    NSL3 FGTC - Flue Gas Tube Condenser and Condensate Treatments

    Tampereen Energia Oy

    NSL3 FGTC - Flue Gas Tube Condenser and Condensate Treatments

    1. Competition notice published

      Apr 13, 2022 8:00 AMApril 13, 2022 8:00 AM
    2. Express interest deadline

      May 2, 2022 10:00 AMMay 2, 2022 10:00 AM
    3. Qualification deadline

      Not stated
    4. Tender submission deadline

      May 2, 2022 10:00 AMMay 2, 2022 10:00 AM

    Brief

    Finland: Tenders/Tampereen Energia Oy/NSL3 FGTC - Flue Gas Tube Condenser and Condensate Treatments

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Qualification deadline
    May 2, 2022Expired
    Procedure
    With negotiationTwo stages
    Agreement
    Buying goodsover 17 months

    Brief

    Tampereen Sähkölaitos Oy is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will also renew the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. The Purchaser is named the project NSL3. This Contract Notice is published to purchase NSL3 FGTC (Flue Gas Tube Condenser and Condensate Treatments). The Supply consisting of the full process delivery of the flue gas tube condenser and condensate treatment systems containing all necessary auxiliary equipment, piping, instrumentation, electrification and cabling within the scope of the delivery.

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    Register interest

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      Alle betingelser for deltakelse er presentert i ESPD.

      Documentation Requirement

      ESPD

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Tampereen Energia Oy

    From the notice

    • Tampereen Sähkölaitos Oy is building a new CFB boiler plant to replace existing 200 MW NSL2 BFB boiler combusting forest biomass and peat plant in Naistenlahti, Tampere. The Purchaser will also renew the power plant’s solid fuel reception, screening, storage and conveyor equipment, as well as other necessary systems serving the new boiler plant. The Purchaser is named the project NSL3. This Contract Notice is published to purchase NSL3 FGTC (Flue Gas Tube Condenser and Condensate Treatments). The Supply consisting of the full process delivery of the flue gas tube condenser and condensate treatment systems containing all necessary auxiliary equipment, piping, instrumentation, electrification and cabling within the scope of the delivery.

    • Contact

      nsl3hankinnat@sahkolaitos.fi
    • Type
      Competition · Prequalification
    • Main code
      Heat-recovery systems
      44622000
    • 42996000Machinery for the treatment of sewage

    Similar active competitions

    • Lappeenrannan-Lahden teknillinen yliopisto LUT

      Industrimaskiner

      Circulating Fluidised Bed (CFB) reactor and Heat Recovery Steam Generator (HRSG) pilot plant

      Lappeenrannan-Lahden teknillinen yliopisto LUT needs a 100 kWth circulating fluidized bed (CFB) pilot plant and an attached heat recovery steam generator (HRSG) to be delivered, installed, tested, and commissioned in Etelä-Karjala, Finland. The CFB must be capable of combustion, gasification, and other reaction modes using various feedstocks and process gases, while the HRSG, located downstream, will operate as a once-through unit for steam generation and hot-gas cooling, designed and manufactured according to PED 2014/68/EU using Module G conformity assessment. The award criteria are Price (50%) and Quality (50%).

      Competition
      Nov 10, 2026(12 days)
    • AB Borlänge Energi

      Kjøle- og ventilasjonsteknologi

      Rening av rökgas, Bäckelund kraftvärmeverk

      AB Borlänge Energi behöver en fullt godkänd och driftsatt anläggning för rening av rökgas från avfallspanna P7 på Bäckelunds kraftvärmeverk i Dalarnas län, med en maximal totalvärde på 40 miljoner svenska kronor. Uppdraget omfattar rening av rökgas, utvinning av värmeenergi till fjärrvärmenätet, samt behandling av kondensat och annat uppsamlat vatten. I uppdraget ingår även byte av rökgasfläkt, nya rökgaskanaler, ny rökgaspipa, rivning av befintlig rökkanal och rökgaspipa, samt all tillkommande utrustning för mekanik, el och automation.

      Competition with qualification
      Nov 16, 2026(18 days)
      SEK 40,000,000
    • Bord na Móna PLC

      Oppføring av bygninger

      SC 07/25 - Open Cycle Gas Turbine (OCGT) and Combined Cycle Gas Turbine (CCGT) Qualification System

      Bord na Móna PLC in Ireland is establishing a Qualification System for the provision of Open Cycle Gas Turbine (OCGT) and Combined Cycle Gas Turbine (CCGT) works. This system is of indefinite duration, but is anticipated to apply for 10 years with an option to extend. The procurement covers Lot 1 – OCGT Supply OEM and LTSA, Lot 2 – OCGT Balance of Plant Constructor, Lot 3 – OCGT Engineering, Procurement and Construction (EPC) LTSA, and Lot 4 – CCGT Engineering, Procurement and Construction (EPC) + LTSA.

      Qualification system
      Oct 6, 2029(100+ days)