Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723
Diverse konstruksjonsmateriell
Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.
About the bid
- Contact name
- Procurement- A
- Contact phone
- 70102244
- Contact email
- procurement@energinet.dk
- Address
- Tonne Kjærsvej 65, 7000 Fredericia
The Contracting Authority wants to purchase complete glass insulator strings. For further details regarding the purchase, reference is made to the tender documents: Appendix 2A scope of works for powerlines and 2B Scope of work for substations. The tendered framework agreement has a duration of four (4) years. The framework agree-ment can be extended two (2) times for two (2) years each time. The framework agreement is divided into the following lots: • Lot 1: Complete glass insulator strings for powerlines. Expected consumption to be: EUR 10.000.000. Maximum value is EUR 24.000.000 • Lot 2: Complete glass insulator strings for substations. Expected consumption to be: EUR: 2.684.563,75. Maximum value is EUR 6.442.953,00 euro. Tenders can be submitted for all Lots. Tenderers are not required to submit a tender for both lots Offers can be submitted for all partial agreements The estimated consumption during the term of the framework agreement is expected to amount to be divided into lots. The consumption figures are estimates only and are consequently not binding for the Contract-ing Authority. During the specified period, the Contracting Authority has the right to purchase the services and/or goods comprised by the framework agreement from the selected tenderer but is not obligated to do so cf. the framework sec. 1.3.Main features of the procedureTender with negotiation - The tenders submitted must be valid for a period of six (6) months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders. .
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Description
Prices must be stated in the attached Price List and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List.
Evaluation Method
When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List.
Description
The tenderer must include documentation of fulfillment and a list of reservations to appendix 2A and 2B. The clarification should be explicit and with explanation as to why the clarification is made. In the evaluation of 'Solution description', Energinet will emphasize the following: Considering the scope and content of the tendered contract the Contracting Authority will focus on to what extend the submitted ensures delivery of high performing, well designed and robust. Besides, Specifications in the technical requirements, the elements listed below are of particular importance: Visual impact from the insulator string design (Drawings of each string type), The proposed complete string design shall be based on proven design solutions with documented long-term operational experience, Examples of documented results from design tests, type tests, and sample tests, Document with handling instructions, Example of labeling of all parts, Description of outside storage in all weather conditions, Report demonstrating the strings meet the requirement for a minimum corona extinction voltage of 300 kV, based on the voltage gradient method. It will impact the evaluation positively to the extent the technical description/solution including supporting documents are detailed, thorough and precise. An overall evaluation will be made of the solution description.
Evaluation Method
In the evaluation of 'Solution description', Energinet will emphasize the following: Considering the scope and content of the tendered contract the Contracting Authority will focus on to what extend the submitted ensures delivery of high performing, well designed and robust. Besides, Specifications in the technical requirements, the elements listed below are of particular importance: Visual impact from the insulator string design (Drawings of each string type), The proposed complete string design shall be based on proven design solutions with documented long-term operational experience, Examples of documented results from design tests, type tests, and sample tests, Document with handling instructions, Example of labeling of all parts, Description of outside storage in all weather conditions, Report demonstrating the strings meet the requirement for a minimum corona extinction voltage of 300 kV, based on the voltage gradient method. It will impact the evaluation positively to the extent the technical description/solution including supporting documents are detailed, thorough and precise. An overall evaluation will be made of the solution description.
Description
Delivery time must be stated in the attached tender list. When evaluating 'Delivery time', Energinet will evaluate the delivery time in the tender list. The Tenderer shall state the lead time, expressed in calendar weeks, for a typical order consisting of: 300 suspension strings; and 30 tension strings. The stated lead time shall be used for evaluation purposes.
Evaluation Method
Lead time will be evaluated using a linear scoring model, where: 20 weeks = 10 points, 40 weeks = 5 points, 60 weeks = 0 points. Scores for lead times between 20 and 60 weeks will be calculated by linear interpolation. Lead times shorter than 20 weeks will receive the maximum score of 10 points, while lead times longer than 60 weeks will receive 0 points.
Qualification requirements
Description
Egenkapital fra siste årsrapport må på tidspunktet for innlevering av tilbud være minst 2 500 000 EUR.
Documentation Requirement
Søkeren må bekrefte økonomisk evne i ESPD del IV.B med informasjon fra siste årsrapport angående egenkapital (total egenkapital inkl. aksjekapital, reserver, revaluering, tilbakeholdt overskudd osv.). Hvis søkeren baserer seg på kapasiteten til andre enheter eller søkeren er en gruppe økonomiske aktører, må informasjonen for ESPD del IV.B også gis i et separat ESPD fra hver av disse enhetene.
Description
Egenkapitalandelen fra siste årsrapport må på tidspunktet for prekvalifisering være minst 20 %. Hvis egenkapitalandelen er mellom 15 % og 20 %, kan søkeren kvalifisere dersom egenkapitalen overstiger 7 500 000 EUR.
Documentation Requirement
Søkeren må bekrefte økonomisk evne i ESPD del IV.B med informasjon fra siste årsrapport angående egenkapitalandel (egenkapital/totale eiendeler). Dette må oppgis med to desimaler. Hvis søkeren baserer seg på kapasiteten til andre enheter eller søkeren er en gruppe økonomiske aktører, må informasjonen for ESPD del IV.B også gis i et separat ESPD fra hver av disse enhetene.
Description
Søkeren skal fremlegge tre (3) til fem (5) mest sammenlignbare og relevante referanser utført de siste fem (5) årene. Med «utført de siste 5 årene» menes at referansen ikke må være fullført før datoen som nås når man teller fem (5) år tilbake fra innleveringsdatoen for prekvalifisering. Referanser eldre enn dette vil ikke bli tatt i betraktning. Referanser som ennå ikke er fullført, kan inkluderes som en del av søknaden, men søkeren må beskrive de delene som ennå ikke er levert, og dette kan påvirke evalueringen av søkeren. Minst én referanse må demonstrere levering av glassisolatorer for bruk i et transmisjonsnett med et spenningsnivå på minst 132 kV.
Documentation Requirement
Referansene kan fylles ut i ESPD del IV.C. Referansene kan inkludere en beskrivelse av arbeidet med glassisolatorer og angi om leveransen dekket hele isolatorstrengen (glassisolatorer og beslag) eller om glassisolatorene og beslagene ble levert separat, og inkludere: Mengde (sammenlignbar med mengdene spesifisert i Vedlegg 3A – Prisliste transformatorstasjoner og Vedlegg 3B – Prisliste kraftledninger), Kontraktsverdi (omtrent tilsvarende verdien av den nåværende kontrakten, der det er mulig), Værforhold (referanseprosjektene bør være lokalisert i områder med vær- og miljøforhold som er sammenlignbare med de i Danmark. Beskriv relevante forhold der det er aktuelt), Land (spesifiser landet der referanseprosjektet ble utført), Kundereferanse (navn på mottaker/kunde, inkludert navn på kontaktperson og deres kontaktdetaljer (e-postadresse og telefonnummer)), Prosjektets tidslinje (dato for kontraktsinngåelse/oppstart og dato for endelig levering (dag, måned, år)). Hvis søkeren baserer seg på kapasiteten til andre enheter eller er en del av en gruppe økonomiske aktører, må informasjonen om ESPD del IV.C sendes inn i separate ESPD-er for hver enhet. Maksimalt fem (5) referanser skal sendes inn. Hvis flere enn fem (5) referanser sendes inn, vil oppdragsgiver be søkeren om å avklare hvilke fem (5) referanser som skal inkluderes.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Energinet Eltransmission A/S
- Title
- Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723
- Type
- Main code
- Supplemental codes
- Estimated value
- €30,442,953.00
- Duration
- 8 years
No supplemental codes from buyer…