Lot F2 — Delivery of Emergency Power Supply System to DIN Forsyning Varme A/S
Planned
The competition has not been announced yet.
- Deadline
- Oct 23, 2020Expired
- Agreement
- Construction work
Brief
DIN Forsyning Varme A/S in Esbjerg, Denmark is in the process of replacing the heat delivered from the existing coal fired power station (ESV3) which is going out of operation 2023. DIN Forsyning Varme A/S has decided to establish new base load production capacity to replace the heat previously purchased from Ørsted A/S with new heat production facilities to be located in harbour area close to the existing peak load plant City Centralen and existing heat accumula-tor tank and distribution pumps. There will be established 60 MW wood chips fired heating boiler, 50 MW heat pump and expected 30 MW of electrical boiler. The present tender is for the Uninterrupted power supply system for emergency. The contract agreement is based on Green FIDIC Short Form of Contract First Edition 1999. DIN Forsyning Varme A/S intends to enter the contract with one contractor for the delivery of uninterrupted power supply system for emergency.
Kraftforsyning og reservestrøm
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at DIN Forsyning Varme A/S
From the notice
DIN Forsyning Varme A/S in Esbjerg, Denmark is in the process of replacing the heat delivered from the existing coal fired power station (ESV3) which is going out of operation 2023. DIN Forsyning Varme A/S has decided to establish new base load production capacity to replace the heat previously purchased from Ørsted A/S with new heat production facilities to be located in harbour area close to the existing peak load plant City Centralen and existing heat accumula-tor tank and distribution pumps. There will be established 60 MW wood chips fired heating boiler, 50 MW heat pump and expected 30 MW of electrical boiler. The present tender is for the Uninterrupted power supply system for emergency. The contract agreement is based on Green FIDIC Short Form of Contract First Edition 1999. DIN Forsyning Varme A/S intends to enter the contract with one contractor for the delivery of uninterrupted power supply system for emergency.
Contact
Laila Junckerkontakt@tohv.dk- PlanningType
- 45315300Main codeElectricity supply installations
- 31127000Emergency generator31682500Emergency electricity equipment31682530Emergency power supplies45310000Electrical installation work45311100Electrical wiring work45315100Electrical engineering installation works45317200Electrical installation work of transformers51111200Installation services of generators