Search
  • Search


    Supplier qualification system for HVDC Converter substations

    Energinet Eltransmission A/S

    Supplier qualification system for HVDC Converter substations

    1. Result notice published

      Apr 24, 6:06 AMApril 24, 2026 6:06 AM

    Brief

    Denmark: Tenders/Energinet Eltransmission A/S/Supplier qualification system for HVDC Converter substations

    Cancelled

    The competition has been cancelled.

    Qualification deadline
    Apr 23,Expired
    Procedure
    With negotiationTwo stages
    Agreement
    Buying goods

    Brief

    Energinet Eltransmission A/S intends to establish a Supplier Qualification System for the procurement of HVDC converters, HVDC- and HVAC-substations, primarily for interconnector and offshore wind energy projects like the Bornholm Energy Island project. The scope of work for suppliers may cover development, design, engineering, procurement, manufacturing, transportation, delivery, construction, installation, testing, commissioning, maintenance, and documentation of HVDC and HVAC installations. HVDC installations should be based on VSC-MMC technology in a half-bridge arrangement, arranged as a bipolar system with Dedicated Metallic Return (DMR), have a transmission capacity range of approximately 1.2 to 2 GW, be capable of absorbing or generating reactive power independently from active power, and be rated for a DC voltage level of ±525 kV. The offshore AC substations will connect offshore wind parks and supply the local grid, and deliverables may also include onshore HVAC substations and a coordinated control system.

    Elektrisk infrastruktur og veibelysning

    Result

    TED
    • Reason for cancellation
      Annet
    • Number of bids
      5

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet Eltransmission A/S

    From the notice

    • Energinet and 50 Hertz intends to establish a Supplier Qualification System (“SQS”) for the procurement of HVDC converters, HVDC- and HVAC-substations in connection to the converters. The SQS is mainly intended for interconnector and offshore wind energy related projects such as the Bornholm Energy Island project. In the following, the requirements for a typical project are outlined. Deviations may, however, occur during the lifespan of the SQS. The scope of works of the supplier may cover development, design, engineering, relevant studies and reports, procurement, manufacturing, packaging, transportation, delivery, construction, installation, testing, commissioning, maintenance and documentation of HVDC and HVAC installations. HVDC installations may include: 1. The offshore and/or onshore converters (together ‘the Converters’) for the HVDC Substations and in particular: a. the primary systems b. the secondary systems including black start diesel generators The HVDC substations should 1. be based on VSC-MMC technology, using MMC Building Blocks in a half-bridge arrangement. 2. be arranged as a bipolar system with Dedicated Metallic Return (DMR) 3. have a transmission capacity range from approximately 1,2 to 2 GW 4. have the capability to absorb or generate reactive power independently from the active power (as further specified in each tender) 5. be rated for a DC voltage level of ±525 kV The HVDC offshore converter stations may, amongst other things, include a DC switchyard (the offshore DC switchyard) that: In the following, the requirements for a typical project are outlined. Deviations may, however, occur during the lifespan of the SQS. The scope of works of the supplier may cover development, design, engineering, relevant studies and reports, procurement, manufacturing, packaging, transportation, delivery, construction, installation, testing, commissioning, maintenance and documentation of HVDC and HVAC installations. HVDC station installations may include: 1. The offshore and/or onshore converters (together ‘the Converters’) for the HVDC Substations and in particular: a. the primary systems (AC and DC) b. the secondary systems including but not limited to control and protection systems, black start diesel generators, auxiliary and ancillary systems The HVDC substations should 1. be Voltage Source Converter (VSC), which must be realised as a multi-level converter half-bridge arrangement. 2. be arranged as a bipolar system with Dedicated Metallic Return (DMR) 3. have a transmission capacity range from approximately 1,2 to 2 GW 4. have the capability to absorb or generate reactive power independently from the active power (as further specified in each tender) 5. be rated for a DC voltage level of ±525 kV The HVDC converter stations may, amongst other things, include a DC switchyard (the DC switchyard) that: 1. Should have the necessary components to connect and disconnect any combination of the HVDC converter stations of the respective tender under load. 2. Should be prepared so that future expansions can be carried out concurrently with the existing HVDC links being in normal operation. Brief reduction of current in a single pole at a time is allowed. The offshore AC substations will accommodate connection of offshore wind park connection and supply the local grid. The deliverables may include onshore HVAC substations. Further, the deliverables may include a coordinated control system for the overall project’s system. Finally, the deliverables may include installation, test and subsequent maintenance in connection with the above.Main features of the procedureEstablishing a supplier qualification system.

    • Contact

      Procurement - Aprocurement@energinet.dk
    • Type
      Result · Prequalification
    • Main code
      Transformers
      31170000
    • 31200000Electricity distribution and control apparatus45232220Substation construction work45232221Transformer substation45317200Electrical installation work of transformers

    Similar active competitions

    • TenneT TSO B.V.

      Elektrisk infrastruktur og veibelysning

      Qualification System - 2 GW HVDC Stations (Converter Systems & Platforms) - (previous NX 202008)

      Please note!!!: This publication does not concern a new Qualification System but is a continuation of the Qualification System previously published in Negometrix under number 202008 and the supplement to the Official Journal of the European Union (http://ted.europa.eu) under number 2022/S 125-356696. Negometrix Tender 203753 has been conducted under this Qualification System and has been finished in 2023. Currently no new tender under this Qualification System is foreseen, hence TenneT is not planning to review new requests for qualification under this Qualification System. The scope of this Qualifications System are for the Category Converter (A) and / or the Category Platform (B) Category A Converter: The scope of this category includes in particular: HVDC converter systems for offshore and onshore converter stations and maintenance of the complete HVDC converter stations and optional the civil works for the onshore converter stations. Category B Platform; The scope of this category includes in particular: design, engineering, production, transportation, delivery, project management, installation and commissioning of the offshore platform (topside and jacket) and optional maintenance for the auxillary systems. Under this Qualification System TenneT will issue separate tenders. Each tender for an offshore Grid Connection System will include the full scope of Category A and B. This means there will be no scope split between offshore platform and HVDC. In case of a purely onshore-onshore connection the tender scope will not include the platform (category B).

      Qualification system
      Feb 15, 2027(109 days)
    • Energinet

      Geotekniske undersøkelser

      Supplier Qualification System for Geoscience Services

      Energinet etablerer et leverandørkvalifikationssystem (SQS) for indkøb af geofysiske og geotekniske ydelser både på land og offshore. Systemet omfatter syv kategorier: Offshore Geofysiske Stedundersøgelser, Offshore Geotekniske Stedundersøgelser, Offshore Ruteundersøgelser, Onshore Stedundersøgelser, Offshore UXO Undersøgelser, Offshore UXO Rådgivning og Offshore Kabel- og Rørsporing. For at blive optaget i SQS skal ansøgeren opfylde minimumskravene i den seneste årsrapport, som beskrevet i "Guide til SQS" (dok. nr. 20/02476-2) afsnit 3.2.1.1, hvor minimumskravene varierer mellem de forskellige kategorier.

      Qualification system
      Dec 31, 2030(100+ days)
    • KONSTANT Net A/S

      Elektrisk infrastruktur og veibelysning

      Kvalifikationsordning, Komponenter med tilknyttede ydelser til 60 kV anlæg

      KONSTANT Net A/S søger leverandører til en kvalifikationsordning for komponenter med tilknyttede ydelser til 60 kV anlæg, der skal leveres i hele KONSTANT Net A/S' forsyningsområde i Østjylland. Kvalifikationsordningen omfatter en række kategorier, herunder krafttransformere, shunt-reaktorer, slukkespoler, primære koblingsanlæg, måletransformere, adskillere og jordsluttere samt GIS og AIS anlæg. Der stilles krav om en soliditetsgrad på mindst 15% og positiv egenkapital i det senest afsluttede årsregnskab.

      Qualification system
      Dec 31, 2056(100+ days)