Search
  • Search


Ireland: Tenders/Mayo County Council_1127/MCC Fahy GWS – Extension to Deerpark (Aghagower)
  1. Contract signed

    May 8, 12:00 AMMay 8, 2026 12:00 AM
  2. Result notice published

    May 8, 8:43 AMMay 8, 2026 8:43 AM

Brief

MCC Fahy GWS – Extension to Deerpark (Aghagower)

Awarded

The competition has ended and a winner has been selected.

Deadline
May 7,Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€66.3Kover 2 months

Brief

Mayo County Council_1127 has entered into an agreement with Winters Plant Hire Ltd for works to install 64mm and 25mm MDPE pipe along with various accessories, including multiple road and stream/river crossings where directional drilling is compulsory, to extend the Fahy GWS to capture an additional section of the townland called Deerpark near Aghagower. The contract has a duration of 2 months and a total value of 66,310 EUR. Six bids were received for this contract.

Bygg og anlegg - Grunnarbeid, vann og kloakk

Result

TED
  • Michael Marrey
    Winner
  • Number of tenders received
    6
  • Contract value
    €66,310

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Price Only

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Mayo County Council_1127

From the notice

  • Project to install both 64mm and 25mm MDPE pipe along with various accessories. Multiple road and stream/river crossings where directional drilling is compulsory. Extending Fahy GWS to capture an additional section of townland called Deerpark near Aghagower. Please refer to requirements brief for expanded details.

  • Contact

    procurement@mayococo.ie
  • Type
    Result
  • Location
    West
  • Main code
    Construction work for water projects
    45240000

Similar active competitions

  • Tooreen Aghamore GWS

    Rørlegger- og sanitærarbeid

    Tooreen Aghamore Group Water Supply Scheme - Water Meter Upgrade and Network Improvement Works Phase 2

    Tooreen Aghamore GWS needs water network improvement works in Ireland’s Western Region over 6 months, with a maximum contract value of €500,000. The works comprise replacing and installing water distribution pipelines, consumer water meters and bulk flow meters, including data loggers. The contract will be awarded to the most economically advantageous tender based on quality and price.

    Competition
    Dec 11, 2026(22 days)
    €500,000
  • New Inn Group Water Scheme 2

    Rørlegger- og sanitærarbeid

    New 1860 meters length of 200mm PE100, SDR11 Rising watermain in New Inn Village for New Inn gws plus work on existing 63mm PE80, SDR 11 watermain approx. 2.0km from New Inn Village

    New Inn Group Water Scheme 2 needs water-main construction works in Ireland, with a maximum total contract value of €350,000 and a 2-month duration. The project involves installing approximately 1,860 metres of 200 mm PE100 SDR11 rising water main in New Inn Village and carrying out work on approximately 2 km of the existing 63 mm PE80 SDR11 water main. The scheme supplies potable water to 350 houses, and the work is located in Ireland’s western region.

    Competition
    Nov 18, 2026(0 days)
    €350,000
  • Raheen Group Water Scheme

    Oppføring av bygninger

    Raheen Group Water Scheme Watermain Replacement

    Raheen Group Water Scheme needs works to replace approximately 2.3 km of existing watermain and install a new booster pump station, including ancillary works, in Ireland’s Mid-West region. The project has a maximum total value of €900,000 and a duration of 4 months.

    Competition
    Jan 29, 2027(71 days)
    €900,000