Modifications, construction of a new pumping station & accompanying infrastructure for the interconnection of Kozani district heating with the unified district heating network of Western Macedonia
- Deadline
- Nov 10,11 days left
- Procedure
- OpenSingle stage
Brief
The Municipal Water, Drainage & District Heating Company of Kozani needs construction and modification works for a district-heating interconnection project, with a maximum total contract value of €13.4 million and a 15-month duration. The works cover a new pumping station at the Kardia Thermal Power Plant site and upgrades to the existing Kasla pumping station, including pumps, heat exchangers, transformers, pipeline rerouting, auxiliary equipment, electrical works and automation with remote monitoring integrated into the existing control system. The upgraded system is intended to provide a nominal transmission capacity of 195 MWth, with works located in Grevena and Kozani. The contract will be awarded on lowest price, subject to a compliance review of the study. Bidders must meet Greek regulatory requirements for the relevant electrical/mechanical and building works categories, including specified staffing, equipment and experience requirements, and hold ISO 9001, ISO 14001 and ISO 45001 (or accepted equivalents).
Pumpestasjoner og pumpesystemer
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Qualification requirements
Description
For the Electrical and Mechanical Works category, economic operators must satisfy the requirements set out in paragraph 15 of Article 51 of Presidential Decree 71/2019. For the Building Works category, they must satisfy the requirements set out in paragraph 13 of Article 51 of Presidential Decree 71/2019. In the case of a group of economic operators (consortium), the above minimum requirements may be fulfilled collectively by all members of the group.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
For the Electrical and Mechanical Works category, economic operators must satisfy the minimum staffing requirements set out in paragraph 6 of Article 52 of Presidential Decree 71/2019. For the Building Works category, they must satisfy the minimum staffing requirements set out in paragraph 4 of Article 52 of Presidential Decree 71/2019. In the case of a group of economic operators (consortium), the above minimum requirements may be fulfilled collectively by all members of the group.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
For the Electrical and Mechanical Works category, economic operators must satisfy the minimum mechanical equipment requirements set out in paragraph 11 of Article 52 of Presidential Decree 71/2019 for the Fourth Class. In the case of a group of economic operators (consortium), the above minimum requirements may be fulfilled collectively by all members of the group.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
For the Electrical and Mechanical Works category, economic operators must satisfy the minimum experience requirements set out in point (e) of paragraph 2 of Article 53 of Presidential Decree 71/2019. For the Building Works category, they must satisfy the minimum experience requirements set out in point (c) of paragraph 2 of Article 53 of Presidential Decree 71/2019. In the case of a group of economic operators (consortium), the above minimum requirements may be fulfilled collectively by all members of the group.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Economic operators are required to be registered in the relevant professional register maintained in their country of establishment. In particular, tenderers established in Greece must be registered with the Register of Construction Contractors (M.E.EP.) for as long as the transitional provisions of Article 65 of Presidential Decree 71/2019 remain in force, or with the Register of Construction Enterprises for Public Works (MH.E.E.D.E.) from the date on which the latter enters into force, under the work category(ies) specified in Article 21 of the present document. Tenderers established in a Member State of the European Union must be registered in one of the professional or trade registers listed in Annex XI of Appendix A to Law 4412/2016.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Economic operators must hold ISO 9001:2015 Quality Management System certification, or an equivalent certification, with a scope of application relevant to the technical subject matter of the Contract. In the case of a group of economic operators (consortium), it shall be sufficient for the above requirements to be met by one member of the group. The Contracting Entity shall recognize equivalent certificates issued by certification bodies accredited by equivalent accreditation bodies established in other Member States, in accordance with Regulation (EC) No 765/2008. The Contracting Entity shall also accept other evidence of equivalent quality assurance measures where the economic operator concerned has not been able to obtain the relevant certificates within the prescribed time limits for reasons not attributable to it, provided that the economic operator demonstrates that the proposed quality assurance measures comply with the required quality assurance standards.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Economic operators must hold ELOT EN ISO 14001:2015 Environmental Management System certification, or an equivalent certification, with a scope of application relevant to the technical subject matter of the Contract. In the case of a group of economic operators (consortium), it shall be sufficient for the above requirements to be met by one member of the group. The Contracting Entity shall recognize equivalent certificates issued by certification bodies accredited by equivalent accreditation bodies established in other Member States, in accordance with Regulation (EC) No 765/2008. The Contracting Entity shall also accept other evidence of equivalent quality assurance measures where the economic operator concerned has not been able to obtain the relevant certificates within the prescribed time limits for reasons not attributable to it, provided that the economic operator demonstrates that the proposed quality assurance measures comply with the required quality assurance standards.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Description
Economic operators must hold ISO 45001:2018 Occupational Health and Safety Management System certification, or OHSAS 18001:2007 Occupational Health and Safety Management System certification, or an equivalent certification, with a scope of application relevant to the technical subject matter of the Contract. In the case of a group of economic operators (consortium), it shall be sufficient for the above requirements to be met by one member of the group. The Contracting Entity shall recognize equivalent certificates issued by certification bodies accredited by equivalent accreditation bodies established in other Member States, in accordance with Regulation (EC) No 765/2008. The Contracting Entity shall also accept other evidence of equivalent quality assurance measures where the economic operator concerned has not been able to obtain the relevant certificates within the prescribed time limits for reasons not attributable to it, provided that the economic operator demonstrates that the proposed quality assurance measures comply with the required quality assurance standards.
Documentation Requirement
Not specified.
Source
No source found in the documents. Check the requirement against the tender documents.
Award Criteria
Description
The criterion for awarding the contract is the most economically advantageous offer based only on price (lowest price) with a study evaluation. According to paragraph 4 of article 50, the evaluation of the study during the contract award procedure of the article in question concerns only the control of the completeness and the agreement of the study with the provisions of the contract documents and in particular with the Regulation on Project Studies, establishing the compliance or non-compliance of the study with them (compliance table) without scoring.
Source
No source found in the documents. Check the weight against the tender documents.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at MUNICIPAL WATER, DRAINAGE & DISTRICT HEATING COMPANY OF KOZANI
From the notice
The project concerns the construction of pumping station facilities for the interconnection of Kozani district heating with the new and under construction thermal energy production facilities within the Kardia Thermal Power Plant site through the new thermal energy transfer system under construction, consisting of pipes of nominal diameter DN700mm DN600mm DN450mm with hot/superheated water as the carrier. In detail, it concerns the construction of the following distinct facilities: Installations (pump stations and other equipment) for interconnection in a field granted to DEYAK within the Kardia Thermal Power Plant/PPC referred to as "KARDIAS PUMP STATION". The facilities to be implemented with the project include the following main equipment and works: Hot water circulation pumping station for the transport system. Hot water circulation pump station of the production system Heat exchangers for the hydraulic separation of the existing district heating transport systems DEYAK and production. Other auxiliary equipment (pressure regulation and expansion valve reception, water treatment and replenishment, filtration, addition of chemical additives, safety devices, energy meters, etc.) Connection of the new facilities with the existing or new facilities to be implemented (transport pipeline, production facilities) (water supply, sewage, strong and weak currents and others). Automation control and remote management system for the remote monitoring of the Kardias Pumping Station. The system will fully cooperate with the existing control/remote management system of the district heating facilities control center and will essentially be an extension of it. Installations-renovation works at the existing district heating pumping station in the Kasla area of Kozani (replacement of pumping units of pumping station A2 and other equipment, so that the pumping station meets the requirements of the new transmission system as well as modifications to the routing of the transmission pipelines within the pumping station site), hereinafter referred to as "KASLA PUMP STATION". The works mainly concern Replacement of the main pumping units of pumping station A2 with their accompanying works Replacement of existing transformers with new ones to cover the increased electrical power requirements due to the new equipment. Replacement of existing speed regulators of pumping units of pumping station A1. Modification of the routing of the pre-insulated pipelines of the transmission system within the district heating installation site. Redesign of the existing operational control automation system of the main pumping stations. Upgrading of the supply lines of strong and weak currents of the new pumping complexes. Control automation and remote management system for the remote monitoring of the Kardia Pumping Station (see above-Kardia Pumping Station) as well as the Drepano valve station. The system will fully cooperate with the existing control/remote management system of the district heating installation control center and will essentially be an extension of it. With the implementation of the installations, the nominal transmission capacity of the system will be 195MWth.
Contact
panousis.vasilios@deyakozanis.org- CompetitionType
- Grevena, KozaniLocation
- 45232152Main codePumping station construction work