    Procurement of 3 noise reduction silencers including installation for Fjernvarme Fyns waste incineration lines 11, 12 and 13

    FJERNVARME FYN AFFALDSENERGI A/S

    Procurement of 3 noise reduction silencers including installation for Fjernvarme Fyns waste incineration lines 11, 12 and 13

    1. Competition notice published

      Sep 16, 2025 10:04 AMSeptember 16, 2025 10:04 AM
    2. Result notice published

      Nov 14, 2025 10:28 AMNovember 14, 2025 10:28 AM
    3. Contract start date

      Apr 7, 12:00 AMApril 7, 2026 12:00 AM
    4. Contract end date

      Jun 26, 12:00 AMJune 26, 2026 12:00 AM

    Brief

    Denmark: Tenders/FJERNVARME FYN AFFALDSENERGI A/S/Procurement of 3 noise reduction silencers including installation for Fjernvarme Fyns waste incineration lines 11, 12 and 13

    Cancelled

    The competition has been cancelled.

    Qualification deadline
    Nov 13, 2025Expired
    Award
    Price 30% and 1 more
    Procedure
    With negotiationTwo stages
    Agreement
    Buying goods
    Estimated value
    DKK 6Muntil Jun 2026

    Brief

    Fjernvarme Fyn Affaldsenergi A/S har avlyst anskaffelsen av 3 støydempende lyddempere inkludert installasjon for avfallsforbrenningslinjene 11, 12 og 13 på Fyn, på grunn av endrede behov. Anskaffelsen hadde en estimert maksimal verdi på 6 millioner DKK. Det ble lagt vekt på teknisk løsning og ytelse (50%), pris (30%) og HMS (20%).

    Industrimaskiner

    Result

    TED
    • Reason for cancellation
      Besluttning av oppdragsgiveren på grunn av behovsendring
    • Number of bids
      2

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      Leverandørens egenkapital må være positiv (over null). Hvis søkeren baserer seg på kapasiteten til en eller flere enheter (f.eks. et morselskap, søsterselskap eller underleverandør) eller er en gruppe økonomiske aktører (f.eks. et konsortium), må informasjon om ESPD del IV.B også gis i et separat ESPD for hver av disse enhetene. Det er søkerens ansvar å sikre at minimumskravet om egenkapital oppfylles samlet gjennom konsolidering når søknaden er basert på kapasiteten til andre enheter eller hvis søkeren er en gruppe økonomiske aktører (f.eks. et konsortium).

      Documentation Requirement

      Søkeren må oppgi sin egenkapital (total egenkapital inkl. aksjekapital, reserver, revaluering, tilbakeholdt overskudd osv.) i samsvar med regnskapspraksis som gjelder for søkeren fra den senest tilgjengelige årsrapporten i ESPD del IV.B, 'Finansiell nøkkeltall'. Den senest tilgjengelige årsrapporten refererer til rapporten som er tilgjengelig på tidspunktet for [f.eks. søknadsfristen]. Som dokumentasjon vil oppdragsgiver be om den senest tilgjengelige årsrapporten(e).

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      For the evaluation of the sub-criteria the below should be enclosed. All sub-sub criteria’s (1,2 and 3) will be evaluated equally in the total evaluation of this criterion: 1) The tenderer should include a detailed description of the proposed technical solution (all 3 silencers), including specific details concerning the components, subcomponents and materials that will be included. Accordingly, the following elements should be described in detail: • A detailed description of the proposed technical solution (all 3 silencers), including specific details concerning the components, subcomponents and materials that will be included. • Physical dimensions for each silencer and the appropriate construction especially considering access to service and maintenance for each silencer. The evaluation of the “Technical solution and access to service and maintenance” will be based on the tenderer’s description, and the Contracting Authority will in this respect emphasize that it is a reliable and robust solution, with an appropriate design and size that provides an easy way of conducting service and maintenance on each of the silencers. An overall evaluation with no decimals will be made of this sub-sub-criterion. 2) Noise reduction As part of the evaluation, the tenderer must also state the guaranteed performance of the silencers in terms of noise reduction under current conditions. (See the attached noise measurement in the special conditions clause 3.1 and 3.2 and Annex G). The performance must be stated in Annex 3. The tenderer should also include the calculations and/or documentation for the stated noise reduction in Annex 3. It should be noted the guaranteed performance stated by the tenderer will be penalized in the contract, cf. Clause 6.1.1. The evaluation of noise reduction will be based on the stated level as offered by the tenderer for each silencer. The silencer with the lowest guaranteed dB will count for 50% of the evaluation of this sub-sub-criterion and the two other silencers will each count for 25% of the evaluation. If the same dB is offered on all 3 silencers they will all count the same. • A noise reduction level of 15.00 dB (Decibel) or higher will result in a score of 10 for this sub-sub criterion, whereas a performance level of 5.00 dB will result in a score of 0. In between these two points, scores will be given on the basis of linear interpolation. An offered performance level below 5.00 dB on any of the silencers will not be accepted and will result in the tender being considered as non-compliant. Example: Guaranteed noise reduction on Silencer 1: 9dB, Silencer 2: 10dB and silencer 3: 10 dB gives a weighed noise reduction of 9,50 dB (9,00 dB * 0,5 + 10,00 dB * 0,25 + 10,00 dB * 0,25 = 9,50 dB)which equals a score of 4,50 points. The overall evaluation will be given with 2 decimals. 3) Pressure loss over silencers As part of the evaluation the tenderer must also state the guaranteed performance of the silencers in terms of pressure loss over the silencers. The performance must be stated in Annex 3. The tenderer should also include the calculations and/or documentation for the stated noise reduction in Annex 3. It should be noted the guaranteed performance stated by the tenderer will be penalized in the contract, cf. Clause 6.1.1. The evaluation of pressure loss over the silencers will be based on the average pressure loss level as offered by the tenderer. • An average pressure loss of 0.00 mbar (Millibar) will result in a score of 10, whereas a pressure loss of 5.00 mbar will result in a score of 0. In between these two points scores will be given on the basis of linear interpolation. An offered level above 5.00 mbar on any of the lines will not be accepted and will result in the tender being considered as non-compliant,. This is also the case even if the average pressure loss is below 5.00 mbar. Example: Guaranteed pressure loss on Silencer 1: 1,00 mbar, Silencer 2: 1,75 mbar and silencer 3: 2,50 mbar gives an average pressure loss of 1,75 mbar which equals a score of 6,50 points. The overall evaluation will be given with 2 decimals.

      Sub-criteria

      • Technical solution and access to service and maintenance33%

        The tenderer should include a detailed description of the proposed technical solution (all 3 silencers), including specific details concerning the components, subcomponents and materials that will be included. Accordingly, the following elements should be described in detail: • A detailed description of the proposed technical solution (all 3 silencers), including specific details concerning the components, subcomponents and materials that will be included. • Physical dimensions for each silencer and the appropriate construction especially considering access to service and maintenance for each silencer.

        Evaluation Method: The evaluation of the “Technical solution and access to service and maintenance” will be based on the tenderer’s description, and the Contracting Authority will in this respect emphasize that it is a reliable and robust solution, with an appropriate design and size that provides an easy way of conducting service and maintenance on each of the silencers. An overall evaluation with no decimals will be made of this sub-sub-criterion.

      • Noise reduction33%

        As part of the evaluation, the tenderer must also state the guaranteed performance of the silencers in terms of noise reduction under current conditions. (See the attached noise measurement in the special conditions clause 3.1 and 3.2 and Annex G). The performance must be stated in Annex 3. The tenderer should also include the calculations and/or documentation for the stated noise reduction in Annex 3. It should be noted the guaranteed performance stated by the tenderer will be penalized in the contract, cf. Clause 6.1.1.

        Evaluation Method: The evaluation of noise reduction will be based on the stated level as offered by the tenderer for each silencer. The silencer with the lowest guaranteed dB will count for 50% of the evaluation of this sub-sub-criterion and the two other silencers will each count for 25% of the evaluation. If the same dB is offered on all 3 silencers they will all count the same. A noise reduction level of 15.00 dB (Decibel) or higher will result in a score of 10 for this sub-sub criterion, whereas a performance level of 5.00 dB will result in a score of 0. In between these two points, scores will be given on the basis of linear interpolation. An offered performance level below 5.00 dB on any of the silencers will not be accepted and will result in the tender being considered as non-compliant. Example: Guaranteed noise reduction on Silencer 1: 9dB, Silencer 2: 10dB and silencer 3: 10 dB gives a weighed noise reduction of 9,50 dB (9,00 dB * 0,5 + 10,00 dB * 0,25 + 10,00 dB * 0,25 = 9,50 dB)which equals a score of 4,50 points. The overall evaluation will be given with 2 decimals.

      • Pressure loss over silencers33%

        As part of the evaluation the tenderer must also state the guaranteed performance of the silencers in terms of pressure loss over the silencers. The performance must be stated in Annex 3. The tenderer should also include the calculations and/or documentation for the stated noise reduction in Annex 3. It should be noted the guaranteed performance stated by the tenderer will be penalized in the contract, cf. Clause 6.1.1.

        Evaluation Method: The evaluation of pressure loss over the silencers will be based on the average pressure loss level as offered by the tenderer. An average pressure loss of 0.00 mbar (Millibar) will result in a score of 10, whereas a pressure loss of 5.00 mbar will result in a score of 0. In between these two points scores will be given on the basis of linear interpolation. An offered level above 5.00 mbar on any of the lines will not be accepted and will result in the tender being considered as non-compliant,. This is also the case even if the average pressure loss is below 5.00 mbar. Example: Guaranteed pressure loss on Silencer 1: 1,00 mbar, Silencer 2: 1,75 mbar and silencer 3: 2,50 mbar gives an average pressure loss of 1,75 mbar which equals a score of 6,50 points. The overall evaluation will be given with 2 decimals.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The Contracting Authority assigns points for “Price” as follows: Price is scored on a linear scale from 0 to 10. The tender with the lowest total price will be given the highest score, 10. The lowest total price is understood as the lowest calculated total price based on the Tenderlist (Annex 2) among all compliant tenders. All other tenders are then scored on a linear scale, using the initial interpolation percentage, cf. the table 1 below, and as a result the tender with the lowest total price will be given the score 10 and a tender which is 50 % higher will be given the score 0. If 1 or more of the compliant tenders comprise a total price which is higher than the initial percentages stated in the table 1 below, The Contracting Authority will use the alternative linear scale with the same scores, but with a greater span. As a result, the span will be set at the actual difference in percentage between the lowest calculated total price among all compliant tenders and the highest calculated total price among all compliant tenders. The Contracting Authority will not expand beyond the stated maximum in Alternative 1 and as a result tenders which comprise a total price which is equal to or higher than this percentage will be scored 0. All scores from 0-10 may be used (including decimals). Table 1 – Interpolation percentage, inclusive alternative Initial interpolation percentage: +50 % Alternative 1 percentage(s): Highest compliant total price percentage above 50 % but below 75 % (maximum)

      Evaluation Method

      Price is scored on a linear scale from 0 to 10. The tender with the lowest total price will be given the highest score, 10. The lowest total price is understood as the lowest calculated total price based on the Tenderlist (Annex 2) among all compliant tenders. All other tenders are then scored on a linear scale, using the initial interpolation percentage, cf. the table 1 below, and as a result the tender with the lowest total price will be given the score 10 and a tender which is 50 % higher will be given the score 0. If 1 or more of the compliant tenders comprise a total price which is higher than the initial percentages stated in the table 1 below, The Contracting Authority will use the alternative linear scale with the same scores, but with a greater span. As a result, the span will be set at the actual difference in percentage between the lowest calculated total price among all compliant tenders and the highest calculated total price among all compliant tenders. The Contracting Authority will not expand beyond the stated maximum in Alternative 1 and as a result tenders which comprise a total price which is equal to or higher than this percentage will be scored 0. All scores from 0-10 may be used (including decimals).

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For the evaluation of the sub-criteria the following should be enclosed: The tenderer should include a detailed HSE-plan and RAMS (Risk Assessment and Method Statements) specifically for the tendered assignment, including detailed descriptions of risk management, on-site supervision, inspections and audits. The evaluation will be based on the submitted HSE-plan and RAMS (Risk Assessment and Method Statements) for the specific project. It will be evaluated positive that the tenderer submits a proactive and detailed HSE-plan and RAMS for this specific assignment which - considering the complexity and scope - covers: • Detailed description of how risk assessments for the specific scope of work (health and safety) are conducted to ensure that risks are eliminated rather than mitigated, including identification of risks identified for the scope of work (dismantling and preparation for assembly including working at height etc.) • Detailed method statements which are relevant, safe to work by and show knowledge of the scope of work, especially considering dismantling and assembly of larger prefabricated parts (flue gas ducts, supports, insulation work etc.) An overall evaluation with no decimals will be made of this sub-criterion.

      Evaluation Method

      The evaluation will be based on the submitted HSE-plan and RAMS (Risk Assessment and Method Statements) for the specific project. It will be evaluated positive that the tenderer submits a proactive and detailed HSE-plan and RAMS for this specific assignment which - considering the complexity and scope - covers: * Detailed description of how risk assessments for the specific scope of work (health and safety) are conducted to ensure that risks are eliminated rather than mitigated, including identification of risks identified for the scope of work (dismantling and preparation for assembly including working at height etc.) * Detailed method statements which are relevant, safe to work by and show knowledge of the scope of work, especially considering dismantling and assembly of larger prefabricated parts (flue gas ducts, supports, insulation work etc.) An overall evaluation with no decimals will be made of this sub-criterion.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at FJERNVARME FYN AFFALDSENERGI A/S

    From the notice

    • The Contracting Authority wants to procure 3 new silencers placed in front of the stack to get a noise reduction if we run through or bypass the fluegas condesations units. The procurement is conducted as a negotiated procedure with prior call for competition pursuant to the EU Utilities Directive (Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC).

    • Contact

      Asbjørn Kjærgaardx-askj@fjernvarmefyn.dk
    • Type
      Result · Prequalification
    • Location
      Fyn
    • Main code
      Industrial or laboratory furnaces, incinerators and ovens
      42300000
    • 42390000Parts of furnace burners, furnaces or ovens45300000Building installation work

    Similar active competitions

    • Vestegnens Kraftvarmeselskab I/S

      Dynamisk indkøbssystem for entreprenørydelser

      Det dynamiske indkøbssystem indenfor entreprenørydelser indeholder allerede rør- og anlægsarbejder samt kundeinstallationer. Dette udbud vedrører udbud af én ekstra kategori til dette dynamiske indkøbssystem: Kategori 7: Levering og montering af muffer. Ydelserne på denne kategori omfatter eksempelvis, men ikke begrænset til: - demontering af eksisterende muffer, levering og montering af nye muffer inklusive isolering - levering, montering og dokumenteret indmåling af retableret lækagesystemet i henhold til VEKS-standarder - indhentning af alle nødvendige tilladelser, koordinering med myndigheder og bygherre eller dennes rådgiver. Det dynamiske indkøbssystem er således efter afslutningen af dette udbud opdelt i 7 kategorier: Kategori 1: Rørarbejder og anlægsarbejder, arbejder op til 4 mio. kr. Kategori 2: Rørarbejder og anlægsarbejder, arbejder over 4 mio. kr. Kategori 3: Kundeinstallationer, små installationer op til 200 kW Kategori 4: Kundeinstallationer, store installationer over 200 kW Kategori 5: Levering af fjernvarmeunits Kategori 6: Montering af fjernvarmeunits Kategori 7: Levering og montering af muffer. Udbuddet vedrører ALENE oprettelse af kategori 7. Der kan anmodes om optagelse på denne kategori 7. De øvrige kategorier (kategori 1-6) har allerede været udbudt, og der kan løbende anmodes om optagelse på disse.

      Dynamic purchasing system
      Oct 29, 2041(100+ days)
      DKK 12,000,000
    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification system
      Dec 16, 2028(100+ days)
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(4 days)
      €30,442,953