New CT and ICU Extension - Connolly Hospital Blanchardstown
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
Bygg og anlegg - Helsevesen, tinghus og demning
Health Service Executive (HSE) needs construction services for a new CT and ICU extension at Connolly Hospital Blanchardstown over 14 months. The project involves building a three-storey extension including a new reception and waiting area for the radiology department, a new CT scanner suite, a new ICU facility with 4 segregated patient rooms and 1 isolation suite, and a dedicated plant room. The development requires local renovations and tie-ins with existing hospital buildings, including the emergency department, radiology department, theatres, and HDU, while maintaining live hospital services throughout construction.
About the bid
- Contact name
- Aisling Byrne
- Contact phone
- +35318131800
- Contact email
- aisling.byrne9@hse.ie
- Address
- Oak House, Millennium Park Naas Co. Kildare, RE Kildare
The new CT and ICU development at Connolly Hospital Blanchardstown forms an extension to the existing hospital and includes local renovations of the main hospital buildings where the new building connects to existing accommodation at ground and first floor level. The development is located on a constrained site which is enclosed on 3 sides by sensitive clinical accommodation including theatres, HDU, and Radiology. The hospital’s emergency department and blue light access route is located directly to the north of the site. Live hospital services must be maintained for the duration of construction. The development is comprised of 3 storeys as set out below: Ground Floor Level: The ground floor includes a new reception and waiting area for the hospital’s radiology department as well as administrative and support areas including offices, WCs and changing areas. The ground floor also includes a new CT scanner suite and associated control room and local plant space. The ground floor has a number of critical interfaces and tie-ins with existing buildings including the emergency department and existing radiology department. First Floor Level: The first floor of the proposed development provides a new ICU facility for the hospital which includes 4 no. segregated ICU patient rooms and 1 no. isolation suite as well as ancillary spaces and general support accommodation for staff and equipment. This floor will directly connect with the existing theatres and HDU by way of a high-level link which will require local reconfiguration of the Theatre and HDU departments and modification of existing building fabric similar to at ground floor level. Second Floor Level: The second floor contains an enclosed, dedicated plant room to serve the CT and ICU levels below. A new stair core and evacuation lift is proposed to serve all levels of the extension.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Found no award criteria in the contract notice.
Qualification requirements
Found no qualification requirements in the contract notice.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Health Service Executive (HSE)
- Title
- New CT and ICU Extension - Connolly Hospital Blanchardstown
- Type
- Main code
- Supplemental codes
- Location
- Dublin
- Estimated value
- €0.00
- Duration
- 14 months