Mary Immaculate College - Tailteann T2 Building Gym
Expired
The competition has expired without a winner being announced.
- Deadline
- Sep 7,Expired
- Procedure
- OpenSingle stage
Brief
Mary Immaculate College needs construction work for the Tailteann T2 Building Gym, with a maximum total value of 800,000 EUR over 1 year. The project involves the full removal of the gym floor and existing underfloor heating system, followed by a new build-up of screed and DPM. An existing storage room will be converted into an office, requiring new suspended ceiling, plasterboard walls, painting, and skirting. A new window and door will be installed in an existing wall, and the large gym door will be replaced. The cardio area will have its existing ceilings removed and a new suspended ceiling fitted. Electrical works include relocating the distribution board and replacing lighting. Mechanical works involve new air conditioning, including outdoor units and ducting.
Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Mary Immaculate College
From the notice
The full removal of the gym floor back to the original concrete slab, including the existing underfloor heating system, then new build-up of 55mm screed on new DPM. New high impact gym floor will then be done by others. Existing storage room to be converted into an office which involves new suspended ceiling, plasterboard walls, painting and skirting. Existing wall requires breaking through for a new window and door from the cardio area side. The large door to the gym will require removal, disposal and a new door fitted. The cardio area will have the existing two individual plasterboard and metal grid ceilings removed, then a new suspended ceiling fitted across the full room. Electrical works include the relocation of the existing distribution board from the corridor, into the new office and the removal and replacement of existing lighting. Mechanical works include new air conditioning works, including new outdoor units, new ducting
Contact
Michael.Keane@mic.ul.ie- CompetitionType
- 45210000Main codeBuilding construction work