    Denmark: Tenders/Energinet/Purchase of Sleeves, Split Tees incl. Hot Tapping and Stopple Services and Methane Re-compression Services - 25/18597
    1. Competition notice published

      Aug 31, 10:55 AMAugust 31, 2026 10:55 AM
    2. Change in competition

      Sep 25, 6:12 AMSeptember 25, 2026 6:12 AM
    3. Qualification deadline

      Sep 30, 10:00 AMSeptember 30, 2026 10:00 AM
    4. Tender submission deadline

      Comes with the invitation
    5. Contract start date

      Mar 1, 2027 12:00 AMMarch 1, 2027 12:00 AM

    Brief

    Purchase of Sleeves, Split Tees incl. Hot Tapping and Stopple Services and Methane Re-compression Services - 25/18597

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Qualification deadline
    Sep 30,Expired
    Award
    Price LOT 1 20% and 5 more
    Procedure
    With negotiationTwo stages
    Agreement
    Framework agreement
    Estimated value
    €26.3Mover 8 years

    Brief

    Energinet needs services related to the oil and gas industry, divided into two lots, for an 8-year framework agreement with a maximum total value of 26.25 million EUR. Lot 1 involves the purchase of sleeves, split tees including hot tapping and stopple services, while Lot 2 covers methane re-compression services. The services are intended to support operations, maintenance activities, and projects for Energinet's gas-related infrastructure and facilities, primarily for Energinet Gastransmission A/S and Gas Storage Denmark A/S, and potentially Energinet Brint A/S. For Lot 1, award criteria are Price (20%), Solution description (20%), Delivery Time (5%), and Contract Terms (5%). For Lot 2, award criteria are Price (20%), Solution Description (25%), and Contract Terms (5%). Qualification requirements for Lot 1 include an equity of at least 1,500,000 EUR and an equity ratio of at least 15%. For both lots, applicants must submit up to five comparable and relevant references from the past five years, detailing experience with hot tapping operations, stopple operations, stopple insulation, or a combination of these for Lot 1, and for both lots, a detailed description of the works carried out, including pressure, pipe diameter, bypass diameter, and duration of operation.

    Reparasjon og vedlikehold

    Register interest

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      Equity from the latest annual report must, at the time of pre-qualification, be at least 1.500.000 EUR.

      Documentation Requirement

      The applicant must confirm the economic ability in the ESPD part IV.B with information from the latest annual report regarding Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.). If the applicant relies on the capacities of other entities (e.g., an affiliated company or a sub-contractor) or the applicant is a group of economic operators (e.g., a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities. In this context it will be sufficient that one of the entities fulfils the standards required in isolation or that the applicant, including the capacity of other entities, or a group of economic operators fulfils it jointly.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Equity ratio from the latest annual report must, at the time of prequalification, be at least 15 pct.

      Documentation Requirement

      The applicant must confirm the economic ability in the ESPD part IV.B with information from the latest annual report regarding Equity ratio (equity/total assets). This must be stated with two decimals. If the applicant relies on the capacities of other entities (e.g., an affiliated company or a sub-contractor) or the applicant is a group of economic operators (e.g., a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities. In this context it will be sufficient that one of the entities fulfils the standards required in isolation or that the applicant, including the capacity of other entities, or a group of economic operators fulfils it jointly.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      The references should describe purchase of sleeves and split tees incl. hot tapping and stopple operations, and include: • A specific description for each reference, including: • A description of the Works carried out for each delivery/job. The applicant must strive for a level of detail which enables the Contracting Authority to form an impression of the tenderer’s ability to fulfil requirements comparable to the tendered assignment in Appendix 2 for LOT 1 - ex in volume and scope. • Works performed demonstrating experience with;  Hot tapping operations  Stopple operations  Stopple insulation  Or a combination of these • Description of the following data regarding the performed operations:  Pressure  Pipe diameter  Bypass diameter  Duration of the operation in days • Delivery of sleeves and split tees incl. description of:  Amount of units • Contract value (if possible) • Customer/entity (including contact person) • Date of initiation and final delivery for the specific Works/job – not project (day, month, year)

      Documentation Requirement

      The applicant is allowed to submit up to five (5) most comparable and relevant references undertaken in the past five (5) years as part of the application for each LOT. By "undertaken in the past five (5) years” implies that the reference must not have been completed prior to the date reached when counting five (5) years backwards from the submission date for prequalification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, however the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section 2.3. Any ambiguities and/or incomprehensibility may have a negative effect on the selection of applicants. Please note the “description” box in ESPD part IV.C. can contain more text than is visible and it is possible to copy paste text into the box. The Contracting Authority has attached “Template 4: Optional Response Sheet for ESPD references” for filling out the references in instead of in the ESPD. The applicant is encouraged to use the template, but it is not a requirement. References are to be filled out only in one form – the ESPD itself or the template. If references are filled out both in ESPD and in template, only the references in the ESPD itself will be taken into consideration. If the applicant is relying on the capacity of other entities or the applicant is a group of economic operators, the maximum number of references to be submitted must still be respected and cannot exceed five (5) for each LOT when combined. If more are submitted, the Contracting Authority will only consider the most recent references determined by date of final delivery, in this case not yet finished references will not be included. If the applicant relies on other entities’ capacity or is part of a group of economic operators the information concerning ESPD part IV.C must be submitted to separate ESPD’s for each entity.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      The tender should include a detailed and specific solution description for the tendered assignment, cf. Appendix 2: Scope of Works LOT 2. Further the solution description should include: 1. A detailed HSE Plan and RAMS (Risk Assessment and Method Statements) specifically for the tendered assignment. 2. A detailed inspection report with a description of inspection of all equipment necessary for the Service, including Place and date of inspection and Status for equipment. 3. A description of technical training requirements for all operators/crews, cf. Appendix 2, section 13. 4. A Technical & Cost proposal related to the Works in the Base Case described in Appendix A to the Scope of Works LOT 2, focusing on: A Technical & Cost proposal, as described in section 8.2 of the Scope of Works LOT 2; A process description for setting up and dismantling of equipment on site. Response must be filled out in Template 5: Mandatory Response Sheet for Solution Description and Delivery Time.

      Evaluation Method

      The Contracting Authority will evaluate the proposed solution description in relation to the scope and complexity of the tendered assignment, cf. Appendix 2: Scope of Works LOT 2. That is to which extent the detailed solution description demonstrates a high level of ability to identify relevant activities and challenges and proposes appropriate and project specific methods, tools, and processes for managing such, especially concerning:

      1. It will be evaluated positively if the Tenderer submits a proactive and detailed HSE Plan and RAMS for this specific assignment which, taking account of the complexity of the scope, describes how health and safety risks for the Works are assessed to ensure that risks are eliminated rather than mitigated, including identification of the five (5) most significant risks for the Works.
      2. It will be evaluated positively if there is a structured procedure for inspection of the tools at Supplier’s base – prior to shipment to Denmark. It will be evaluated positively if the inspection procedure ensures that all equipment is in working condition before the Service is initiated.
      3. It will be evaluated positively if the description demonstrates a well-structured procedure for conducting task-specific training and instruction of operators and crews, ensuring that all statutory and necessary training and instruction is completed before the operators and crews arrive on site.
      4. It will be evaluated positively if the Technical & Cost proposal contains a well-structured and detailed description of the Works and includes drawings relevant for the identified Works and equipment. It will be evaluated positively if the process description sets out a clear process for setting up and dismantling equipment in the most time-efficient manner.
        An overall evaluation will be made of this sub-criterion. A minimum score of four (4) must be achieved for the tender to be compliant, cf. section 3.7.1.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Prices must be stated in the attached Appendix 3: Price List LOT 1 and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will evaluate (for evaluation purposes) the following cells in the Evaluation Sheet of the Price List; Cell D5 - the total cost of Split Tees (Items 1.1-1.11 in Components Sheet), Cell D6 - the total cost of Full Encirclement Repair Sleeves (Items 2.1-2.11 in Components Sheet), Cell D7 - the total cost of Standard Service Packages (Items 3.1-3.11 in Services Sheet), Cell D8 - the total cost of Standby Days (Items 4.1-4.11 in Services Sheet), Cell D9 - the total cost of Additional Operations and Additional Work (Items 5.1-5.6 in Services Sheet), Cell D10 - the total cost of Inline Isolation Services (Items 6.1-6.11 in Services Sheet) and D11 - the total cost of Initial Order (Items 7.1-7.16/7.TOTAL in Initial Order Sheet) separately.

      Evaluation Method

      The weighing of each price element of the total price score is:

      • Split Tees (15%)
      • Full Encirclement Repair Sleeves (5%)
      • Standard Service Packages (15%)
      • Standby Days (5%)
      • Additional Operations and Additional Work (5%)
      • Inline Isolation Services (5%)
      • Initial Order (50%)

      Sub-criteria

      • Initial Order50%

        The total cost of Initial Order (Items 7.1-7.16/7.TOTAL in Initial Order Sheet).

      • Split Tees15%

        The total cost of Split Tees (Items 1.1-1.11 in Components Sheet).

      • Standard Service Packages15%

        The total cost of Standard Service Packages (Items 3.1-3.11 in Services Sheet).

      • Full Encirclement Repair Sleeves5%

        The total cost of Full Encirclement Repair Sleeves (Items 2.1-2.11 in Components Sheet).

      • Standby Days5%

        The total cost of Standby Days (Items 4.1-4.11 in Services Sheet).

      • Additional Operations and Additional Work5%

        The total cost of Additional Operations and Additional Work (Items 5.1-5.6 in Services Sheet).

      • Inline Isolation Services5%

        The total cost of Inline Isolation Services (Items 6.1-6.11 in Services Sheet).

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The tender should include a detailed and specific solution description for the tendered assignment, cf. Appendix 2: Scope of Works LOT 1. Further the solution description should include: 1. A detailed inspection report with a description of inspection of all equipment necessary for the Service, including Place and date of inspection and Status for equipment. 2. A description of technical training requirements for all operators/crews, cf. Appendix 2, section 14. 3. A Technical & Cost proposal related to the Works in the Base Case described in Appendix A to the Scope of Works LOT 1, focusing on: A Technical & Cost proposal, as described in section 8.3 of the Scope of Works LOT 1; A process description for setting up and dismantling of equipment on site; A detailed HSE Plan and RAMS (Risk Assessment and Method Statements) specifically for the tendered assignment. Response must be filled out in Template 5: Mandatory Response Sheet for Solution Description and Delivery Time.

      Evaluation Method

      The Contracting Authority will evaluate the proposed solution description in relation to the scope and complexity of the tendered assignment, cf. Appendix 2: Scope of Works LOT 1. That is to which extent the detailed solution description demonstrates a high level of ability to identify relevant activities and challenges and proposes appropriate and project specific methods, tools, and processes for managing such, especially concerning:

      1. It will be evaluated positively if there is a structured procedure for inspection of the tools at Supplier’s base – prior to shipment to Denmark. It will be evaluated positively if the inspection procedure ensures that all equipment is in working condition before the Service is initiated.
      2. It will be evaluated positively if the description demonstrates a well-structured procedure for conducting task-specific training and instruction of operators and crews, ensuring that all statutory and necessary training and instruction is completed before the operators and crews arrive on site.
      3. It will be evaluated positively if the Technical & Cost proposal contains a well-structured and detailed description of the Works and includes drawings relevant for the identified Works and equipment. It will be evaluated positively if the process description sets out a clear process for setting up and dismantling equipment in the most time-efficient manner. It will be evaluated positively if the Tenderer submits a proactive and detailed HSE Plan and RAMS for this specific assignment which, taking account of the complexity of the scope, describes how health and safety risks for the Works are assessed to ensure that risks are eliminated rather than mitigated, including identification of the five (5) most significant risks for the Works.
        An overall evaluation will be made of this sub-criterion. A minimum score of four (4) must be achieved for the tender to be compliant, cf. section 3.7.1.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Prices must be stated in the attached Appendix 3: Price List LOT 2 and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR. When evaluating 'Price', the Contracting Authority will evaluate (for evaluation purposes) the following cells in the Evaluation Sheet of the Price List; Cell D5 - the total cost of Methane Re-compression Service (Item 1.1), Cell D6 - the total cost of Standby Days (Item 2.1) and Cell D7 - the total cost of Additional Work (Items 3.1-3.4) separately.

      Evaluation Method

      The weighing of each price element of the total price score is:

      • Methane Re-compression Service (70%)
      • Standby Days (15%)
      • Additional Work (15%)

      Sub-criteria

      • Methane Re-compression Service70%

        The total cost of Methane Re-compression Service (Item 1.1).

      • Standby Days15%

        The total cost of Standby Days (Item 2.1).

      • Additional Work15%

        The total cost of Additional Work (Items 3.1-3.4).

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For the evaluation of the sub-criterion the Tenderer must state the Offered Delivery Time for the Initial Order in accordance with section 1.5.2 and the Price List LOT 1. The Offered Delivery Time must be stated as a whole number of calendar weeks and must cover the period from entering into the Agreement on the Initial Order until delivery of all Components included in the Initial Order. Response must be filled out in Template 5: Mandatory Response Sheet for Solution Description and Delivery Time.

      Evaluation Method

      The sub-criterion "Delivery Time" will be evaluated based on the Tenderer's offered delivery time for the Initial Order as described in section 1.5.2. The evaluation will be based on the whole number of calendar weeks stated by the Tenderer in Template 5: Mandatory Response Sheet for Solution Description and Delivery Time (doc. no. 25/18597-37).
      An Offered Delivery Time of 18 weeks or less is awarded a score of 10, whereas an Offered Delivery Time of 35 is awarded a score of 0. Additional points are awarded by using a linear interpolation between the above two points (18 and 35).
      Beware that an Offered Delivery Time of 36 weeks or more will be considered non-compliant.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The Tenderer must as part of the sub-criterion “Contract Terms” include a list of proposed deviations to the attached contractual terms, cf. Framework Agreement LOT 1 (doc. no. 26/11959-4), Appendix 0: Agreement under Framework Agreement LOT 1 (doc. no. 26/11959-5), and Appendix 1: General Terms and Conditions for Services LOT 1 (doc. no. 26/11959-6). The proposed deviations should be explicit and with explanation as to why they are made. The Contracting Authority encourages the tenderer to include any deviations in Appendix 0A: Clarification List under sheet “Legal Clarification”.

      Evaluation Method

      The tendered assignment must be performed based on the attached contract terms. Except for the following sections in:
      In the Framework Agreement for LOT 1 (doc. no. 26/11959-4):

      • Clause 2 – Contract Documents
      • Clause 6 - Confidentiality
      • Clause 13 – Disputes & Applicable Law
        In the Agreement under Framework Agreement LOT 1 (doc. no. 26/11959-5):
      • Clause 2 – Documents forming the Agreement
      • Clause 7 – Contract data, Appendix 1D (Labour Clause)
        In General Terms and Conditions for Services LOT 1 (doc. no. 26/11959-6):
      • Sub-Clause 4.3, 4.4 and 4.5 – Contract Price and Payment
      • Clause 20 - Confidentiality
      • Clause 23 – Foreign Direct Investment (FDI Act)
      • Clause 26 – Disputes & Applicable Law
      • Appendix 1D (Labour Clause)
      • Appendix 1E – Code of Conduct for Business Partners
      • Appendix 1F – Code of Conduct Contract Clause, doc. no. 26/11959-7
        which are not part of the evaluation of “Contract terms”. These terms are mandatory.
        It is possible for the Tenderer to make explicit and well-explained deviations. These will be included in the evaluation of the sub-criterion” Contract terms" and it is noted that any deviations may lead to a reduction to the score depending on the content, clarity and consequence. In this regard it is explicitly noted that deviations which intend to limit liability and shift the financial risk in favour of the tenderer will be of particular importance in the evaluation. No deviations, and therefore absolute fulfilment of the contract terms, will result in a maximum score of ten (10).
        An overall evaluation will be made of this sub-criterion. A minimum score of four (4) must be achieved for the tender to be compliant, cf. section 3.7.1.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The Tenderer must as part of the sub-criterion “Contract Terms” include a list of proposed deviations to the attached contractual terms, cf. Framework Agreement LOT 2 (doc. no. 26/11960-2), Appendix 0: Agreement under Framework Agreement LOT 2 (doc. no. 26/11960-3), and Appendix 1: General Terms and Conditions for Services LOT 2 (doc. no. 26/11960-4). The proposed deviations should be explicit and with explanation as to why they are made. The Contracting Authority encourages the tenderer to include any deviations in Appendix 0A: Clarification List under sheet “Legal Clarification”.

      Evaluation Method

      The tendered assignment must be performed based on the attached contract terms. Except for the following sections in:
      In the Framework Agreement for LOT 1 (doc. no. 26/11960-2):

      • Clause 2 – Contract Documents
      • Clause 6 - Confidentiality
      • Clause 13 – Disputes & Applicable Law
        In the Agreement under Framework Agreement LOT 2 (doc. no. 26/11960-3):
      • Clause 2 – Documents forming the Agreement
      • Clause 7 – Contract data, Appendix 1D (Labour Clause)
        In General Terms and Conditions for Services LOT 2 (doc. no. 26/11960-4):
      • Sub-Clause 4.3, 4.4 and 4.5 – Contract Price and Payment
      • Clause 20 - Confidentiality
      • Clause 23 – Foreign Direct Investment (FDI Act)
      • Clause 26 – Disputes & Applicable Law
      • Appendix 1 D (Labour Clause)
      • Appendix 1E – Code of Conduct for Business Partners
      • Appendix 1F – Code of Conduct Contract Clause LOT 2, doc. no. 26/11960-5
        which are not part of the evaluation of “Contract terms”. These terms are mandatory.
        It is possible for the Tenderer to make explicit and well-explained deviations. These will be included in the evaluation of the sub-criterion” Contract terms" and it is noted that any deviations may lead to a reduction to the score depending on the content, clarity and consequence. In this regard it is explicitly noted that deviations which intend to limit liability and shift the financial risk in favour of the tenderer will be of particular importance in the evaluation. No deviations, and therefore absolute fulfilment of the contract terms, will result in a maximum score of ten (10).
        An overall evaluation will be made of this sub-criterion. A minimum score of four (4) must be achieved for the tender to be compliant, cf. section 3.7.1.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet

    From the notice

    • The Contracting Authority intends to procure components and associated services for Energinet’s gas-related infrastructure and facilities. The tender consists of two separate Framework Agreements: •LOT 1 - Purchase of Sleeves, Split Tees incl. Hot Tapping and Stopple Services •LOT 2 - Methane Re-compression Services For each LOT, the Contracting Authority intends to award Framework Agreements to two Suppliers. The Framework Agreements have a duration of eight (8) years and may be terminated by either Party upon six (6) months' written notice, cf. section 9.3 of the applicable Framework Agreement. The Framework Agreements are intended to support operations, maintenance activities and projects concerning Energinet’s gas-related infrastructure and facilities. Energinet Gastransmission A/S is expected to award the majority of subsequent contracts under the Framework Agreements. The Framework Agreements may also be used by other subsidiaries within the Energinet Group in accordance with the provisions of the applicable Framework Agreement. It is expected that the Framework Agreements will primarily be used by Energinet Gastransmission A/S and Gas Storage Denmark A/S. The Framework Agreements may also be used by Energinet Brint A/S should a relevant need arise during the term of the Framework Agreements. The estimated and maximum values of each LOT are stated below. The estimates have been calculated based on historical consumption combined with the anticipated requirements during the term of the Framework Agreements. The stated consumption figures and values are estimates only and are therefore not binding on the Contracting Authority. During the term of the Framework Agreements, the Contracting Authority has the right, but not the obligation, to purchase the goods and services covered by the Framework Agreements from the selected Suppliers, cf. section 1.3 of the applicable Framework Agreement.

    • Contact

      Kirsten Ebstrupprocurement@energinet.dk
    • Type
      Competition · Framework agreement · Prequalification
    • Main code
      Services related to the oil and gas industry
      76000000
    • 50514300Sleeving repair services60300000Pipeline transport services76510000Onshore services76600000Pipeline-inspection services

    Similar active competitions

    • HOFOR Fjernvarme P/S

      Elektrisk utstyr og belysning

      SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear

      HOFOR Fjernvarme P/S is procuring the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handover of power transformers and 132 kV SF₆-free gas-insulated switchgear for the Svanemøllen Energy Centre in Copenhagen. The procurement is divided into two lots: transformers, including cooling systems, accessories, documentation and training; and GIS, including local control cubicles, monitoring equipment, accessories, documentation and training. The maximum total contract value is EUR 10 million. The negotiated competition has prequalification followed by tendering and evaluation; up to four applicants per lot will be invited to tender, with negotiations expected. Lot 1 applicants must provide at least two completed references from the past five years for comparable or higher-rated power transformers, including factory acceptance testing and site commissioning support. Award criteria for each lot are price (45%), technical solution and project execution (15%), commercial and contractual terms (7.5%), and health and safety (5%).

      Competition with qualification
      Nov 27, 2026(28 days)
      €10,000,000
    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification system
      Dec 16, 2028(100+ days)
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(3 days)
      €30,442,953