Ireland: Tenders/Medite Europe DAC/Request for Tender for Facility Upgrades to Line 2 and BDR Control Rooms at MEDITE Europe DAC ‘25

Request for Tender for Facility Upgrades to Line 2 and BDR Control Rooms at MEDITE Europe DAC ‘25

Expired

The competition has expired without a winner being announced.

Deadline
Aug 15, 2025Expired
Procedure
OpenSingle stage
Agreement
Construction work
Estimated value
€180K

Brief

MEDITE Europe DAC requires an upgrade of facilities in its premises as outlined in this document. Site Location: Medite, Redmondstown, Clonmel, Co. Tipperary. It is envisaged that the works will commence in Q3 of 2025. Please note that the successful Bidder is responsible for the Supply and Installation of the fit out works, including alteration work as required, pipework and all materials, components, plant, labour and equipment to complete the works as set-out in the Scope of Works. The works will take place on a live MDF manufacturing facility as outlined in the tender specification. For the duration of this contract, the factory will remain in production. Medite is an operating mill with production activity on‐going within the area and therefore full compliance with Medite’s EHS Contractor Requirements is necessary. Due to the nature of works as set out in this Tender and other maintenance + construction activity being carried out on site, these have been deemed to be “CONSTRUCTION WORK’’ as per the HSA’s Safety Health and Welfare at Work (Construction) Regulations 2013. The Project Supervisor Construction Stage must: • Co-ordinate the implementation of the construction regulations by contractors. • Organise co-operation between contractors and the provision of information. • Co-ordinate the reporting of accidents to the Authority. • Notify the Authority before construction commences where construction is likely to take more than 500 person days or 30 working days. • Provide information to the site safety representative. • Co-ordinate the checking of safe working procedures. • Co-ordinate measures to restrict entry on to the site. • Co-ordinate the provision and maintenance of welfare facilities. • Co-ordinate arrangements to ensure that craft, general construction workers, and security workers have a Safety Awareness card, e.g. Safe Pass and a Construction Skills card where required. • Co-ordinate the appointment of a site safety representative where there are more than 20 people on site. • Provide all necessary safety file information to the PSDP. • Monitor the compliance of contractors and others and take corrective action where necessary. • Notify the Authority and the client of non-compliance with any written directions issued. • The PSCS may issue directions to designers or contractors. Contractors must: • Co-operate with the PSCS. • Provide any site-specific information or relevant extract of your safety statement to the PSCS. • Promptly provide the PSCS with information required for the safety file. • Comply with directions from Project Supervisors. • Report accidents to the Authority and to the PSCS where an employee cannot perform their normal work for more than three days. • Comply with site rules and the safety and health plan and ensure that your employees comply, identify hazards, eliminate the hazards, or reduce risks during construction. • Facilitate the Site Safety Representative. • Ensure that relevant workers have a safety awareness card and a construction skills card where required. • Provide workers with site specific induction. • Appoint a safety officer where there are more than 20 on site or 30 employed. • Consult workers and Safety Representatives. • Monitor compliance and take corrective action. **** Please see the attached Tender Document for the Full and Complete Scope of Works

Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

Register interest

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Medite Europe DAC

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

From the notice

  • MEDITE Europe DAC requires an upgrade of facilities in its premises as outlined in this document. Site Location: Medite, Redmondstown, Clonmel, Co. Tipperary. It is envisaged that the works will commence in Q3 of 2025. Please note that the successful Bidder is responsible for the Supply and Installation of the fit out works, including alteration work as required, pipework and all materials, components, plant, labour and equipment to complete the works as set-out in the Scope of Works. The works will take place on a live MDF manufacturing facility as outlined in the tender specification. For the duration of this contract, the factory will remain in production. Medite is an operating mill with production activity on‐going within the area and therefore full compliance with Medite’s EHS Contractor Requirements is necessary. Due to the nature of works as set out in this Tender and other maintenance + construction activity being carried out on site, these have been deemed to be “CONSTRUCTION WORK’’ as per the HSA’s Safety Health and Welfare at Work (Construction) Regulations 2013. The Project Supervisor Construction Stage must: • Co-ordinate the implementation of the construction regulations by contractors. • Organise co-operation between contractors and the provision of information. • Co-ordinate the reporting of accidents to the Authority. • Notify the Authority before construction commences where construction is likely to take more than 500 person days or 30 working days. • Provide information to the site safety representative. • Co-ordinate the checking of safe working procedures. • Co-ordinate measures to restrict entry on to the site. • Co-ordinate the provision and maintenance of welfare facilities. • Co-ordinate arrangements to ensure that craft, general construction workers, and security workers have a Safety Awareness card, e.g. Safe Pass and a Construction Skills card where required. • Co-ordinate the appointment of a site safety representative where there are more than 20 people on site. • Provide all necessary safety file information to the PSDP. • Monitor the compliance of contractors and others and take corrective action where necessary. • Notify the Authority and the client of non-compliance with any written directions issued. • The PSCS may issue directions to designers or contractors. Contractors must: • Co-operate with the PSCS. • Provide any site-specific information or relevant extract of your safety statement to the PSCS. • Promptly provide the PSCS with information required for the safety file. • Comply with directions from Project Supervisors. • Report accidents to the Authority and to the PSCS where an employee cannot perform their normal work for more than three days. • Comply with site rules and the safety and health plan and ensure that your employees comply, identify hazards, eliminate the hazards, or reduce risks during construction. • Facilitate the Site Safety Representative. • Ensure that relevant workers have a safety awareness card and a construction skills card where required. • Provide workers with site specific induction. • Appoint a safety officer where there are more than 20 on site or 30 employed. • Consult workers and Safety Representatives. • Monitor compliance and take corrective action. **** Please see the attached Tender Document for the Full and Complete Scope of Works

  • Contact

    John.Browne@mdfosb.com
  • Type
    Competition
  • Location
    Dublin
  • Main code
    Construction work for industrial buildings
    45213250
  • 44115800Building internal fittings45210000Building construction work45262700Building alteration work

Similar active competitions

  • Transport Infrastructure Ireland (TII)

    Kantine- og cateringvirksomhet

    TII542 TII/ML Facilities Mnagement

    Transport Infrastructure Ireland (TII) needs facilities management services under a 6+2+2-year contract, with a maximum total value of €2.38 million, for its Dublin offices and MetroLink locations. The work covers scheduled servicing and maintenance of buildings and building systems at Parkgate Business Centre (blocks A, B and C) and the Coopers Cross head office, including air-conditioning equipment, fire and intruder alarm systems, unscheduled callouts and repairs, reporting, and other facilities-related services and works. Precision Industrial Services Ltd holds a related TII facilities-services contract.

    Competition
    Dec 14, 2026(22 days)
    €2,380,000
  • The Irish Air Navigation Service

    Oppføring av bygninger

    Tender No 21 Main Contractor and PSCS Services for Upgrade / Alteration Works at Osprey House

    The Irish Air Navigation Service needs a main contractor to carry out upgrade and alteration works at Osprey House and the Shannon Enroute Centre in Ballycasey, County Clare. The works contract has a maximum total value of €1.7 million and a duration of 2 years, and includes provision of Project Supervisor Construction Stage (PSCS) services. The notice lists Dublin as the project location, while the specified work sites are in County Clare.

    Competition
    Dec 2, 2026(10 days)
    €1,700,000
  • Transport Infrastructure Ireland (TII)

    Kantine- og cateringvirksomhet

    M700.CN.1025 - Soft Facilities Management Services for MetroLink (TII)

    Transport Infrastructure Ireland (TII), as sponsoring agency for Dublin MetroLink, needs Soft Facilities Management services for its project team at Coopers Cross in Dublin, with a maximum contract value of €2.86 million over 6 years. Services include reception and facilities staff, cleaning and consumables, coffee machines, stationery, courier, taxi and postal services, confidential shredding, facilities equipment maintenance, and maintenance of fire-safety and first-aid equipment in MetroLink-controlled areas; the contract may also cover support for future MetroLink site offices. The notice states that TII’s Coopers Cross lease is for 10 years, with an option to extend to a maximum of 15 years. Precision Industrial Services Ltd has a related TII facilities-services award.

    Competition
    Nov 23, 2026(1 day)
    €2,860,000