    Re-tender - Framework agreement regarding Third-Party Verification and Certification of the Danish Hydrogen Backbone

    Energinet Brint A/S

    Re-tender - Framework agreement regarding Third-Party Verification and Certification of the Danish Hydrogen Backbone

    1. Competition notice published

      Nov 13, 2025 10:40 AMNovember 13, 2025 10:40 AM
    2. Contract signed

      Jul 23, 12:00 AMJuly 23, 2026 12:00 AM
    3. Result notice published

      Aug 19, 9:49 AMAugust 19, 2026 9:49 AM

    Brief

    Denmark: Tenders/Energinet Brint A/S/Re-tender - Framework agreement regarding Third-Party Verification and Certification of the Danish Hydrogen Backbone

    Awarded

    The competition has ended and a winner has been selected.

    Award
    CV and Organization 30% and 2 more
    Procedure
    With negotiationTwo stages
    Agreement
    Framework agreement
    Estimated value
    €26Mover 5 years

    Brief

    Energinet Brint A/S has entered into a framework agreement with Bureau Veritas Denmark A/S for the delivery of third-party verification and certification services for the Danish Hydrogen Backbone project, which aims to establish a hydrogen infrastructure in Denmark. The services will cover all phases of the DHB-1 project, from detailed design to testing and commissioning, and are intended to be used for the full backbone. The contract has a duration of 5 years and an estimated total maximum value of 26,000,000 EUR. Specific requirements included a detailed solution description, CVs for key personnel demonstrating relevant experience in hydrogen projects, pipeline, plant and process equipment review, Danish legislation, and relevant codes and standards, as well as a detailed project-specific organizational structure. Three bids were received for this contract.

    Tekniske kontrolltjenester

    Result

    TED
    • Bureau Veritas Denmark A/S
      Winner
    • Number of bids
      3
    • Contract value
      €13,000,000
    • Maximum framework agreement valueUp to €26,000,000

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      Egenkapital fra siste årsrapport må, på tidspunktet for prekvalifisering, være minst 2 000 000 EUR.

      Documentation Requirement

      Søkeren må bekrefte økonomisk evne i ESPD del IV.B med informasjon fra siste årsrapport angående egenkapital. Hvis søkeren baserer seg på kapasiteten til andre enheter (f.eks. et tilknyttet selskap eller en underleverandør) eller søkeren er en gruppe økonomiske aktører (f.eks. et konsortium), må informasjonen for ESPD del IV.B også gis i et separat ESPD fra hver av disse enhetene. Det er søkerens eget ansvar å sikre at minimumskravene er oppfylt basert på konsolidering når søkeren baserer seg på kapasiteten til andre enheter eller når søkeren er en gruppe økonomiske aktører.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Egenkapitalandelen fra siste årsrapport må, på tidspunktet for prekvalifisering, være minst 15 prosent.

      Documentation Requirement

      Søkeren må bekrefte økonomisk evne i ESPD del IV.B med informasjon fra siste årsrapport angående egenkapitalandel (egenkapital/totale eiendeler), oppgitt med to desimaler. Hvis søkeren baserer seg på kapasiteten til andre enheter (f.eks. et tilknyttet selskap eller en underleverandør) eller søkeren er en gruppe økonomiske aktører (f.eks. et konsortium), må informasjonen for ESPD del IV.B også gis i et separat ESPD fra hver av disse enhetene. Det er søkerens eget ansvar å sikre at minimumskravene er oppfylt basert på konsolidering når søkeren baserer seg på kapasiteten til andre enheter eller når søkeren er en gruppe økonomiske aktører.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      The tenderer must enclose a detailed ‘Solution Description’ for the contract tendered in relation to all elements as requested in Enclosure D – Case description to “Solution Description”- doc. 25/15305-5. Responses in relation to the ‘Solution Description’ should be a general description of the interpretation of the Tenderer to the requested Scope of Services and contain as a minimum all information requested in Enclosure D. Reponses shall be discussed as a part of the negotiation and clarification meeting(s). The response can be otherwise unconstrained but must be a maximum of twenty (20) A4 pages, including 2,400 characters spaced per A4 page or a total number of characters of 48,000 distributed over the twenty (20) pages. If the scope of the response exceeds the maximum number of pages, only the first twenty (20) pages will be considered in the assessment, or if the number of characters exceeds 48,000 characters, then only the material within this impact limit will be evaluated. Front page and table of contents do not count. For the sub‐criteria “Solution description” it is a minimum requirement that the tenderers reach a minimum score of four (4), cf. section 3.7.1.

      Evaluation Method

      The evaluation of the “Solution description” will depend upon the content and level of detail of the proposed solution description in relation to fulfilment of the Scope of Services.

      It will be evaluated highly positively if:

      • The description demonstrates a high level of ability to identify relevant activities and challenges in relation to the topics raised in Enclosure D
      • The description proposes appropriate and specific methods, tools and processes for managing verification and certification services

      An overall evaluation of this sub criterion will be made.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For the evaluation of this sub-criteria the following should be enclosed: * One (1) CV for the Project Manager * One (1) CV for the discipline lead for the WP “Detailed design” * One (1) CV for the discipline lead for the WP “Fabrication and manufacture” * One (1) CV for the discipline lead for the WP “Installation and construction” * One (1) CV for the discipline lead for the WP “Testing and pre-commissioning” Only category 1 and category 2 shall be presented within the requested five (5) CVs above. As a minimum requirement there shall be submitted one (1) CV for category 1 and one (1) CV for category 2, the remaining three (3) CVs shall be either category 1 or category 2. The above submitted CVs demonstrated will be recognized as the key personnel offered to the Client for the period of the framework agreement and the Agreement under the Framework Agreement incl. CTRs. Further the Client requests two (2) CVs. The two (2) CVs shall be represented by one (1) CV within category 3 and one (1) CV within category 4. The submitted above CVs for category 3 and 4 are considered as a frame of reference for experience and competences that will be complied to under the duration of the framework agreement and for evaluation purpose. A CV is not to be reused, and the Client therefore requests seven (7) independent CVs. All submitted CVs shall be numbered from 1-7 and this number must be referred and transferred to as a reference in Enclosure C – Price List (doc. 25/15305-6). No CVs shall be submitted in category 5. The CVs should include a detailed description of experience and competences of relevancy to the tendered assignment considering the position for which the CV is proposed (e.g. experience within that position, experience with similar assignments etc.). Max. number of pages per CV is limited to three (3) pages, if the CV contains more than three (3) pages only the first three (3) pages will be evaluated. The tenderer should furthermore enclose a detailed description of the project specific organizational structure which will be allocated to major phases of the assignment (detailed design, fabrication & manufacture, construction, installation and testing), including: * Level of involvement of the key personnel and how the competences of the key personnel will be used for the specific assignment * How the key personnel complement each other within the organization structure * How external interfaces are administrated, including how subcontractors (if any) will be involved and administrated. * The availability and structure of additional expert or ‘second line’ support * How lines of communication internally and externally will be handled appropriately and efficiently The description “Organization” must not exceed six (6) A4 pages. If the scope of the response goes beyond the maximum number, only the first six (6) pages will be considered in the assessment of each sub-agreement. The front page and table of contents do not count. Further to the detailed description of “Organization”, the tenderer should include a visual chart illustrating the organizational structure. This is not a part of the six (6) pages. For all other sub‐criteria than “Price” it is a minimum requirement that the tenderers reach a minimum score of four (4) to be compliant, cf. section 3.7.1

      Evaluation Method

      The evaluation of “CVs” will be based on the demonstrated competences and experiences in the included CVs with respect to the tendered assignment and the specific role of the key person, including to which degree the individual key personnel will be involved in the fulfillment of the assignment and how they complement each other.

      It will be evaluated highly positively if the CV demonstrates:

      • Relevant experience with hydrogen projects or equivalent
      • Relevant experience, competencies and expertise regarding review of project documentation within all elements of pipeline, plant and process equipment
      • Relevant experience and familiarity with working within Danish legislation and working practices
      • Relevant experience with Codes, Standards, Guidelines and Industry Practices of relevancy with respect to gas transport, storage and processing, including (for example) ATEX, LVD, PED, fire-safety.

      The evaluation of “Organization” will be based on whether the proposed organizational structure is operationally efficient and has clear lines of communication taking into consideration the scope of the assignment.

      It will be evaluated highly positively if the description of organization demonstrates:

      • An organizational structure, which demonstrates the ability to provide the requested verification and certification services throughout the period of contract
      • An active, accredited, integrated risk, safety and quality management system
      • Accreditation to as many of the relevant directives, executive orders, codes, standards and guidelines, as possible e.g. Accreditation to: PED module G (EU), Danish Executive Order 99 (DK) and/or Danish Executive Order 498 (DK)
      • Demonstrated ‘Organizational Readiness’ through active participation with research or joint-industry projects related to this assignment.

      An overall evaluation will be made of this sub-criterion.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Prices must be stated in the attached Enclosure E - Price List (Doc. 25/15305-6) and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR.

      Evaluation Method

      When evaluating 'Price', the Contracting Authority will evaluate the total weighted hourly rates (for evaluation purposes), cf. the Price List item 500.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The tenderer must as part of the sub-criterion “Contract Terms” include the following (if applicable): * A list of proposed deviations to the attached contractual terms, cf. legal documents: the Framework Agreement (doc.no. 25/15305-10), the Agreement under the Framework Agreement (doc.no. 25/15305-11) and the General terms and Conditions for Verification and Certification Services (doc.no. 25/15305-12), which shall be stated in the “Clarification List” under the sheet “Legal”. The proposed deviations should be explicit and with explanation as to why they are made. For all other sub‐criteria than “Price” it is a minimum requirement that the tenderers reach a minimum score of four (4) to be compliant, cf. section 3.7.1

      Evaluation Method

      The tendered assignment must be performed on the basis of the attached Contract Terms. With the exception of the following sections in:

      • The legal conditions stated in the Framework Agreement (doc.no. 25/15305-10)
        • Clause 2 (Documents forming the Agreement)
        • Clause 14 (Disputes and Applicable Law)
      • The legal conditions stated in the Agreement under the Framework Agreement (doc.no. 25/15305-11)
        • Clause 2 (Documents forming the Agreement)
      • The legal conditions stated in the General terms and Conditions for Verification and Certification Services (doc.no. 25/15305-12)
        • Sub-clause 6.13 (Invoicing)
        • Sub-clause 6.14 and 6.15 (Final date for payment and late payment)
        • Clause 25 (Disputes and applicable law)

      which is not part of the evaluation of “Contract terms”, as these terms are mandatory, and it is therefore not possible for the tenderer to have deviations to these sections.

      It is contrary possible for the tenderer to make explicit and well explained deviations to the other sections.

      Any deviation will be included in the evaluation of the sub criterion "Contract terms" and it is noted that any deviations may lead to a reduction to the score depending on the content, clarity and consequence. In this regard it is explicitly noted that deviations which intend to limit liability and shift the financial risk in favor of the tenderer will be of particular importance in the evaluation. No deviations, and thereby absolute fulfillment of the contract terms, will result in a maximum score of ten (10).

      An overall evaluation will be made of this sub-criterion.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet Brint A/S

    From the notice

    • The Danish Hydrogen Backbone project (DHB) is a comprehensive effort to establish a hydrogen infrastructure in Denmark, connecting planned large-scale hydrogen production in Denmark, produced from renew-able energy sources such as wind and solar, with the German and European hydrogen markets. The project is part of the European hydrogen infrastructure and significantly contributes to the EU's goals of climate neutrality and reduction of greenhouse gas emissions. The full backbone is planned to extend all the way from underground storage in the northern part of Denmark (Lille Torup) to the German border (Frøslev), but a political decision has been made to initially focus on building the southern part of the system (DHB1) and thereby having this part operational by the end of 2030. The scope of services for the framework agreement has an intention of describing all phases of the DHB-1 project from detailed design to testing and commissioning for the purpose of taking the hydrogen transmission asset into operation, thus the framework agreement is also intended to be used for the remaining part of the Danish Hydrogen Backbone project and therefore covering the full backbone. For further information please see Scope of services – Appendix 2, sec. 2.1. The Contracting Authority wants to purchase verification and certification services from an independent, third-party agency in order to satisfy those verification and certification requirements laid down under the compliance plan. For further details regarding the tender, reference is made to the tender documents. The value of the framework agreement is expected to amount to 13.000.000 EURO with the possibility of extension with 100% which amounts to the total value of 26.000.000 EUR.Main features of the procedureThe tenders submitted must be valid for a period of six (6) months as from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders.

    • Contact

      Procurement - Sprocurement@energinet.dk
    • Type
      Result · Framework agreement · Prequalification
    • Main code
      Architectural, construction, engineering and inspection services
      71000000
    • 71631000Technical inspection services79132000Certification services

    Similar active competitions

    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification system
      Dec 16, 2028(100+ days)
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(4 days)
      €30,442,953
    • Ministry of Foreign Affairs of Denmark

      Markeds- og opinionsundersøkelser

      Consultancy framework agreement for formulation, appraisal and review of Danish development cooperation programmes and projects

      The Ministry of Foreign Affairs of Denmark seeks a multi-supplier framework agreement for 2 years, with a maximum total value of DKK 250 million, to provide consultancy services for the formulation, appraisal and review of Denmark’s bilateral development cooperation programmes and projects, funded by official development assistance. The work is divided into two lots: climate, environment, private sector and financing; and governance, fragility and migration. Assignments will be commissioned individually and may cover programme or project formulation, appraisal as a quality-assurance milestone, and reviews during implementation; evaluations and several other service areas are excluded. The framework is intended to provide timely access to specialists and improve service quality, and five suppliers will be selected for each lot. Award criteria are thematic specialists (48%), quality assurance (16%), organisational and management approach (12%), mobilisation of specialists (12%) and financial management specialists (12%). Applicants must document at least DKK 25 million in relevant official-development-assistance consultancy turnover across the three most recent available financial years, and provide up to 10 relevant references per lot for services performed in the preceding five years.

      Framework agreement with qualification
      Nov 24, 2026(26 days)