Pre-qualification for turnkey delivery of electric boiler to Nuijala heat station
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
- Qualification deadline
- Jun 26, 2023Expired
- Procedure
- Competitive dialogueTwo stages
- Agreement
- Buying goodsover 3 years
Brief
Fortum is planned to invest in Nuijala, Espoo with a new approx. 50-60 MW electric boiler, a 20,000 m3 district heat accumulator and DH pumping systems (the “Plant”). The Plant will store, produce, and deliver heat to Fortum district heating network in Espoo and Kirkkonummi. The Plant is designed to be operated remotely from the main control room at Suomenoja power plant (approx. 10 km from the Nuijala Plant). However, there will be a small local control room at the Plant for commissioning, start-up, maintenance, and trouble shooting. The design capacity of the electric boiler shall be 50-60 MW. However, at the beginning, the Plant will be connected into 20 kV grid that will limit the boiler capacity to max. 10 MW. A new grid connection at 110 kV to the Plant is planned to be completed a few years after the commissioning of the Plant. Thereafter, the boiler will be operated at design capacity. The boiler is designed to produce district heat independently without the heat accumulator or simultaneously parallel to the heat supply from the accumulator. In addition, the boiler is likely to be operated for heating the accumulator without connection to the district heating network (i.e. “isle mode”)
Industrimaskiner
Custom Assessment Criteria
Get answers to your bid/no-bid criteria
Set them up once and Cobrief answers them in every tender
Will you bid?
The agent sets up the bid and writes the first draft. Free for 14 days.
Previous winners
Who are you up against?
The suppliers who have won similar contracts at Fortum Power and Heat Oy
From the notice
Fortum is planned to invest in Nuijala, Espoo with a new approx. 50-60 MW electric boiler, a 20,000 m3 district heat accumulator and DH pumping systems (the “Plant”). The Plant will store, produce, and deliver heat to Fortum district heating network in Espoo and Kirkkonummi. The Plant is designed to be operated remotely from the main control room at Suomenoja power plant (approx. 10 km from the Nuijala Plant). However, there will be a small local control room at the Plant for commissioning, start-up, maintenance, and trouble shooting. The design capacity of the electric boiler shall be 50-60 MW. However, at the beginning, the Plant will be connected into 20 kV grid that will limit the boiler capacity to max. 10 MW. A new grid connection at 110 kV to the Plant is planned to be completed a few years after the commissioning of the Plant. Thereafter, the boiler will be operated at design capacity. The boiler is designed to produce district heat independently without the heat accumulator or simultaneously parallel to the heat supply from the accumulator. In addition, the boiler is likely to be operated for heating the accumulator without connection to the district heating network (i.e. “isle mode”)