 à partir de 2032, devront avoir une puissance minimale de 750 kW, atteindre une vitesse de 100 km/h, être dotées d'une chaîne de traction hybride thermique et batterie, respecter le gabarit G1 et peser au maximum 80 tonnes (20 tonnes par essieu).

      Framework agreement with qualification
      Nov 20, 2026(22 days)
    • Banedanmark

      Elektrisk infrastruktur og veibelysning

      Procurement of two traction transformers for Kassø substation

      Banedanmark needs two traction transformers of 23 MVA, 165/27.5 kV, designed for two-phase connection within a three-phase system, for Energinet’s 150 kV substation at Kassø in Sydjylland, Denmark. The contract, valued at a maximum of 25 million DKK over 20 months, includes the supplier's design, dimensioning, manufacture, factory testing, transport, unloading, installation, connection, site testing, and commissioning, along with associated services, documentation, spare parts, special tools, and training. The award criteria are Price (40%) and Time Schedule (60%). Qualification requirements include an average annual turnover of at least 15 million DKK over the last three financial years and the submission of up to five comparable references for the supply of traction transformers designed for two-phase connection or other power transformers designed for two-phase connection within the last ten years.

      Competition with qualification
      Nov 12, 2026(14 days)
      DKK 25,000,000